Uploading of the ATSU Software with the PDL (SFIM or equivalent)
TASK 46-21-00-610-001-A
Uploading of the ATSU Software with the PDL (SFIM or equivalent)
To upload the software with the PDL.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 46-21-00-861-054-A ** ON A/C NOT FOR ALL Subtask 46-21-00-865-055-A ** ON A/C NOT FOR ALL
Subtask 46-21-00-970-108-A ** ON A/C NOT FOR ALL
(a) If it is not necessary to upload these software components, go directly to the next Para.
(2) Upload the applicable ATSU software component(s) that follow in this sequence:
1 On the PDL, set the ON/OFF switch to OFF.
2 Disconnect the PDL.
3 Connect the PDL again.
(3) Do the procedure given in the table that follows:
Subtask 46-21-00-970-062-A ** ON A/C NOT FOR ALL
Subtask 46-21-00-860-061-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:26:03 UTC
Uploading of the ATSU Software with the PDL (SFIM or equivalent)
CAUTION:
YOU MUST DO THE UPLOADING OF THE AOC APPLICATION SOFTWARE AND ASSOCIATED DATABASE AFTER UPLOADING OF THE ATSU A/C INTERFACE SOFTWARE. UPLOADING OF THE ATSU A/C INTERFACE SOFTWARE ERASES THE AOC APPLICATION SOFTWARE AND ASSOCIATED DATABASE.
CAUTION:
DO THE UPLOADING OF THE AOC SOFTWARE (22TX) BEFORE YOU DO THE UPLOADING OF THE AOC DATABASE SOFTWARE (24TX).
1. Reason for the JobTo upload the software with the PDL.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| YV68A110 | 1 | PORTABLE DATA LOADER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 120 | AVIONICS COMPARTMENT |
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| 824 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-32-00-860-013-A | Procedure to Get Access to the SYSTEM REPORT/TEST/INFO SYS Page |
| TASK 46-21-00-860-001-A | Initialization Procedure of the ATSU Router |
| TASK 52-41-00-010-002-A | Open the Avionics Compartment Doors for Access |
| TASK 52-41-00-410-002-A | Close the Avionics Compartment Doors after Access |
Subtask 46-21-00-861-054-A ** ON A/C NOT FOR ALL Subtask 46-21-00-865-055-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 46-21-00-860-062-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AUTO FLT/MCDU/1 | 11CA1 | B01 |
| 49VU | L/G/LGCIU/SYS1/NORM | 1GA | C09 |
| 49VU | FWS/FWC1/SPLY | 3WW | F01 |
| 49VU | COM/RMP/1 | 2RG1 | G10 |
| 121VU | CFDS/CFDIU/SPLY | 2TW | J18 |
| 121VU | DATA/LOADER/SPLY | 3TD | J16 |
| 121VU | ATSU 1 | 3TX1 | L16 |
| 121VU | ATSU 1/SWTG | 5TX1 | L15 |
| 121VU | COM NAV/VHF/3 | 2RC3 | L05 |
| 121VU | COM NAV/RMP/2 | 2RG2 | L02 |
| 121VU | AUTO FLT/MCDU/2 | 11CA2 | N20 |
| 121VU | HYDRAULIC/LGCIU/SYS2 | 2GA | Q35 |
| 121VU | EIS/FWC2/SPLY | 2WW | Q07 |
C. Aircraft Maintenance Configuration
(1) Make sure that the aircraft is in the ground configuration.
Subtask 46-21-00-010-052-A ** ON A/C NOT FOR ALL (1) Make sure that the aircraft is in the ground configuration.
D. Get access to the avionics compartment.
(1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at zone 128.
(2) Open access door 824 (Ref. AMM TASK 52-41-00-010-002).
Subtask 46-21-00-480-050-A ** ON A/C NOT FOR ALL (1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at zone 128.
(2) Open access door 824 (Ref. AMM TASK 52-41-00-010-002).
E. Installation of the YV68A110 PORTABLE DATA LOADER in the Avionics Compartment.
(1) Put the Portable Data loader (PDL) in position near the bottom right corner of electronics rack 80VU (zone 127), when you look aft.
(2) On the PDL, set the ON/OFF switch to ON.
(3) Upload the applicable software to the PDL.
(4) On the PDL, set the ON/OFF switch to OFF.
(5) Remove the blanking cap from ATSU DATA LOADER connector 183VC on the bottom right corner of the electronics rack 80VU, when you look aft.
(6) Connect the PDL cable to ATSU DATA LOADER connector 183VC.
Subtask 46-21-00-280-074-A ** ON A/C NOT FOR ALL (1) Put the Portable Data loader (PDL) in position near the bottom right corner of electronics rack 80VU (zone 127), when you look aft.
(2) On the PDL, set the ON/OFF switch to ON.
(3) Upload the applicable software to the PDL.
(4) On the PDL, set the ON/OFF switch to OFF.
(5) Remove the blanking cap from ATSU DATA LOADER connector 183VC on the bottom right corner of the electronics rack 80VU, when you look aft.
(6) Connect the PDL cable to ATSU DATA LOADER connector 183VC.
F. Refer to the Logic Diagram Before the Upload of the ATSU A/C INTERFACE Software (Part A)
Logic Diagram to Upload the ATSU Software ** ON A/C NOT FOR ALL
Logic Diagram to Upload the ATSU Software ** ON A/C NOT FOR ALL
.
Subtask 46-21-00-280-150-A ** ON A/C NOT FOR ALL
Logic Diagram to Upload the ATSU Software ** ON A/C NOT FOR ALL
Logic Diagram to Upload the ATSU Software ** ON A/C NOT FOR ALL G. Check the References of the Software Components Pre-Loaded in the ATSU on the MCDU
(a) If the access to the LRU IDENTIFICATION page is not possible, or if no software component is uploaded to the Air Traffic Service Unit (ATSU):
1 Upload the ATSU software components in Para 4.
(b) If the access to the LRU IDENTIFICATION page is possible:
1 Do a check of the references of the software components pre-loaded in the ATSU, as follows:
(2) Print the LRU IDENTIFICATION pages.
(3) If you have the media for software component(s) 22TX and/or 24TX, do a check of the installed AOC software components as follows:
(a) For the Honeywell AOC software component, do the procedure in the table that follows:
(b) For the Rockwell AOC software component, do the procedure in the table that follows:
(4) If you must upload software component 20TX or 30TX,
(a) Get access to the COMM CONFIG page.
1 On the MCDU MENU:
a Select ATSU.
b Select COMM MENU.
c Select COMM CONFIG.
(b) Print the COMM CONFIG page.
(c) Get access to the VHF3 SCAN SELECT page.
1 On the MCDU:
a Select VHF3 SCAN SELECT.
(d) Print the VHF3 SCAN SELECT pages before you upload the ATSU software.
(5) If all the references on the media are the same as the references on the MCDU, go to Para. 5. Close Up.
(6) If a minimum of one reference on the media is different from the references on the MCDU, go to Para. 4.A Preparation of the ATSU Software Components Upload.
4. ProcedureNOTE: This software-component reference check compares the part number (PN) on the LRU IDENTIFICATION page and the AOC MENU page of the Multipurpose Control & Display Unit (MCDU) with the PN on the software media. The PN on the PDL and the PN on the software media or on the LRU IDENTIFICATION and AOC MENU page can be different.
(1) Do the procedure to get access to the SYSTEM REPORT/TEST/INFO SYS page (Ref. AMM TASK 31-32-00-860-013): (a) If the access to the LRU IDENTIFICATION page is not possible, or if no software component is uploaded to the Air Traffic Service Unit (ATSU):
1 Upload the ATSU software components in Para 4.
(b) If the access to the LRU IDENTIFICATION page is possible:
1 Do a check of the references of the software components pre-loaded in the ATSU, as follows:
| ACTION | RESULT |
|---|---|
1.On the MCDU:
| On the MCDU:
|
2.On the ATIMS page:
| On the MCDU:
|
3.For the list of software components that follows, make sure that the references on the software media are different from the references on the LRU IDENTIFICATION page:
| |
(3) If you have the media for software component(s) 22TX and/or 24TX, do a check of the installed AOC software components as follows:
(a) For the Honeywell AOC software component, do the procedure in the table that follows:
| ACTION | RESULT |
|---|---|
1.On the MCDU:
| On the MCDU:
|
2.On the MCDU MENU page:
| On the MCDU:
|
3.On the ATSU DATALINK page:
| On the MCDU:
|
4.On the AOC MENU page:
| On the MCDU:
|
5.On the AOC MISCELLANEOUS page:
| On the MCDU:
|
6.For the list of software components that follows, make sure that the references on the software media are different from the references on the AOC CONFIGURATION page:
| |
| ACTION | RESULT |
1.On the MCDU:
| On the MCDU:
|
2.On the MCDU MENU page:
| On the MCDU:
|
3.On the ATSU DATALINK page:
| On the MCDU:
|
4.On the AOC MENU page:
| On the MCDU:
|
5.On the MISC MENU page:
| On the MCDU:
|
6.For the list of software components that follows, make sure that the references on the software media are different from the references on the SYSTEM CONFIG page:
| |
(a) Get access to the COMM CONFIG page.
1 On the MCDU MENU:
a Select ATSU.
b Select COMM MENU.
c Select COMM CONFIG.
(b) Print the COMM CONFIG page.
(c) Get access to the VHF3 SCAN SELECT page.
1 On the MCDU:
a Select VHF3 SCAN SELECT.
(d) Print the VHF3 SCAN SELECT pages before you upload the ATSU software.
(5) If all the references on the media are the same as the references on the MCDU, go to Para. 5. Close Up.
(6) If a minimum of one reference on the media is different from the references on the MCDU, go to Para. 4.A Preparation of the ATSU Software Components Upload.
CAUTION:
YOU MUST DO A CHECK OF THE INTEGRITY OF THE MEDIA USED FOR THE SOFTWARE UPLOADING. MAKE SURE THAT YOU CORRECTLY COPIED THE DIRECTORY WITH ALL THE HIDDEN FILES AND FOLDERS. IF YOU DO NOT OBEY THIS PRECAUTION, THERE IS A RISK OF FAILURE OF THE SOFTWARE UPLOADING.
Subtask 46-21-00-860-176-A ** ON A/C NOT FOR ALL A. Preparation of the ATSU Software Components Upload
(1) The ATSU include several Software (S/W) components. Their upload must be done in the following order:
Subtask 46-21-00-970-050-A ** ON A/C NOT FOR ALL (1) The ATSU include several Software (S/W) components. Their upload must be done in the following order:
- S/W ATSU A/C INTERFACE software component (20TX)
- S/W ATSU CONFIGURATION software component (21TX)
- S/W ATSU ROUTER PARAM software component (30TX).
And if installed: - S/W ATSU ATC UTILITIES software component (25TX)
- S/W ATSU FANS A APPLICATIONS software component (35TX)
- S/W ATSU ATC FANS B APPLICATIONS software component (36TX)
- S/W ATSU ATC FANS APPLICATIONS (39TX)
- S/W ATSU CMA CONFIGURATION software component (37TX)
- S/W ATSU ATC ARINC 623 APPLICATIONS software component (23TX)
- S/W AOC software component (22TX)
- S/W AOC DATABASE software component (24TX)
- S/W ATSU ISM APPLICATION software component (31TX)
- S/W ATSU BRAKING ACTION COMPUTATION software component (42TX).
B. Upload of the ATSU Software Components (20TX, 21TX and 30TX)
(b) Between each software upload procedure:
1 On the PDL, set the ON/OFF switch to OFF.
2 Disconnect the PDL.
3 Connect the PDL again.
1 If the P/Ns of the software 20TX and 30TX are not compatible:
a It is necessary to upload the ATSU software 20TX and 21TX again.
(2) Do the procedure in the table that follows:
Subtask 46-21-00-970-050-E ** ON A/C NOT FOR ALL CAUTION:
DURING THE UPLOADING OF THE SOFTWARE COMPONENT(S) TO THE ATSU MAKE SURE THAT:
(1) You must upload all the software components that follow in this sequence and one after the other:- MAINTENANCE PERSONNEL DO NOT CHANGE THE SOURCE OF THE AIRCRAFT POWER SUPPLY (GROUND POWER UNIT, APU, ETC.)
- MAINTENANCE PERSONNEL DO NOT TOUCH OR MOVE THE DATA LOADER SELECTOR(S).
- First, the ATSU A/C INTERFACE software component (20TX)
- Then, the ATSU CONFIGURATION software component (21TX) and ATSU ROUTER PARAMETERS software component (30TX).
(b) Between each software upload procedure:
1 On the PDL, set the ON/OFF switch to OFF.
2 Disconnect the PDL.
3 Connect the PDL again.
NOTE: The loading time for a full disk changes in relation to the software, the maximum loading time is 40 minutes.
(c) When you upload the software 30TX:1 If the P/Ns of the software 20TX and 30TX are not compatible:
a It is necessary to upload the ATSU software 20TX and 21TX again.
(2) Do the procedure in the table that follows:
| ACTION | RESULT |
|---|---|
1.In the avionics compartment, on the PDL:
| On the PDL:
|
2.On the PDL:
| On the PDL:
NOTE: If more than one disk is necessary to do the upload, the EJECT DISK and INSERT NEXT DISK indications come into view one after the other. They tell the operator to put a new disk into the PDL. NOTE: If more than one disk is necessary to do the upload and if a transfer fault occurs, the upload must start from disk 1. |
3.If a transfer fault occurs, wait for a minimum of three minutes:
| |
| | On the upper ECAM DU:
|
| | On the MCDU MENU page:
|
| | On the PDL:
|
4.On the PDL:
| |
In the avionics compartment:
| |
| | On the upper ECAM DU:
NOTE: When the PDL is disconnected, the ATSU does a power-on self-test. The COM ACARS FAULT or DATALINK ATSU FAULT warning goes out of view at the end of this test. |
| | On the MCDU MENU page:
NOTE: If the ATSU router is not initialized, the ACARS STBY memo or the DATALINK ATSU FAULT + ATSU INIT FAULT warning comes into view on the upper ECAM DU. |
CAUTION:
DURING THE UPLOADING OF THE SOFTWARE COMPONENT(S) TO THE ATSU MAKE SURE THAT:
B. Upload of the ATSU Software Component (20TX) - MAINTENANCE PERSONNEL DO NOT CHANGE THE SOURCE OF THE AIRCRAFT POWER SUPPLY (GROUND POWER UNIT, APU, ETC.)
- MAINTENANCE PERSONNEL DO NOT TOUCH OR MOVE THE DATA LOADER SELECTOR(S).
NOTE: The loading time for a full disk changes in relation to the software. The maximum loading time is 40 minutes.
(1) Do the procedure in the table that follows:| ACTION | RESULT |
|---|---|
| On the PDL, set the ON/OFF switch to OFF 1.In the avionics compartment, on the PDL:
| On the PDL:
|
2.On the PDL:
| On the PDL:
NOTE: If more than one disk is necessary to do the upload, the EJECT DISK and INSERT NEXT DISK indications come into view one after the other. They tell the operator to put a new disk into the PDL. NOTE: If more than one disk is necessary to do the upload and if a transfer fault occurs, the upload must start from disk 1. |
3.If a transfer fault occurs, wait for a minimum of three minutes:
| |
| | On the upper ECAM DU:
|
| | On the MCDU MENU page:
|
| | On the PDL:
|
4.On the PDL:
| |
In the avionics compartment:
| |
| | On the upper ECAM DU:
NOTE: When the PDL is disconnected, the ATSU does a power-on self-test. The COM ACARS FAULT warning goes out of view at the end of this test. |
| | On the MCDU MENU page:
NOTE: If the ATSU router is not initialized, the ACARS STBY memo comes into view on the upper ECAM DU. |
CAUTION:
DURING THE UPLOADING OF THE SOFTWARE COMPONENT(S) TO THE ATSU MAKE SURE THAT:
C. Uploading of the ATSU ATC Applications.- MAINTENANCE PERSONNEL DO NOT CHANGE THE SOURCE OF THE AIRCRAFT POWER SUPPLY (GROUND POWER UNIT, APU, ETC.)
- MAINTENANCE PERSONNEL DO NOT TOUCH OR MOVE THE DATA LOADER SELECTOR(S).
NOTE: If an uploading is in progress, the DATALINK ATSU FAULT comes into view on the upper ECAM DU.
(1) Do the steps that follow only when you must upload software components 25TX, 35TX, 36TX, 39TX, 37TX or/and 23TX.(a) If it is not necessary to upload these software components, go directly to the next Para.
(2) Upload the applicable ATSU software component(s) that follow in this sequence:
- ATC HMI UTILITIES software (25TX)
- ATSU ATC FANSA APPLICATIONS software (35TX)
- ATSU ATC FANSB APPLICATIONS software (36TX)
- ATSU ATC FANSC APPLICATIONS software (39TX)
- ATSU CMA CONFIGURATION software (37TX)
- ATSU ATC ARINC 623 APPLICATIONS software (23TX).
NOTE: The loading time for a full set of disks is approximately twelve minutes.
(a) Between each software uploading procedure:1 On the PDL, set the ON/OFF switch to OFF.
2 Disconnect the PDL.
3 Connect the PDL again.
(3) Do the procedure given in the table that follows:
| ACTION | RESULT |
|---|---|
1.In the avionics compartment, on the PDL:
| On the PDL:
|
2.On the PDL:
| On the PDL:
NOTE: If more than one disk is necessary to do the uploading, the EJECT DISK and INSERT NEXT DISK indications come into view one after the other. They tell the operator to put a new disk into the PDL. NOTE: If more than one disk is necessary to do the uploading and if a transfer fault occurs, the uploading must start from disk 1. |
3.If a transfer fault occurs, wait for a minimum of three minutes:
| |
| | On the upper ECAM DU:
|
| | On the MCDU MENU page:
|
| | On the PDL:
|
4.On the PDL:
| |
| | In the avionics compartment:
|
| | On the upper ECAM DU:
NOTE: When the PDL is disconnected, the ATSU does a power-on self-test. The COM ACARS FAULT warning goes out of view at the end of this test. |
| | On the MCDU MENU page:
NOTE: If the initialization of the ATSU router does not occur, the ACARS STBY memo or the DATALINK ATSU FAULT + ATSU INIT FAULT warning comes into view on the upper ECAM DU. |
D. Upload of the ATSU AOC Applications
1 On the PDL, set the ON/OFF switch to OFF.
2 Disconnect the PDL.
3 Connect the PDL again.
(b) During the upload of the software component (24TX) customized:
1 If you disconnect the PDL before the TRANSF COMPLETE or TRANSF FAILED indication comes into view:
a You must upload again all the software in the ATSU (this is not applicable to FIN 20TX).
(c) If software components 22TX and 24TX were uploaded before and if it is necessary to upload:
Subtask 46-21-00-280-151-A ** ON A/C NOT FOR ALL CAUTION:
DURING THE UPLOADING OF THE SOFTWARE COMPONENT(S) TO THE ATSU MAKE SURE THAT:
(1) You must upload all the software components that follow in this sequence and one after the other: - MAINTENANCE PERSONNEL DO NOT CHANGE THE SOURCE OF THE AIRCRAFT POWER SUPPLY (GROUND POWER UNIT, APU, ETC.)
- MAINTENANCE PERSONNEL DO NOT TOUCH OR MOVE THE DATA LOADER SELECTOR(S).
- AOC SOFTWARE software component (22TX)
- Then, the AOC DATABASE software component (24TX).
NOTE: The loading time for a full disk is 40 minutes maximum.
(a) Between each software upload procedure: 1 On the PDL, set the ON/OFF switch to OFF.
2 Disconnect the PDL.
3 Connect the PDL again.
(b) During the upload of the software component (24TX) customized:
1 If you disconnect the PDL before the TRANSF COMPLETE or TRANSF FAILED indication comes into view:
a You must upload again all the software in the ATSU (this is not applicable to FIN 20TX).
(c) If software components 22TX and 24TX were uploaded before and if it is necessary to upload:
- First, ATSU A/C INTERFACE software component (20TX)
- Then, all the next ATSU software components.
| ACTION | RESULT |
|---|---|
1.In the avionics compartment, on the PDL:
| On the PDL:
|
2.On the PDL:
| On the PDL:
NOTE: If more than one disk is necessary to do the upload, the EJECT DISK and INSERT NEXT DISK indications come into view one after the other. They tell the operator to put a new disk into the PDL. NOTE: If more than one disk is necessary to do the upload and if a transfer fault occurs, the upload must be start from disk 1. |
3.If a transfer fault occurs, wait for a minimum of three minutes:
| |
| | On the upper ECAM DU:
|
| | On the MCDU MENU page:
|
| | On the PDL:
|
4.On the PDL:
| |
5.In the avionics compartment:
| |
| | On the upper ECAM DU:
NOTE: When the PDL is disconnected, the ATSU does a power-on self-test. The COM ACARS FAULT or DATALINK ATSU FAULT warning goes out of view at the end of this test. |
| | On the MCDU MENU page:
NOTE: If the ATSU router is not initialized, the ACARS STBY memo or the DATALINK ATSU FAULT + ATSU INIT FAULT warning comes into view on the upper ECAM DU. |
E. Check the Reference(s) of the Software Components Uploaded to the ATSU
(1) Do the procedure to get access to the SYSTEM REPORT/TEST/INFO SYS page (Ref. AMM TASK 31-32-00-860-013).
(2) Do a check of the references of the software components in the ATSU, as follows:
(3) If you uploaded software component(s) 22TX and/or 24TX, do a check of the reference of the installed AOC software:
(a) For the Honeywell AOC software components, do the procedure in the table that follows:
(b) For the Rockwell AOC software component, do the procedure in the table that follows:
Subtask 46-21-00-280-152-A ** ON A/C NOT FOR ALL (1) Do the procedure to get access to the SYSTEM REPORT/TEST/INFO SYS page (Ref. AMM TASK 31-32-00-860-013).
(2) Do a check of the references of the software components in the ATSU, as follows:
| ACTION | RESULT |
|---|---|
1.On the MCDU:
| On the MCDU:
|
2.On the ATIMS page:
| On the MCDU:
|
3.On the LRU IDENTIFICATION page:
| |
(a) For the Honeywell AOC software components, do the procedure in the table that follows:
| ACTION | RESULT |
|---|---|
1.On the MCDU:
| On the MCDU:
|
2.On the MCDU MENU page:
| On the MCDU:
|
3.On the ATSU DATALINK page:
| On the MCDU:
|
4.On the AOC MENU page:
| On the MCDU:
|
5.On the AOC MISCELLANEOUS page:
| On the MCDU:
|
| 6.On the AOC CONFIGURATION page : Make sure that the references below the software indications are the same as the references on the related media. The references on the MCDU will be in the list that follows:
| |
| ACTION | RESULT |
1.On the MCDU:
| On the MCDU:
|
2.On the MCDU MENU page:
| On the MCDU:
|
3.On the ATSU DATALINK page:
| On the MCDU:
|
4.On the AOC MENU page:
| On the MCDU:
|
5.On the MISC MENU page:
| On the MCDU:
|
| 6.On the SYSTEM CONFIG page: Make sure that the references below the software indications are the same as the references on the related media. The references on MCDU will be in the list that follows:
| |
F. Do the Initialization Procedure of the ATSU Router
(1) If you uploaded a S/W ATSU A/C INTERFACE software component (20TX), do the initialization of the ATSU router (Ref. AMM TASK 46-21-00-860-001).
5. Close-up(1) If you uploaded a S/W ATSU A/C INTERFACE software component (20TX), do the initialization of the ATSU router (Ref. AMM TASK 46-21-00-860-001).
Subtask 46-21-00-860-061-A ** ON A/C NOT FOR ALL
A. Put the Aircraft back to its Initial Configuration
(1) On the MCDU, push the line select key adjacent to the RETURN indication until the CFDS menu page comes into view.
(2) On the MCDU, fully decrease the brightness of the MCDU screen (display off).
(3) Put the disk(s) in the disk storage box.
Subtask 46-21-00-410-052-A ** ON A/C NOT FOR ALL (1) On the MCDU, push the line select key adjacent to the RETURN indication until the CFDS menu page comes into view.
(2) On the MCDU, fully decrease the brightness of the MCDU screen (display off).
(3) Put the disk(s) in the disk storage box.
B. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close access door 824 (Ref. AMM TASK 52-41-00-410-002).
(3) Remove the access platform(s).
Subtask 46-21-00-862-053-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close access door 824 (Ref. AMM TASK 52-41-00-410-002).
(3) Remove the access platform(s).