Removal of the Depressurization Valve
TASK 38-42-44-000-001-A
Removal of the Depressurization Valve
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 38-42-44-861-050-A ** ON A/C NOT FOR ALL Subtask 38-42-44-010-050-A ** ON A/C NOT FOR ALL
Subtask 38-42-44-020-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 07:19:44 UTC
Removal of the Depressurization Valve
FIN: 4MD ** ON A/C NOT FOR ALL
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 1M(3 FT) |
| No specific | AR | CAP - BLANKING |
| No specific | AR | PLUG - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 161DW | |
| 131PW |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 25-55-12-000-001-A | Removal of the Aft Cargo-Compartment Partition at FR65 |
| TASK 38-10-00-614-002-A | Depressurization of the Potable Water System |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
Subtask 38-42-44-861-050-A ** ON A/C NOT FOR ALL Subtask 38-42-44-010-050-A ** ON A/C NOT FOR ALL
B. Get Access
(1) Put the ACCESS PLATFORM 1M(3 FT) in position at the FWD cargo-compartment door.
(2) Open the FWD cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
(3) Remove the access panel 131PW.
Subtask 38-42-44-010-050-C ** ON A/C NOT FOR ALL (1) Put the ACCESS PLATFORM 1M(3 FT) in position at the FWD cargo-compartment door.
(2) Open the FWD cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
(3) Remove the access panel 131PW.
B. Get Access
(1) Put the ACCESS PLATFORM 1M(3 FT) in position at the AFT cargo-compartment door.
(2) Open the AFT cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
(3) Remove access panel 161DW (Ref. AMM TASK 25-55-12-000-001).
Subtask 38-42-44-614-050-A ** ON A/C NOT FOR ALL Subtask 38-42-44-865-056-A ** ON A/C NOT FOR ALL (1) Put the ACCESS PLATFORM 1M(3 FT) in position at the AFT cargo-compartment door.
(2) Open the AFT cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
(3) Remove access panel 161DW (Ref. AMM TASK 25-55-12-000-001).
D. Open, safety and tag this(these) circuit breaker(s):
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2000VU | WATER SYSTEM-DEPRESS | 1MD | B02 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | WATER-SYSTEM-DEPRESS | 1MD | F03 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | WATER SYS-AIR-COMPRESSOR | 19MD | F01 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | WATER-SYSTEM-DEPRESS | 1MD | D05 |
Subtask 38-42-44-020-050-A ** ON A/C NOT FOR ALL
A. Removal of the Depressurization Valve 4MD
(1) Disconnect the connection (5).
(2) Disconnect the electrical connector 4MD-A (6).
(3) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(4) Remove the nuts (1), the washers (2), the bolts (3) and the depressurization valve (4).
(5) Put the PLUG-BLANKING in each disconnected line end.
Subtask 38-42-44-020-050-C ** ON A/C NOT FOR ALL (1) Disconnect the connection (5).
(2) Disconnect the electrical connector 4MD-A (6).
(3) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(4) Remove the nuts (1), the washers (2), the bolts (3) and the depressurization valve (4).
(5) Put the PLUG-BLANKING in each disconnected line end.
A. Removal of the Depressurization Valve 4MD
(1) Disconnect the connection (6).
(2) Disconnect the electrical connector 4MD-A (1).
(3) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(4) Remove the nuts (5), the washers (4), the bolts (3) and the depressurization valve (2).
(5) Put the PLUG-BLANKING in each disconnected line end.
(1) Disconnect the connection (6).
(2) Disconnect the electrical connector 4MD-A (1).
(3) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(4) Remove the nuts (5), the washers (4), the bolts (3) and the depressurization valve (2).
(5) Put the PLUG-BLANKING in each disconnected line end.
Depressurization Valve 4MD