Operational Test of the Auxiliary Air Supply System.
TASK 38-42-00-710-001-A
Operational Test of the Auxiliary Air Supply System.
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 38-42-00-861-050-A ** ON A/C NOT FOR ALL Subtask 38-42-00-010-050-A ** ON A/C NOT FOR ALL
Subtask 38-42-00-710-050-A ** ON A/C NOT FOR ALL
Subtask 38-42-00-613-051-A ** ON A/C NOT FOR ALL Subtask 38-42-00-080-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 07:19:45 UTC
Operational Test of the Auxiliary Air Supply System.
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 1M(3 FT) |
| No specific | 1 | CONTAINER 20L (5 USGAL) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 171AL |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-15-38-613-001-A | Fill the Potable Water Tank System (Aircraft Electrical Power Available) |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
Subtask 38-42-00-861-050-A ** ON A/C NOT FOR ALL Subtask 38-42-00-010-050-A ** ON A/C NOT FOR ALL
B. Get Access
(1) Put the ACCESS PLATFORM 1M(3 FT) in position at Zone 171.
(2) Open the service panel 171AL.
Subtask 38-42-00-480-050-A ** ON A/C NOT FOR ALL (1) Put the ACCESS PLATFORM 1M(3 FT) in position at Zone 171.
(2) Open the service panel 171AL.
C. Put the CONTAINER 20L (5 USGAL) under the drain mast 14DU.
Subtask 38-42-00-865-050-A ** ON A/C NOT FOR ALL D. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 38-42-00-613-050-A ** ON A/C NOT FOR ALL 4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2001VU | WATER SYS-AIR-COMPRESSOR | 19MD | F01 |
Subtask 38-42-00-710-050-A ** ON A/C NOT FOR ALL
A. Do this test.
5. Close-upNOTE: Make sure that the compressor does not leak.
| ACTION | RESULT |
|---|---|
1.In an aft lavatory:
| In the lavatory:
|
2.At the service panel 2023VU:
| In the air boost system:
|
| | In the lavatory:
|
3.At the service panel 2023VU:
| In the air boost system:
|
Subtask 38-42-00-613-051-A ** ON A/C NOT FOR ALL Subtask 38-42-00-080-050-A ** ON A/C NOT FOR ALL
B. Remove the container from below the drain mast.
Subtask 38-42-00-410-050-A ** ON A/C NOT FOR ALL C. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the service panel 171AL.
(3) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Subtask 38-42-00-862-050-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the service panel 171AL.
(3) Remove the ground support and maintenance equipment, the special and standard tools and all other items.