W DOC AIRBUS | AMM A320F

Reset of the SATCOM Global Xpress Aviation (GXA) through Power Cycle


TASK 46-41-00-600-810-A
Reset of the SATCOM Global Xpress Aviation (GXA) through Power Cycle


ZONE: 200
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
200
UPPER HALF FUSELAGE
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
3. Job Set-up
Subtask 46-41-00-861-145-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
   (2) Get Access to the JetWave Graphical User Interface (GUI) (Ref. AMM D/O 44-33-00-61).
4. Procedure
Subtask 46-41-00-600-053-A ** ON A/C NOT FOR ALL
A. Reset of the SATCOM Global Xpress Aviation System through Power Cycle
   (1) If the LRUs are energized, de-energize all the LRUs at the same time.
   (2) Wait for 10 seconds.
   (3) Energize all the LRUs at the same time.
5. Close-up
Subtask 46-41-00-862-144-A ** ON A/C NOT FOR ALL
A. Put the aircraft back to its initial configuration.
   (1) Log off from the JetWave GUI.
   (2) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
   (3) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
[Rev.10 from 2021] 2026.04.02 06:26:11 UTC