Removal of the Flush-Line Check Valves
TASK 38-31-76-000-001-A
Removal of the Flush-Line Check Valves
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 38-31-76-861-050-A Subtask 38-31-76-680-050-A Subtask 38-31-76-010-050-A
Subtask 38-31-76-020-050-A
[Rev.10 from 2021]
2026.04.01 01:21:09 UTC
Removal of the Flush-Line Check Valves
WARNING:
DO NOT DO WORK ON THE TOILET WASTE SYSTEM AND THE POTABLE WATER SYSTEM AT THE SAME TIME. THIS WILL PREVENT CONTAMINATION OF THE POTABLE WATER SYSTEM. SUCH CONTAMINATION CAN BE DANGEROUS TO HEALTH.
WARNING:
ALWAYS USE RUBBER GLOVES WHEN YOU DO WORK:
- ON THE TOILET WASTE SYSTEM, OR
- ON PARTS THAT HAVE CONTAMINATION FROM THE WASTE SYSTEM.
WARNING:
WHEN YOU REMOVE A COMPONENT OF THE TOILET WASTE SYSTEM, ALWAYS DISINFECT THE PART BEFORE YOU PUT IT IN A PLASTIC BAG, THEN SEAL THE BAG.
DO NOT PUT DOCUMENTS INTO THE PLASTIC BAG. SEAL THE BAG FIRST,THEN ATTACH THE DOCUMENTS TO IT.
THIS WILL PREVENT INFECTION OR ILLNESS. CONTAMINATION FROM THE WASTE CAN BE DANGEROUS TO HEALTH.
NOTE: The removal of the forward flush-line check valve 3322MM is given. The procedure is the same for the aft check valve 3323MM.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | PLUG - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 161DW, 162DW |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 21-31-51-000-001-A | Removal of the Outflow Valve (From Inside) |
| TASK 21-31-51-000-006-A | Removal of the Outflow Valve (From Outside) |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 25-55-12-000-001-A | Removal of the Aft Cargo-Compartment Partition at FR65 |
| TASK 38-30-00-510-001-A | Decontamination of Components of the Waste/Water and Toilet System for Shipping and/or Installation |
| TASK 38-31-00-680-001-A | Draining of the Toilet System |
Subtask 38-31-76-861-050-A Subtask 38-31-76-680-050-A Subtask 38-31-76-010-050-A
C. Get Access
(1) Remove outflow valve 10HL to get access to flush-line check valve 3322MM (Ref. AMM TASK 21-31-51-000-001) (Ref. AMM TASK 21-31-51-000-006).
(a) Make sure that partitions 161DW and 162DW are removed (Ref. AMM TASK 25-55-12-000-001).
Subtask 38-31-76-865-063-A (1) Remove outflow valve 10HL to get access to flush-line check valve 3322MM (Ref. AMM TASK 21-31-51-000-001) (Ref. AMM TASK 21-31-51-000-006).
(a) Make sure that partitions 161DW and 162DW are removed (Ref. AMM TASK 25-55-12-000-001).
D. Open, safety and tag this(these) circuit breaker(s):
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACUUM-SYS | 35MG | A06 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACUUM-GEN | 33MG | A08 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-E | 34MG | A04 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-D | 39MG | A03 |
| ** ON A/C ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-A | 32MG | A01 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACU-SYS | 35MG | A06 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACU-GEN | 33MG | A08 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-G | 34MG | A04 |
| 2001VU | VACU TOIL SYS-LAV PWR-F | 39MG | A03 |
| 2001VU | VACU TOIL SYS-LAV PWR-D | 45MG | A02 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-L | 45MG | A02 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-L | 23MG | A05 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-M | 34MG | A04 |
Subtask 38-31-76-020-050-A
A. Removal of Flush-Line Check Valve 3322MM
(2) Remove flush-line check valve 3322MM (2).
(3) Put the PLUG-BLANKING in each disconnected line end.
(4) If you use removed parts again, clean and disinfect them (Ref. AMM TASK 38-30-00-510-001).
WARNING:
ALWAYS WEAR RUBBER GLOVES, GOGGLES AND PROTECTIVE CLOTHES WHEN YOU DO THIS TASK.
(1) Disconnect the pipe unions (1). (2) Remove flush-line check valve 3322MM (2).
(3) Put the PLUG-BLANKING in each disconnected line end.
(4) If you use removed parts again, clean and disinfect them (Ref. AMM TASK 38-30-00-510-001).
Flush Line Check-Valve