W DOC AIRBUS | AMM A320F

Removal of the Check Valve


TASK 38-41-41-000-001-A
Removal of the Check Valve


WARNING: MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START WORK. PRESSURIZED AIR CAN CAUSE INJURY TO PERSONNEL.
ZONE: 130
ZONE: 170
FIN: 4205MM
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
No specific
AR
PLUG - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
130
FWD CARGO COMPT AFT BULKHEAD OF AVNCS COMPT TO FWD PRESSURE BULKHEAD OF WING CENTER BOX
170
AFT CAB U/FLOOR COMPT AFT BHD OF BULK
131PW
161DW
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 25-54-12-000-001-A
Removal of the Forward Cargo-Compartment Partition
TASK 25-55-12-000-001-A
Removal of the Aft Cargo-Compartment Partition at FR65
TASK 38-10-00-614-002-A
Depressurization of the Potable Water System
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-003-A
Open the FWD or Aft Cargo-Compartment Door with the Hand Pump
F Check Valve 4205MM. ** ON A/C NOT FOR ALL
F Check Valve 4205MM ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 38-41-41-861-050-A
A. Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
Subtask 38-41-41-614-050-A
B. Depresurize the potable water system (Ref. AMM TASK 38-10-00-614-002).
Subtask 38-41-41-941-051-A
C. Safety Precautions
   (1) Put warning notices in position to tell persons not to pressurize the potable water system.
Subtask 38-41-41-865-051-A
D. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2001VUWATER SYS-AIR-COMPRESSOR19MDF01
Subtask 38-41-41-010-050-A ** ON A/C NOT FOR ALL
E. Get Access
   (1) Open the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-001) or (Ref. AMM TASK 52-30-00-860-003).
   (2) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position.
   (3) Set CARGO COMPT LIGHT switch 8LU to ON.
   (4) Remove partition 161DW (Ref. AMM TASK 25-55-12-000-001).
Subtask 38-41-41-010-050-B ** ON A/C NOT FOR ALL
E. Get Access
   (1) Open the forward cargo-compartment door (Ref. AMM TASK 52-30-00-860-001) or (Ref. AMM TASK 52-30-00-860-003).
   (2) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position.
   (3) Set CARGO COMPT LIGHT switch 6LU to ON.
   (4) Remove partition 131PW (Ref. AMM TASK 25-54-12-000-001).
4. Procedure
Subtask 38-41-41-020-050-A
A. Removal of the Check Valve
WARNING: MAKE SURE THAT THE WATER TANK IS DEPRESSURIZED.
WARNING: DO NOT TOUCH THE UNIT UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS WHEN YOU DO THE MAINTENANCE TASK(S).
   (1) Loosen the unions (4) from the check valve (3) and the pressure reducing valve (6).
   (2) Remove the tube assembly (5).
   (3) Put the PLUG-BLANKING in each disconnected line end.
   (4) Remove the check valve (3) from the air filter assembly (1).
   (5) Remove the packing (2) and discard it.
[Rev.10 from 2021] 2026.04.02 06:26:00 UTC