Installation of the Airbus FOMAX Gatelink-Antenna
TASK 46-26-15-400-801-A
Installation of the Airbus FOMAX Gatelink-Antenna
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 46-26-15-861-051-A ** ON A/C NOT FOR ALL Subtask 46-26-15-865-051-A ** ON A/C NOT FOR ALL
Subtask 46-26-15-420-050-A ** ON A/C NOT FOR ALL
Subtask 46-26-15-410-051-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:26:06 UTC
Installation of the Airbus FOMAX Gatelink-Antenna
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | Torque wrench: range to between 6.1 and 4.1 lbf.in (0.07 and 0.05 m.daN ) ![]() | |
| No specific | Torque wrench: range to between 40.00 and 38.00 lbf.in (0.45 and 0.43 m.daN ) ![]() |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.14QDC1) | Wire-Locking Dia: 0.5 mm (0.020 inch) CRES - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 230 | FWD PASSENGER COMPARTMENT |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 20-28-00-912-802-A | Electrical Bonding - General Maintenance Procedure |
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 25-23-41-000-001-A | Removal of the Ceiling Panels |
| TASK 25-23-41-400-001-A | Installation of the Ceiling Panels |
| TASK 46-26-32-860-801-A | Connection of the Maintenance Electronic Device (with the Local Maintenance Function (LMF)) to the Flight Operations and MAintenance eXchanger (FOMAX) |
| TASK 46-26-32-860-806-A | Disconnection of the Maintenance Electronic Device (with the Local Maintenance Function (LMF)) from the Flight Operations and MAintenance eXchanger (FOMAX) |
Subtask 46-26-15-861-051-A ** ON A/C NOT FOR ALL Subtask 46-26-15-865-051-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 46-26-15-010-053-A ** ON A/C NOT FOR ALL 4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | FOMAX | 67TA | J01 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | FOMAX | 67TA | R12 |
Subtask 46-26-15-420-050-A ** ON A/C NOT FOR ALL
A. Install the Airbus Flight Operations and MAintenance eXchanger (FOMAX) gatelink-antenna:
(1) Make sure that the parts retained from the removed component are clean and in the correct condition.
(2) Clean the component interfaces and the adjacent area.
(3) Do an inspection of the component interfaces and the adjacent area.
(4) Put and hold the Airbus FOMAX gatelink-antenna (3) in position on the bracket (4).
(5) Make sure that you can see the label on the Airbus FOMAX gatelink-antenna (3).
(6) Attach the Airbus FOMAX gatelink-antenna (3) with the four screws (2).
(7) Prepare for the electrical bonding (Ref. AMM TASK 20-28-00-912-802).
.
(9) Make sure that the bonding contact resistance between the Airbus FOMAX gatelink-antenna (3) and the fuselage structure is not more than five milliohms (Ref. AMM TASK 20-28-00-912-802).
(10) Remove the CAP-BLANKING from each electrical connector and receptacle.
(11) Connect the electrical connector (1) to the electrical connector (5).
(a) TORQUE the electrical connector (1) to between 6.1 and 4.1 lbf.in (0.07 and 0.05 m.daN )
.
(12) Installation of the lockwire.
14QDC1 Wire-Locking Dia: 0.5 mm (0.020 inch) CRES - .
Subtask 46-26-15-710-051-A ** ON A/C NOT FOR ALL (1) Make sure that the parts retained from the removed component are clean and in the correct condition.
(2) Clean the component interfaces and the adjacent area.
(3) Do an inspection of the component interfaces and the adjacent area.
(4) Put and hold the Airbus FOMAX gatelink-antenna (3) in position on the bracket (4).
(5) Make sure that you can see the label on the Airbus FOMAX gatelink-antenna (3).
(6) Attach the Airbus FOMAX gatelink-antenna (3) with the four screws (2).
(7) Prepare for the electrical bonding (Ref. AMM TASK 20-28-00-912-802).
NOTE: The antenna mounting screws (2) give the electrical bonding between the Airbus FOMAX gatelink-antenna (3) and the bracket (4).
(8) TORQUE the screws (2) to between 40.00 and 38.00 lbf.in (0.45 and 0.43 m.daN )
. (9) Make sure that the bonding contact resistance between the Airbus FOMAX gatelink-antenna (3) and the fuselage structure is not more than five milliohms (Ref. AMM TASK 20-28-00-912-802).
(10) Remove the CAP-BLANKING from each electrical connector and receptacle.
(11) Connect the electrical connector (1) to the electrical connector (5).
(a) TORQUE the electrical connector (1) to between 6.1 and 4.1 lbf.in (0.07 and 0.05 m.daN )
. (12) Installation of the lockwire.
WARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
(a) Safety the electrical connector (1) to the bracket (4) with the B. Test(s)
(1) Connect the Maintenance Electronic Device (with the LMF installed) to the FOMAX (Ref. AMM TASK 46-26-32-860-801).
(2) On the LMF main page, click the "AB Cell Gatelink" button (the "AB Cellular Gatelink" main page comes into view).
(3) On the LMF main page, make sure that the LED adjacent to the "AB Cell Gatelink" button is green.
(4) Disconnect the Maintenance Electronic Device (with the LMF installed) from the FOMAX (Ref. AMM TASK 46-26-32-860-806).
5. Close-up(1) Connect the Maintenance Electronic Device (with the LMF installed) to the FOMAX (Ref. AMM TASK 46-26-32-860-801).
(2) On the LMF main page, click the "AB Cell Gatelink" button (the "AB Cellular Gatelink" main page comes into view).
(3) On the LMF main page, make sure that the LED adjacent to the "AB Cell Gatelink" button is green.
(4) Disconnect the Maintenance Electronic Device (with the LMF installed) from the FOMAX (Ref. AMM TASK 46-26-32-860-806).
Subtask 46-26-15-410-051-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install ceiling panel 231CC (Ref. AMM TASK 25-23-41-400-001).
Subtask 46-26-15-865-052-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install ceiling panel 231CC (Ref. AMM TASK 25-23-41-400-001).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 46-26-15-862-050-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | FOMAX | 67TA | J01 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | FOMAX | 67TA | R12 |
Airbus FOMAX Gatelink-Antenna