Installation of the Cellular-gatelink Subscriber Identity Module (SIM) Card
TASK 46-41-37-400-802-A
Installation of the Cellular-gatelink Subscriber Identity Module (SIM) Card
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 46-41-37-861-053-A ** ON A/C NOT FOR ALL
Subtask 46-41-37-420-051-A ** ON A/C NOT FOR ALL
Subtask 46-41-37-410-051-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:26:16 UTC
Installation of the Cellular-gatelink Subscriber Identity Module (SIM) Card
CAUTION:
DO NOT TOUCH THE CONNECTOR PINS OR OTHER CONDUCTORS ON THE COMPONENT DURING THE PROCEDURE. IF YOU TOUCH THESE CONDUCTORS, ELECTROSTATIC DISCHARGE CAN CAUSE DAMAGE TO COMPONENT.
CAUTION:
OBEY THESE PRECAUTIONS TO PREVENT ELECTROSTATIC DISCHARGE (ESD) DAMAGE TO THE COMPONENTS:
- STAY ON A CONDUCTIVE SURFACE THAT IS ELECTRICALLY GROUNDED.
- USE A CONDUCTIVE WRIST-STRAP THAT IS ELECTRICALLY GROUNDED. (CONNECTED TO A BONDING-POINT NEAR THE WORK AREA).
- BEFORE YOU USE THE TOOLS, MOMENTARILY HOLD THEM AGAINST AN ELECTRICAL GROUND TO RELEASE STATIC ELECTRICITY.
CAUTION:
DO NOT TOUCH THE METAL CONTACT OF THE SIM CARD. IF YOU DO, DAMAGE TO THE SIM CARD CAN OCCUR.
CAUTION:
INSTALL THE SIM CARDS VERY CAREFULLY AND MAKE SURE THAT YOU DO NOT CAUSE DAMAGE TO THEIR METAL CONTACTS. THIS WILL HELP TO PREVENT DAMAGE TO OTHER COMPONENTS.
ZONE: 120
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | 1 | SIM CARD |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 120 | AVIONICS COMPARTMENT |
| 824 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 46-41-00-710-812-A | Operational Test of the Cellular Gatelink |
| TASK 46-41-37-400-801-A | Installation of the Head-End Server Unit (HESU) |
| TASK 52-41-00-010-002-A | Open the Avionics Compartment Doors for Access |
| TASK 52-41-00-410-002-A | Close the Avionics Compartment Doors after Access |
| TASK 46-41-00-00 | CABIN INFORMATION NETWORK SYSTEM - DESCRIPTION AND OPERATION |
Subtask 46-41-37-861-053-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
Subtask 46-41-37-865-058-A ** ON A/C NOT FOR ALL (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
B. Open, safety and tag this(these) circuit breaker(s):
Subtask 46-41-37-010-054-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2000VU | CINS-HESU | 21RF | E02 |
C. Get access to the avionics compartment.
(1) For the location of this component, refer to paragraph Component Location
(Ref. AMM D/O 46-41-00-00).
(2) Put an ACCESS PLATFORM 2M (6 FT) in position at access door 824.
(3) Open access door 824 (Ref. AMM TASK 52-41-00-010-002).
(4) Make sure that the Head-End Server Unit (HESU) is correctly installed (Ref. AMM TASK 46-41-37-400-801).
4. Procedure(1) For the location of this component, refer to paragraph Component Location
(Ref. AMM D/O 46-41-00-00).
(2) Put an ACCESS PLATFORM 2M (6 FT) in position at access door 824.
(3) Open access door 824 (Ref. AMM TASK 52-41-00-010-002).
(4) Make sure that the Head-End Server Unit (HESU) is correctly installed (Ref. AMM TASK 46-41-37-400-801).
Subtask 46-41-37-420-051-A ** ON A/C NOT FOR ALL
A. Installation of the Cellular-gatelink SIM Card
(1) Do an inspection of the component interfaces and the adjacent area.
(2) Clean the component interfaces and the adjacent area.
(3) Loosen the screw (4) and open the flap (2) of the HESU (1).
(4) Remove the SIM CARD (3) from its packing.
(5) Put the SIM card (3) in the SIM card slot (5) of the HESU (1).
(6) Carefully push the SIM card (3) until it clicks.
(7) Close the flap (2) of the HESU (1) and tighten the screw (4) with your hand.
Subtask 46-41-37-865-059-A ** ON A/C NOT FOR ALL (1) Do an inspection of the component interfaces and the adjacent area.
(2) Clean the component interfaces and the adjacent area.
(3) Loosen the screw (4) and open the flap (2) of the HESU (1).
(4) Remove the SIM CARD (3) from its packing.
(5) Put the SIM card (3) in the SIM card slot (5) of the HESU (1).
(6) Carefully push the SIM card (3) until it clicks.
(7) Close the flap (2) of the HESU (1) and tighten the screw (4) with your hand.
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 46-41-37-710-051-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2000VU | CINS-HESU | 21RF | E02 |
C. Operational Test
(1) Do the operational test of the cellular-gatelink (Ref. AMM TASK 46-41-00-710-812).
5. Close-up(1) Do the operational test of the cellular-gatelink (Ref. AMM TASK 46-41-00-710-812).
Subtask 46-41-37-410-051-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Close access door 824 (Ref. AMM TASK 52-41-00-410-002).
(4) Remove the access platform(s).
Subtask 46-41-37-862-051-A ** ON A/C NOT FOR ALL (1) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Close access door 824 (Ref. AMM TASK 52-41-00-410-002).
(4) Remove the access platform(s).
B. Put the aircraft back to its initial configuration.
(1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
Cellular-gatelink subscriber-identity module card