1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
211
COCKPIT
212
COCKPIT
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 46-21-00-740-001-A
BITE Test of the ATIMS
3. Job Set-up
Subtask 46-21-21-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
Subtask 46-21-21-865-051-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
122VULIGHTING/INSTL LT/GLARE/SHLD5LFY05
** ON A/C NOT FOR ALL
FOR FIN: 2TX1 (DCDU1)
121VUDCDU 16TX1L17
** ON A/C NOT FOR ALL
121VUDCDU 16TX1K44
** ON A/C NOT FOR ALL
FOR FIN: 2TX2 (DCDU2)
121VUDCDU 26TX2L18
** ON A/C NOT FOR ALL
121VUDCDU 26TX2K45
4. Procedure
Subtask 46-21-21-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the DCDU
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Remove the blanking cap from the electrical connector (4).
   (4) Make sure that the electrical connector is clean and in the correct condition.
   (5) Connect the electrical connector (4).
   (6) Install the DCDU (3) in its housing.
   (7) Install and tighten the four screws (1) and washers (2).
Subtask 46-21-21-865-052-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
122VULIGHTING/INSTL LT/GLARE/SHLD5LFY05
** ON A/C NOT FOR ALL
FOR FIN: 2TX1 (DCDU1)
121VUDCDU 16TX1L17
** ON A/C NOT FOR ALL
121VUDCDU 16TX1K44
** ON A/C NOT FOR ALL
FOR FIN: 2TX2 (DCDU2)
121VUDCDU 26TX2L18
** ON A/C NOT FOR ALL
121VUDCDU 26TX2K45
Subtask 46-21-21-740-050-A ** ON A/C NOT FOR ALL
C. Do the BITE test of the ATIMS (Ref. AMM TASK 46-21-00-740-001).
5. Close-up
Subtask 46-21-21-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
Subtask 46-21-21-862-050-A ** ON A/C NOT FOR ALL
B. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).