Functional Test of the Pressure Switch
TASK 38-42-00-720-001-A
Functional Test of the Pressure Switch
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 38-42-00-861-056-A ** ON A/C NOT FOR ALL Subtask 38-42-00-010-056-C ** ON A/C NOT FOR ALL
Subtask 38-42-00-720-050-B ** ON A/C NOT FOR ALL
Subtask 38-42-00-080-051-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:26:01 UTC
Functional Test of the Pressure Switch
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| No specific | 1 | GAGE 5 BAR (75 PSI) - PRESSURE |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 162DW |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-15-38-613-001-A | Fill the Potable Water Tank System (Aircraft Electrical Power Available) |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 25-55-12-000-001-A | Removal of the Aft Cargo-Compartment Partition at FR65 |
| TASK 25-55-12-400-001-A | Installation of the Aft Cargo-Compartment Partition at FR65 |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 52-30-00-860-002-A | Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
Subtask 38-42-00-861-056-A ** ON A/C NOT FOR ALL Subtask 38-42-00-010-056-C ** ON A/C NOT FOR ALL
B. Get Access
(1) Open the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
(2) Put an ACCESS PLATFORM 2M (6 FT) at the aft cargo-compartment door.
(3) Remove partition 162DW (Ref. AMM TASK 25-55-12-000-001).
Subtask 38-42-00-865-060-A ** ON A/C NOT FOR ALL (1) Open the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
(2) Put an ACCESS PLATFORM 2M (6 FT) at the aft cargo-compartment door.
(3) Remove partition 162DW (Ref. AMM TASK 25-55-12-000-001).
C. Open, safety and tag this(these) circuit breaker(s):
Subtask 38-42-00-480-051-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2001VU | WATER SYS-AIR-COMPRESSOR | 19MD | F01 |
D. Connect a GAGE 5 BAR (75 PSI) - PRESSURE:
Subtask 38-42-00-865-061-A ** ON A/C NOT FOR ALL - To the test port installed on top of the potable water tank. Use a T-connection to connect it, or
- To the test port installed at the pressure reducing and relief valve.
E. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 38-42-00-613-053-A ** ON A/C NOT FOR ALL 4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2001VU | WATER SYS-AIR-COMPRESSOR | 19MD | F01 |
Subtask 38-42-00-720-050-B ** ON A/C NOT FOR ALL
A. Do this test.
5. Close-upNOTE: Before you start the test, make sure that there are no leaks in the compressor.
| ACTION | RESULT |
|---|---|
1.In an aft lavatory:
| In the lavatory:
|
2.At service panel 2023VU:
| In the air boost system:
|
| | In the lavatory:
|
3.At service panel 2023VU:
| In the air boost system:
|
4.Do step 1 to 3 again and make sure that the air compressor:
| |
5.At service panel 2023VU:
| In the air boost system:
|
Subtask 38-42-00-080-051-A ** ON A/C NOT FOR ALL
A. Remove the pressure gauge and install the blanking plug on the test connection.
Subtask 38-42-00-613-054-A ** ON A/C NOT FOR ALL Subtask 38-42-00-410-056-C ** ON A/C NOT FOR ALL C. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install partition 162DW (Ref. AMM TASK 25-55-12-400-001).
(3) Close the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
(4) Remove the access platform(s).
Subtask 38-42-00-862-056-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install partition 162DW (Ref. AMM TASK 25-55-12-400-001).
(3) Close the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
(4) Remove the access platform(s).