Operational Test of the Potable-Water Air Supply-System (with the aircraft pneumatic system)
TASK 38-41-00-710-002-A
Operational Test of the Potable-Water Air Supply-System (with the aircraft pneumatic system)
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 38-41-00-861-053-A Subtask 38-41-00-480-051-A
Subtask 38-41-00-710-051-A
Subtask 38-41-00-410-052-A
[Rev.10 from 2021]
2026.04.02 06:25:59 UTC
Operational Test of the Potable-Water Air Supply-System (with the aircraft pneumatic system)
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | CONTAINER 20L (5 USGAL) |
| No specific | 1 | HOSE LENGTH 1,2 M (3,93 FT) - FLEXIBLE |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-15-38-613-001-A | Fill the Potable Water Tank System (Aircraft Electrical Power Available) |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 36-12-00-860-002-A | Pressurization of the Bleed System through the HP Ground Connector |
| TASK 38-10-00-614-002-A | Depressurization of the Potable Water System |
Subtask 38-41-00-861-053-A Subtask 38-41-00-480-051-A
B. Test Equipment
(1) Attach the HOSE LENGTH 1,2 M (3,93 FT) - FLEXIBLE to the water faucet in a lavatory.
(2) Put the other end of the hose into a CONTAINER 20L (5 USGAL).
(3) Operate the water faucet until the flow rate of the water decreases.
Subtask 38-41-00-860-050-A (1) Attach the HOSE LENGTH 1,2 M (3,93 FT) - FLEXIBLE to the water faucet in a lavatory.
(2) Put the other end of the hose into a CONTAINER 20L (5 USGAL).
(3) Operate the water faucet until the flow rate of the water decreases.
C. Preparation for Test
(1) If necessary fill the potable water tank (Ref. AMM TASK 12-15-38-613-001).
(2) Pressurize the aircraft pneumatic system (Ref. AMM TASK 36-12-00-860-002).
4. Procedure(1) If necessary fill the potable water tank (Ref. AMM TASK 12-15-38-613-001).
(2) Pressurize the aircraft pneumatic system (Ref. AMM TASK 36-12-00-860-002).
Subtask 38-41-00-710-051-A
A. Do this test.
5. Close-up| ACTION | RESULT |
|---|---|
1.In the aircraft pneumatic system:
| In the potable-water air supply-system:
|
2.In the lavatory:
| In the lavatory:
|
Subtask 38-41-00-410-052-A
A. Close Access
(1) Depressurize the potable water system (Ref. AMM TASK 38-10-00-614-002).
(2) If necessary fill the potable water tank (Ref. AMM TASK 12-15-38-613-001).
(3) Remove the hose and the container from the lavatory.
(4) Make sure that the work area is clean and clear of tools and other items.
(5) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Subtask 38-41-00-862-053-A (1) Depressurize the potable water system (Ref. AMM TASK 38-10-00-614-002).
(2) If necessary fill the potable water tank (Ref. AMM TASK 12-15-38-613-001).
(3) Remove the hose and the container from the lavatory.
(4) Make sure that the work area is clean and clear of tools and other items.
(5) Remove the ground support and maintenance equipment, the special and standard tools and all other items.