Installation of the Flush-Line Check Valves
TASK 38-31-76-400-001-A
Installation of the Flush-Line Check Valves
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 38-31-76-860-050-A
Subtask 38-31-76-420-050-A
Subtask 38-31-76-410-050-A
[Rev.10 from 2021]
2026.04.01 01:21:10 UTC
Installation of the Flush-Line Check Valves
WARNING:
DO NOT DO WORK ON THE TOILET WASTE SYSTEM AND THE POTABLE WATER SYSTEM AT THE SAME TIME. THIS WILL PREVENT CONTAMINATION OF THE POTABLE WATER SYSTEM. SUCH CONTAMINATION CAN BE DANGEROUS TO HEALTH.
WARNING:
ALWAYS USE RUBBER GLOVES WHEN YOU DO WORK:
- ON THE TOILET WASTE SYSTEM, OR
- ON PARTS THAT HAVE CONTAMINATION FROM THE WASTE SYSTEM.
NOTE: The installation of the forward flush-line check valve 3322MM is given. The procedure is the same for the aft check valve 3323MM.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 161DW, 162DW |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-16-38-613-001-A | Servicing of the Toilet System |
| TASK 21-31-51-000-001-A | Removal of the Outflow Valve (From Inside) |
| TASK 21-31-51-400-001-A | Installation of the Outflow Valve (From Inside) |
| TASK 21-31-51-400-006-A | Installation of the Outflow Valve (From Outside) |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 25-55-12-400-001-A | Installation of the Aft Cargo-Compartment Partition at FR65 |
| TASK 38-31-00-680-001-A | Draining of the Toilet System |
Subtask 38-31-76-860-050-A
A. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the toilet system is drained (Ref. AMM TASK 38-31-00-680-001).
(3) Make sure that ACCESS PLATFORM 2M (6 FT) is in the position below outflow valve 10HL in the zone 172.
(4) Make sure that outflow valve 10HL is removed (Ref. AMM TASK 21-31-51-000-001).
Subtask 38-31-76-865-064-A (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the toilet system is drained (Ref. AMM TASK 38-31-00-680-001).
(3) Make sure that ACCESS PLATFORM 2M (6 FT) is in the position below outflow valve 10HL in the zone 172.
(4) Make sure that outflow valve 10HL is removed (Ref. AMM TASK 21-31-51-000-001).
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACUUM-SYS | 35MG | A06 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACUUM-GEN | 33MG | A08 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-E | 34MG | A04 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-D | 39MG | A03 |
| ** ON A/C ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-A | 32MG | A01 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACU-SYS | 35MG | A06 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACU-GEN | 33MG | A08 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-G | 34MG | A04 |
| 2001VU | VACU TOIL SYS-LAV PWR-F | 39MG | A03 |
| 2001VU | VACU TOIL SYS-LAV PWR-D | 45MG | A02 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-L | 45MG | A02 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-L | 23MG | A05 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-M | 34MG | A04 |
Subtask 38-31-76-420-050-A
A. Installation of Flush-Line Check Valve 3322MM
(1) Remove the PLUG-BLANKING from each disconnected line end.
(2) Put flush-line check valve 3322MM (2) in position.
Subtask 38-31-76-865-065-A (1) Remove the PLUG-BLANKING from each disconnected line end.
(2) Put flush-line check valve 3322MM (2) in position.
NOTE: Make sure that the flush-line check valve 3322MM is installed in the correct direction of flow.
(3) Connect the pipe unions (1) and tighten them. B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 38-31-76-613-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACUUM-SYS | 35MG | A06 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACUUM-GEN | 33MG | A08 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-E | 34MG | A04 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-D | 39MG | A03 |
| ** ON A/C ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-A | 32MG | A01 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACU-SYS | 35MG | A06 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACU-GEN | 33MG | A08 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-G | 34MG | A04 |
| 2001VU | VACU TOIL SYS-LAV PWR-F | 39MG | A03 |
| 2001VU | VACU TOIL SYS-LAV PWR-D | 45MG | A02 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-L | 45MG | A02 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-L | 23MG | A05 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-M | 34MG | A04 |
C. Service the Toilet System (Ref. AMM TASK 12-16-38-613-001).
5. Close-upNOTE: Make sure that the pipe unions of the flush-line check valve do not leak.
Subtask 38-31-76-410-050-A
A. Get Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install partitions 161DW 162DW (Ref. AMM TASK 25-55-12-400-001).
(3) Install outflow valve 10HL (Ref. AMM TASK 21-31-51-400-001) (Ref. AMM TASK 21-31-51-400-006).
Subtask 38-31-76-862-050-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install partitions 161DW 162DW (Ref. AMM TASK 25-55-12-400-001).
(3) Install outflow valve 10HL (Ref. AMM TASK 21-31-51-400-001) (Ref. AMM TASK 21-31-51-400-006).
Flush Line Check-Valve