Parameter loading procedure with the Maintenance Laptop
TASK 46-41-00-610-806-A
Parameter loading procedure with the Maintenance Laptop
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 46-41-00-280-053-A ** ON A/C NOT FOR ALL
Subtask 46-41-00-860-070-AY ** ON A/C NOT FOR ALL
Subtask 46-41-00-862-088-D ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:26:13 UTC
Parameter loading procedure with the Maintenance Laptop
ZONE: 200
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | LAPTOP - FOR GSM ALNA MAINTENANCE |
| Z499H000090E | 1 | CD BOOT-ALNA |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 200 | UPPER HALF FUSELAGE |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 46-41-00-720-817-A | Avionic Data Availability Check |
| TASK 46-41-00-860-801-A | Connection of the Maintenance Laptop to the Cabin Plug |
| TSM 46-41-00-810-813 | Status Monitoring Avionic Data not available |
Subtask 46-41-00-280-053-A ** ON A/C NOT FOR ALL
A. System configuration
The parameter and the installation sequence are given below. For all loading procedures, you have to follow this sequence. An automatic reboot of the Connectivity System can occur.
This parameter is applicable:
Subtask 46-41-00-861-088-C ** ON A/C NOT FOR ALL The parameter and the installation sequence are given below. For all loading procedures, you have to follow this sequence. An automatic reboot of the Connectivity System can occur.
This parameter is applicable:
- FIN 3001RFSW8 SOFTWARE-ALNA, PARAMETER.
This procedure has these steps: - Loading procedure of the parameter to the equipment
- Do a check of the equipment/parameter configuration after the uploading procedure.
B. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Use the ALNAv3 Parameter Z499H000090E CD BOOT-ALNA for the parameter loading.
(3) Connect the Maintenance Laptop to the Cabin Plug (Ref. AMM TASK 46-41-00-860-801).
Subtask 46-41-00-865-095-A ** ON A/C NOT FOR ALL (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Use the ALNAv3 Parameter Z499H000090E CD BOOT-ALNA for the parameter loading.
(3) Connect the Maintenance Laptop to the Cabin Plug (Ref. AMM TASK 46-41-00-860-801).
C. Make sure that this(these) circuit breaker(s) is(are) closed:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2000VU | WAP | 27MH | D07 |
| 2000VU | CINS-HESU | 21RF | E02 |
Subtask 46-41-00-860-070-AY ** ON A/C NOT FOR ALL
A. Aircraft configuration
(2) Make sure that the Avionics Data shows as "Available" (Ref. AMM TASK 46-41-00-720-817).
(3) If the Avionics Data shows as "Not Available", do the related troubleshooting procedure TSM 46-41-00-810-813.
Subtask 46-41-00-610-056-D ** ON A/C NOT FOR ALL NOTE: The aircraft must be on the ground for parameter loading.
(1) Make sure that the correct Z499H000090E CD BOOT-ALNA for the LAPTOP - FOR GSM ALNA MAINTENANCE is available in the CD/DVD-ROM drive of the maintenance laptop. (2) Make sure that the Avionics Data shows as "Available" (Ref. AMM TASK 46-41-00-720-817).
(3) If the Avionics Data shows as "Not Available", do the related troubleshooting procedure TSM 46-41-00-810-813.
B. Parameter loading procedure with the maintenance laptop
5. Close-upNOTE: To do the procedure, a LAPTOP - FOR GSM ALNA MAINTENANCE with these features is necessary:
- An Intel or AMD CPU with a frequency more than 800 MHz with 64bit instruction set capability
- A minimum RAM size of 4 GB
- An internal DVD-ROM drive
- A LAN Adapter Ethernet RJ45 with a minimum transfer rate of 100Mbit/s
- A pointing device (touch pad, track ball and/or mouse)
- A graphic adapter and LCD display with a display size of 1024x768 pixel and 24 bit color resolution
- A BIOS which lets you boot from a CD/DVD-ROM
- The correct Z499H000090E CD BOOT-ALNA for the ALNA system
- USB 3.0 for connection of external USB storages
- HDD/SSD with a storage capacity more than 512 GB (for WCD content loading only)
- eSATAp Connector (5V Power) (for WCD content loading only)
- Rechargeable Battery with capacity more than 35 Wh (Battery Live up to 4h)
NOTE: If you stop the upload procedure before it is completed the system must do a reboot to show the correct part numbers.
NOTE: The complete installation will take approximately 60 minutes.
| ACTION | RESULT |
|---|---|
| At the maintenance laptop: | At the maintenance laptop: |
| 1.Click on the "DATA LOADING" icon. |
|
| 2.Remove the Z499H000090E CD BOOT-ALNA from the maintenance laptop. | |
| 3.Insert the CD/DVD with the load 3001RFSW8 SOFTWARE-ALNA, PARAMETER into the maintenance laptop. | |
| 4.On the upper right corner of the Graphic User Interface (GUI), click on the "Select Device" icon. | |
| 5.Select the CD/DVD media source. | |
| 6.Click the "OK" icon. | |
| 7.Click on the "DATA LOADING" icon to reload the page. |
NOTE: It can take up to 5 minutes to display the 2 packages in the list. |
| 8.Click on the arrow-down icon adjacent to the entry configuration to install. |
|
| 9.Click on the "INSERTED MEDIA" icon. |
|
| 10.Click on the "INSTALL" icon. |
|
| 11.Click the "OK" icon to confirm. |
|
| 12.Click the "OK" icon to confirm. |
|
NOTE: Wait until the reboot is completed. | |
Subtask 46-41-00-862-088-D ** ON A/C NOT FOR ALL
A. Put the aircraft back to its initial configuration
(1) Remove the Z499H000090E CD BOOT-ALNA with the load from the maintenance laptop.
(2) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(3) Shut down the maintenance laptop and disconnect it from the cabin plug.
(5) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(1) Remove the Z499H000090E CD BOOT-ALNA with the load from the maintenance laptop.
(2) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(3) Shut down the maintenance laptop and disconnect it from the cabin plug.
NOTE: It is not necessary to shut down or disconnect the maintenance laptop, if you continue with a different procedure.
(4) Put back the ALNA Boot-CD/DVD in the storage box. (5) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).