Installation of the Air Filter
TASK 38-42-42-400-001-A
Installation of the Air Filter
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Expendable Parts
D. Referenced Information
3. Job Set-up
Subtask 38-42-42-860-051-A ** ON A/C NOT FOR ALL
Subtask 38-42-42-560-050-A ** ON A/C NOT FOR ALL
Subtask 38-42-42-410-050-D ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:26:01 UTC
Installation of the Air Filter
FIN: 4212MM ** ON A/C NOT FOR ALL
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | Torque wrench: range to between 1.1 and 0.99 m.daN (97.35 and 87.61 lbf.in ) ![]() |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 161DW, 171AL |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 4 | O-RING | AIPC 38-42-03-02-070 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-15-38-613-001-A | Fill the Potable Water Tank System (Aircraft Electrical Power Available) |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 25-55-12-000-001-A | Removal of the Aft Cargo-Compartment Partition at FR65 |
| TASK 25-55-12-400-001-A | Installation of the Aft Cargo-Compartment Partition at FR65 |
| TASK 38-10-00-614-002-A | Depressurization of the Potable Water System |
| TASK 38-42-00-610-001-A | Discard Compressor Outlet Filter-Element |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 52-30-00-860-002-A | Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
Subtask 38-42-42-860-051-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the potable water system is depressurized (Ref. AMM TASK 38-10-00-614-002).
Subtask 38-42-42-865-051-A ** ON A/C NOT FOR ALL (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the potable water system is depressurized (Ref. AMM TASK 38-10-00-614-002).
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 38-42-42-010-051-D ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2001VU | WATER SYS-AIR-COMPRESSOR | 19MD | F01 |
C. Get Access
(1) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position below the aft cargo-compartment door.
(2) Make sure that the aft cargo-compartment door is open (Ref. AMM TASK 52-30-00-860-001).
(3) Make sure that the access panel 161DW is removed from the aft cargo-compartment partition FR65 (Ref. AMM TASK 25-55-12-000-001).
4. Procedure(1) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position below the aft cargo-compartment door.
(2) Make sure that the aft cargo-compartment door is open (Ref. AMM TASK 52-30-00-860-001).
(3) Make sure that the access panel 161DW is removed from the aft cargo-compartment partition FR65 (Ref. AMM TASK 25-55-12-000-001).
Subtask 38-42-42-560-050-A ** ON A/C NOT FOR ALL
A. Preparation for Installation
(1) Remove the PLUG-BLANKING from each disconnected line end.
(2) Clean the component interfaces and the adjacent area.
(3) Do an inspection of the component interfaces and the adjacent area.
(4) Make sure that the parts retained from the removed component are clean and in the correct condition.
(5) If necessary, replace the air filter element (Ref. AMM TASK 38-42-00-610-001).
Subtask 38-42-42-420-050-A ** ON A/C NOT FOR ALL (1) Remove the PLUG-BLANKING from each disconnected line end.
(2) Clean the component interfaces and the adjacent area.
(3) Do an inspection of the component interfaces and the adjacent area.
(4) Make sure that the parts retained from the removed component are clean and in the correct condition.
(5) If necessary, replace the air filter element (Ref. AMM TASK 38-42-00-610-001).
B. Installation of the Air Filter
(1) Put the air filter (5) in position on the bracket.
(2) Install the bolts (3), the washers (7) and the nuts (8) on the air filter (5).
(3) Put a new AIPC 38-42-03-02-070 O-RING (4) in position between the air filter (5) and the check valve (2).
(4) Install the check valve (2) on the air filter (5).
(6) Connect the line end of the pipe (6) to the air filter (5).
(7) TORQUE the pipe connections (1) and (6) to between 1.1 and 0.99 m.daN (97.35 and 87.61 lbf.in )
.
Subtask 38-42-42-865-052-A ** ON A/C NOT FOR ALL (1) Put the air filter (5) in position on the bracket.
(2) Install the bolts (3), the washers (7) and the nuts (8) on the air filter (5).
(3) Put a new AIPC 38-42-03-02-070 O-RING (4) in position between the air filter (5) and the check valve (2).
(4) Install the check valve (2) on the air filter (5).
NOTE: On the check valve (2), make sure that the direction of the arrow points away from the air filter (5).
(5) Connect the line end of the pipe (1) to the check valve (2). (6) Connect the line end of the pipe (6) to the air filter (5).
(7) TORQUE the pipe connections (1) and (6) to between 1.1 and 0.99 m.daN (97.35 and 87.61 lbf.in )
. C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 38-42-42-860-050-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2001VU | WATER SYS-AIR-COMPRESSOR | 19MD | F01 |
D. Preparation for Test
(1) Fill the Potable-Water Tank System with 50 l (13.21 USgal) of water (Ref. AMM TASK 12-15-38-613-001).
Subtask 38-42-42-790-050-A ** ON A/C NOT FOR ALL (1) Fill the Potable-Water Tank System with 50 l (13.21 USgal) of water (Ref. AMM TASK 12-15-38-613-001).
E. Leak Test
(1) Make sure that the water service panel 171AL is closed.
(2) Make sure that installed air compressor starts to pressurize the potable water system.
(4) Leaks are not permitted.
5. Close-up(1) Make sure that the water service panel 171AL is closed.
(2) Make sure that installed air compressor starts to pressurize the potable water system.
NOTE: The air compressor starts automatically after the closure of the water service panel.
(3) Check the air filter (5) and the check valve (2) for leaks. (4) Leaks are not permitted.
Subtask 38-42-42-410-050-D ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panel 161DW to the aft cargo-compartment partition FR65 (Ref. AMM TASK 25-55-12-400-001).
(3) Close the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
(4) Remove the access platform(s).
(5) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Subtask 38-42-42-862-050-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panel 161DW to the aft cargo-compartment partition FR65 (Ref. AMM TASK 25-55-12-400-001).
(3) Close the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
(4) Remove the access platform(s).
(5) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Aft Air Filter