Operational Test of the Cellular Gatelink


TASK 46-41-00-710-812-A
Operational Test of the Cellular Gatelink


ZONE: 120
ZONE: 220
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT)
No specific
AR
LAPTOP - FOR GSM ALNA MAINTENANCE
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
120
AVIONICS COMPARTMENT
220
FWD CAB UTILITY AREAS
824
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 46-41-00-610-811-A
Get access to the ALNA Graphical User Interface (GUI) - Maintenance Access - with Multi-Purpose Flight-Attendant Panel (MP-FAP)
TASK 52-41-00-010-002-A
Open the Avionics Compartment Doors for Access
TASK 52-41-00-410-002-A
Close the Avionics Compartment Doors after Access
TASK 46-41-00-00
CABIN INFORMATION NETWORK SYSTEM - DESCRIPTION AND OPERATION
3. Job Set-up
Subtask 46-41-00-860-089-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
   (2) Access the ALNA Graphical User Interface - Maintenance Access - via Multi-Purpose Flight-Attendant Panel (MP-FAP) (Ref. AMM TASK 46-41-00-610-811).
Subtask 46-41-00-865-171-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) closed:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2000VUCINS-HESU21RFE02
Subtask 46-41-00-860-091-A ** ON A/C NOT FOR ALL
C. Preparation for the Test
   (1) Get access to the Head End Server Unit (HESU) as follows:
     (a) For the location of this component, refer to paragraph Component Location
(Ref. AMM D/O 46-41-00-00).
     (b) Put an ACCESS PLATFORM 2M (6 FT) in position at access door 824.
     (c) Open access door 824 (Ref. AMM TASK 52-41-00-010-002).
   (2) Make sure that the SIM card is installed in HESU as follows:
     (a) Loosen the applicable screw and open the HESU flap.
     (b) Make sure that the SIM card is installed in the SIM card slot.
     (c) Close the HESU flap and hand tighten the applicable screw.
4. Procedure
Subtask 46-41-00-710-064-A ** ON A/C NOT FOR ALL
A. Operational Test of the Cellular Gatelink
NOTE: You can do this procedure at the MP-FAP or on the LAPTOP - FOR GSM ALNA MAINTENANCE. The procedures at the MP-FAP and on the maintenance laptop are the same.
NOTE: The table that follows gives the procedure for the MP-FAP.
ACTION
RESULT
In the cabin, at the MP-FAP:
In the cabin, on the MP-FAP display:
1.Touch the "SYSTEM MONITORING" icon.
  • The "SYSTEM MONITORING" page comes into view.
2.Select the "OVERVIEW" tab.

  • Under the "Connected Systems", make sure that the "Cellular Gatelink" operational state is "Available".

3.Touch the "SYSTEM TEST" icon.
  • The "SYSTEM TEST" page comes into view.
4.Select the "CALIBRATION & FUNCTION TEST" tab.
  • The "CALIBRATION & FUNCTION TEST" tab shows.
  • Touch the "CELLULAR GATELINK TEST" icon.
  • The "CELLULAR GATELINK TEST" icon is marked in blue.
  • Touch the "START TEST" icon.
  • The "CELLULAR GATELINK TEST" page shows.
  • Touch the "ARROW DOWN" icon to start the test.
  • The drop-down menu page shows.
  • Touch the "CELLULAR GATELINK" icon.
  • The "CELLULAR GATELINK TEST" page shows.
  • Touch the "START" icon.
  • The message "TEST IS COMPLETED" shows.
  • Touch the "SHOW RESULTS" icon.
  • A pop-up window with "TEST RESULTS" shows.
  • Make sure that the test result in column "Code" is passed.

5.Touch the "MISCELLANEOUS" icon.
  • The "MISCELLANEOUS" page comes into view.
6.Select the "CELLULAR GATELINK" tab.
  • The "CELLULAR GATELINK" tab comes into view.
  • Make sure that the "Connection Status" shows "Established" with the green icon.
  • Make sure that the "Signal Level" value shows a value between 31 and 95 arbitrary strength units for LTE signal standard and between 10 and 31 arbitrary strength units for the UMTS signal standard.
  • Make sure that for the "Modem Status" value column shows "Ok" with the green icon.
  • Make sure that the "SIM Card Status" value column shows "Enabled".

7.Touch the "CLOSE" icon.
  • The "CALIBRATION & FUNCTION TEST" tab shows.
5. Close-up
Subtask 46-41-00-860-090-A ** ON A/C NOT FOR ALL
A. Put the aircraft back to its initial configuration.
   (1) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
   (2) Make sure that the work area is clean and clear of tools and other items.
   (3) Touch the "LOGOFF" icon.
NOTE: It is not necessary to log off, if you continue with a different test procedure.
   (4) Close access door 824 (Ref. AMM TASK 52-41-00-410-002).
   (5) Remove the access platform(s).
   (6) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).