1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
210
CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 31-60-00-860-001-A
EIS Start Procedure
TASK 31-60-00-860-002-A
EIS Stop Procedure
F MCDU Access to COMM MENU Page ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 46-21-00-861-084-C ** ON A/C NOT FOR ALL
A. Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
Subtask 46-21-00-865-075-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) closed:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUAUTO FLT/MCDU/111CA1B01
49VUSDAC/1/SPLY3WVF04
49VUFWS/FWC1/SPLY3WWF01
121VUCFDS/CFDIU/SPLY2TWJ18
121VUATSU 13TX1L16
121VUATSU 1/SWTG5TX1L15
121VUEIS/FWC2/SPLY2WWQ07
Subtask 46-21-00-860-095-C ** ON A/C NOT FOR ALL
C. Aircraft Maintenance Configuration
   (1) Do the EIS start procedure (upper and lower ECAM DUs only) (Ref. AMM TASK 31-60-00-860-001).
   (2) On the center pedestal, on MCDU 1, adjust the brightness of the MCDU screen.
4. Procedure
Subtask 46-21-00-710-057-C ** ON A/C NOT FOR ALL
A. SATCOM Link Test of the ATSU
ACTION
RESULT
1.On MCDU1:
  • Push the MCDU MENU mode key
On MCDU1:
2.On the MCDU MENU page:
  • Push the line key adjacent to the ATSU indication.
On the MCDU 1:
  • The ATSU DATALINK page comes into view.
3.On the ATSU DATALINK page:
  • Push the line key adjacent to the COMM indication.
On MCDU1:
  • The COMM MENU page comes into view.
4.On the COMM MENU page:
On MCDU1:
  • the MAINTENANCE page comes into view.
5.On the MAINTENANCE page:
  • Push the line key adjacent to the TEST indication.
On MCDU1:
  • The TEST page comes into view.
6.On the TEST page:
  • Push the line key adjacent to the REQUEST/SAT LINK indication.
On the TEST page:
  • The REQUEST indication goes out of view
  • The IN PROGRESS indication comes into view
  • At the end of the test, the OK indication comes into view.
7.On MCDU1:
  • Push the line key adjacent to the RETURN indication until the ATSU DATALINK page comes into view.

8.On MCDU1:
  • Push the MCDU MENU key.
On the MCDU1:
  • The MCDU MENU page comes into view.
5. Close-up
Subtask 46-21-00-860-096-C ** ON A/C NOT FOR ALL
A. Put the aircraft back to its initial configuration.
   (1) On MCDU1, fully decrease the brightness of the MCDU screen (display off).
   (2) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
Subtask 46-21-00-862-069-C ** ON A/C NOT FOR ALL
B. De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).