Removal of the Pressure Switch
TASK 38-42-16-000-001-A
Removal of the Pressure Switch
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 38-42-16-861-051-A ** ON A/C NOT FOR ALL Subtask 38-42-16-614-051-A ** ON A/C NOT FOR ALL Subtask 38-42-16-865-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:26:01 UTC
Removal of the Pressure Switch
FIN: 10MD ** ON A/C NOT FOR ALL
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| No specific | AR | CAP - BLANKING |
| No specific | AR | PLUG - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 161DW, 162DW |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 38-10-00-614-002-A | Depressurization of the Potable Water System |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
Subtask 38-42-16-861-051-A ** ON A/C NOT FOR ALL Subtask 38-42-16-614-051-A ** ON A/C NOT FOR ALL Subtask 38-42-16-865-050-A ** ON A/C NOT FOR ALL
C. Open, safety and tag this(these) circuit breaker(s):
Subtask 38-42-16-941-051-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2001VU | WATER SYS-AIR-COMPRESSOR | 19MD | F01 |
D. Put the WARNING NOTICE(S) in position to tell persons not to pressurize the pneumatic system.
Subtask 38-42-16-010-050-A ** ON A/C NOT FOR ALL E. Get Access
(1) Put an ACCESS PLATFORM 2M (6 FT) below the AFT cargo-compartment door.
(2) Open the AFT cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
(3) Remove the access panels 161DW 162DW.
4. Procedure(1) Put an ACCESS PLATFORM 2M (6 FT) below the AFT cargo-compartment door.
(2) Open the AFT cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
(3) Remove the access panels 161DW 162DW.
WARNING:
MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START WORK. PRESSURIZED AIR CAN CAUSE INJURY TO PERSONNEL.
Subtask 38-42-16-020-050-A ** ON A/C NOT FOR ALL A. Removal of pressure Switch 10MD
(2) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(3) Remove pressure switch (3) from the union (1).
(4) Put the PLUG-BLANKING in each disconnected line end.
CAUTION:
MAKE SURE THAT THE ELECTRICAL CONNECTORS ARE CLEAN BEFORE YOU DISCONNECT OR CONNECT THEM. CONTAMINATION ON THE ELECTRICAL CONNECTORS CAN CAUSE DAMAGE TO EQUIPMENT.
(1) Disconnect electrical connector (4) from the pressure switch (3). (2) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(3) Remove pressure switch (3) from the union (1).
(4) Put the PLUG-BLANKING in each disconnected line end.
Pressure Switch 10MD