W DOC AIRBUS | AMM A320F

Installation of the Drain Valve Control


TASK 38-32-42-400-004-A
Installation of the Drain Valve Control


1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
CONTAINER 5 L (1.32 USGAL)
No specific
Torque wrench: range to between 175 and 150 lbf.in (1.98 and 1.70 m.daN ) T
 B. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
3
GASKET
AIPC 38-32-42-02-230
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
3. Job Set-up
Subtask 38-32-42-860-052-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
F Shutoff Valve ** ON A/C NOT FOR ALL
   (1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
   (2) Make sure that the door of the related lavatory is open.
   (3) Make sure that the sanitary cabinet door is open.
   (4) Make sure that the potable-water shutoff valve (30) is closed.
Subtask 38-32-42-560-051-A ** ON A/C NOT FOR ALL
B. Preparation for Installation
   (1) Make sure that the water faucet is closed.
   (2) Clean the component interfaces and the adjacent area.
   (3) Do an inspection of the component interfaces and the adjacent area.
   (4) Prevent damage to the component interfaces and the adjacent area.
4. Procedure
Subtask 38-32-42-420-054-A ** ON A/C NOT FOR ALL Subtask 38-32-42-820-052-A ** ON A/C NOT FOR ALL
B. Adjustment of the Drain Valve Control
F Drain Valve Control ** ON A/C NOT FOR ALL
   (1) Pull the lever (1) up until it stops.
   (2) Loosen the locknut (6) and the stud (5). Do not remove them from the connecting block (4).
   (3) Push the washbasin drain plug down and tighten the stud (5) and the locknut (6).
   (4) Push the lever (1) in and make sure that the washbasin drain plug opens.
   (5) Loosen the locknut (9) and the stud (8). Do not remove them from the connecting block (11).
   (6) Adjust the control rod (7) until it is perpendicular with the lever assembly (10) and tighten the stud (8) and the locknut (9).
   (7) Operate the lever (1) for a minimum of two times and make sure that the system operates freely.
   (8) Loosen the locknut (3) and adjust the stud (2) until the lever (1) has sufficient friction to keep it in the pulled position.
   (9) Tighten the locknut (3).
Subtask 38-32-42-790-051-A ** ON A/C NOT FOR ALL
C. Leak check of the washbasin drain
   (1) Close the washbasin drain valve.
   (2) Put CONTAINER 5 L (1.32 USGAL) to the drain masts 4DU and 14DU.
   (3) Put approximately 2.0 l (0.5283 USgal) of water into the washbasin.
   (4) Make sure that the water does not flow from the washbasin.
   (5) Examine the washbasin drain for leaks.
NOTE: Leaks are not permitted.
   (6) Open the washbasin drain.
   (7) Make sure that the water flows from the washbasin.
   (8) Remove the container(s).
5. Close-up
Subtask 38-32-42-410-057-A ** ON A/C NOT FOR ALL
A. Close Access
F Shutoff Valve ** ON A/C NOT FOR ALL
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
   (3) Open the potable-water shutoff valve (30).
   (4) Close the sanitary cabinet door.
   (5) Close access to the related lavatory.
Subtask 38-32-42-862-052-A ** ON A/C NOT FOR ALL
B. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
[Rev.10 from 2021] 2026.04.02 06:25:59 UTC