Removal of the IGGS In-Tank Housing
TASK 47-20-41-000-001-A
Removal of the IGGS In-Tank Housing
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 47-20-41-941-050-A ** ON A/C NOT FOR ALL
Subtask 47-20-41-020-050-A ** ON A/C NOT FOR ALL
(2) Remove the screw (4) and disconnect the bonding lead (5) from the IGGS in-tank housing (3).
(3) Remove the screw (8) and the bonding lead (7).
(4) Disconnect the union (6) from the IGGS in-tank housing (3).
(5) Put the PLUG-BLANKING in each disconnected line end.
(6) Hold the IGGS in-tank housing (3) and remove the nuts (1).
(7) Carefully remove the IGGS in-tank housing (3).
(8) Remove and discard the O-ring (2).
[Rev.10 from 2021]
2026.04.02 06:26:18 UTC
Removal of the IGGS In-Tank Housing
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
YOU MUST WEAR SAFETY BREATHING EQUIPMENT WHEN YOU DO WORK IN THIS AREA. THIS AREA CAN CONTAIN AIR FROM THE TANK INERTING SYSTEM. AIR FROM THIS SYSTEM HAS A LOW-OXYGEN CONTENT AND CAN CAUSE INJURY AND DEATH.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | AR | PLUG - BLANKING |
| No specific | AR | SAFETY BARRIER(S) |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 141 | WING CENTER BOX |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 28-10-00-910-002-A | Access to the Fuel Tanks and the Work Areas |
| TASK 28-10-00-910-003-A | Safety Procedures When You Do Work in a Dry Fuel Tank |
| TASK 28-25-00-650-001-A | Pressure Defuel |
| TASK 28-25-00-650-003-A | To Drain Remaining Fuel from the Wing Tanks and the Center Tank |
| TASK 28-25-00-650-003-A-01 | To Drain Remaining Fuel from the Wing Tanks and the Center Tank |
| TASK 47-20-43-000-001-A | Removal of the Dual-Flapper Check Valve |
Subtask 47-20-41-941-050-A ** ON A/C NOT FOR ALL
A. Safety Precautions
(2) Put the SAFETY BARRIER(S) in position.
Subtask 47-20-41-860-050-A ** ON A/C NOT FOR ALL WARNING:
BEFORE YOU DO WORK IN OR NEAR A FUEL TANK, MAKE SURE THAT YOU OBEY ALL THE SAFETY PROCEDURES. THIS WILL PREVENT INJURY TO PERSONS AND/OR DAMAGE TO THE AIRCRAFT.
(1) You must obey the fuel safety procedures when you do work in a fuel tank (Ref. AMM TASK 28-10-00-910-003). (2) Put the SAFETY BARRIER(S) in position.
B. Aircraft Maintenance Configuration
(1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
Subtask 47-20-41-865-050-A ** ON A/C NOT FOR ALL (1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
C. Open, safety and tag this(these) circuit breaker(s):
Subtask 47-20-41-650-050-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | IGGS/CTRL | 7YA | N28 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | IGGS/CTRL | 7YA | P28 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | CSAS / CTRL | 1HW | U17 |
D. Fuel Configuration
(1) Defuel the center tank (Ref. AMM TASK 28-25-00-650-001).
(2) Drain the remaining fuel from the center tank (Ref. AMM TASK 28-25-00-650-003).
Subtask 47-20-41-010-050-A ** ON A/C NOT FOR ALL (1) Defuel the center tank (Ref. AMM TASK 28-25-00-650-001).
(2) Drain the remaining fuel from the center tank (Ref. AMM TASK 28-25-00-650-003).
E. Get Access
(1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE at zone 142.
(2) Get access to the center tank (Ref. AMM TASK 28-10-00-910-002).
4. Procedure(1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE at zone 142.
(2) Get access to the center tank (Ref. AMM TASK 28-10-00-910-002).
Subtask 47-20-41-020-050-A ** ON A/C NOT FOR ALL
CAUTION:
BE CAREFUL WHEN YOU TOUCH THIS ASSEMBLY. IT HAS PRECISION- TOLERANCE COMPONENTS WITH VERY POLISHED SURFACES. IF YOU ARE NOT CAREFUL, IT IS VERY EASY TO CAUSE DAMAGE TO THESE COMPONENTS (INTERNAL CONTAMINATION, EXTERNAL IMPACT DAMAGE).
A. Removal of the IGGS In-Tank Housing NOTE: Two persons are necessary to do this procedure. One in the center tank to hold the IGGS in-tank housing and one on top of the center tank to remove the attaching parts.
(1) Remove the dual-flapper check valve (Ref. AMM TASK 47-20-43-000-001). (2) Remove the screw (4) and disconnect the bonding lead (5) from the IGGS in-tank housing (3).
(3) Remove the screw (8) and the bonding lead (7).
(4) Disconnect the union (6) from the IGGS in-tank housing (3).
(5) Put the PLUG-BLANKING in each disconnected line end.
(6) Hold the IGGS in-tank housing (3) and remove the nuts (1).
(7) Carefully remove the IGGS in-tank housing (3).
(8) Remove and discard the O-ring (2).
IGGS In-Tank Housing - Location and Detail