Installation of the Water Separator
TASK 38-31-67-400-001-A
Installation of the Water Separator
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Expendable Parts
D. Referenced Information
3. Job Set-up
Subtask 38-31-67-860-050-A
Subtask 38-31-67-420-050-B ** ON A/C NOT FOR ALL
Subtask 38-31-67-410-050-C
[Rev.10 from 2021]
2026.04.01 01:20:56 UTC
Installation of the Water Separator
WARNING:
DO NOT DO WORK ON THE TOILET WASTE SYSTEM AND THE POTABLE WATER SYSTEM AT THE SAME TIME. THIS WILL PREVENT CONTAMINATION OF THE POTABLE WATER SYSTEM. SUCH CONTAMINATION CAN BE DANGEROUS TO HEALTH.
WARNING:
ALWAYS USE RUBBER GLOVES WHEN YOU DO WORK:
1. Reason for the Job- ON THE TOILET WASTE SYSTEM, OR
- ON PARTS THAT HAVE CONTAMINATION FROM THE WASTE SYSTEM.
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | Torque wrench: range to between 0.48 and 0.39 m.daN (42.48 and 34.51 lbf.in ) ![]() |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 170 | AFT CAB U/FLOOR COMPT AFT BHD OF BULK |
| 162DW |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 3 | PACKING | AIPC 38-31-04-34-110 |
| 3 | PACKING | AIPC 38-31-84-44-100 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 25-55-12-400-001-A | Installation of the Aft Cargo-Compartment Partition at FR65 |
| TASK 38-31-00-680-001-A | Draining of the Toilet System |
| TASK 38-31-00-710-009-A | Operational Test of the Toilet Unit |
| TASK 38-31-00-790-002-A | Leak Test of the Vacuum Toilet System (VTS) |
| TASK 52-30-00-860-002-A | Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
Subtask 38-31-67-860-050-A
A. Aircraft Maintenance Configuration
(1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the toilet system is drained (Ref. AMM TASK 38-31-00-680-001).
Subtask 38-31-67-865-066-A (1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the toilet system is drained (Ref. AMM TASK 38-31-00-680-001).
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACUUM-SYS | 35MG | A06 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACUUM-GEN | 33MG | A08 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-E | 34MG | A04 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-D | 39MG | A03 |
| ** ON A/C ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-A | 32MG | A01 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACU-SYS | 35MG | A06 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACU-GEN | 33MG | A08 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-G | 34MG | A04 |
| 2001VU | VACU TOIL SYS-LAV PWR-F | 39MG | A03 |
| 2001VU | VACU TOIL SYS-LAV PWR-D | 45MG | A02 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-L | 45MG | A02 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-L | 23MG | A05 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-M | 34MG | A04 |
Subtask 38-31-67-420-050-B ** ON A/C NOT FOR ALL
A. Installation of the Water Separator 3302MM
(1) Remove the blanking cap from the waste tank (4).
(2) Install the new AIPC 38-31-04-34-110 PACKING (3) in the waste tank (4).
(3) Install the basic separator (5) in the waste tank (4).
(4) Install the filter housing assembly (7).
(5) Install the V-clamp (6) and TORQUE to between 0.48 and 0.39 m.daN (42.48 and 34.51 lbf.in )
.
(6) Install the sleeve (2).
(7) Install the clamps (1) and tighten them.
Subtask 38-31-67-420-050-D ** ON A/C NOT FOR ALL (1) Remove the blanking cap from the waste tank (4).
(2) Install the new AIPC 38-31-04-34-110 PACKING (3) in the waste tank (4).
(3) Install the basic separator (5) in the waste tank (4).
(4) Install the filter housing assembly (7).
(5) Install the V-clamp (6) and TORQUE to between 0.48 and 0.39 m.daN (42.48 and 34.51 lbf.in )
. (6) Install the sleeve (2).
(7) Install the clamps (1) and tighten them.
A. Installation of the Water Separator 3302MM
(1) Remove the blanking cap from the waste tank (4).
(2) Install the new AIPC 38-31-04-34-110 PACKING (3) or AIPC 38-31-84-44-100 PACKING (3) in the waste tank (4).
(3) Install the basic separator assembly (7) in the waste tank (4).
(4) Install the filter housing assembly (6) to the basic separator assembly (7).
(5) Install the V-clamp (5) and TORQUE to between 0.48 and 0.39 m.daN (42.48 and 34.51 lbf.in )
.
(6) Install the sleeve (2).
(7) Install the clamps (1) and tighten them.
Subtask 38-31-67-865-071-A (1) Remove the blanking cap from the waste tank (4).
(2) Install the new AIPC 38-31-04-34-110 PACKING (3) or AIPC 38-31-84-44-100 PACKING (3) in the waste tank (4).
(3) Install the basic separator assembly (7) in the waste tank (4).
(4) Install the filter housing assembly (6) to the basic separator assembly (7).
(5) Install the V-clamp (5) and TORQUE to between 0.48 and 0.39 m.daN (42.48 and 34.51 lbf.in )
. (6) Install the sleeve (2).
(7) Install the clamps (1) and tighten them.
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 38-31-67-790-051-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACUUM-SYS | 35MG | A06 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACUUM-GEN | 33MG | A08 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-E | 34MG | A04 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-D | 39MG | A03 |
| ** ON A/C ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-A | 32MG | A01 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACU-SYS | 35MG | A06 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACU-GEN | 33MG | A08 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-G | 34MG | A04 |
| 2001VU | VACU TOIL SYS-LAV PWR-F | 39MG | A03 |
| 2001VU | VACU TOIL SYS-LAV PWR-D | 45MG | A02 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-L | 45MG | A02 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-L | 23MG | A05 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-M | 34MG | A04 |
C. Leak Test
(1) Do the leak test of the vacuum toilet system (Ref. AMM TASK 38-31-00-790-002).
(2) Record the result of the test.
(3) Compare the result of the test before the removal and after the installation.
Subtask 38-31-67-710-050-A 5. Close-up(1) Do the leak test of the vacuum toilet system (Ref. AMM TASK 38-31-00-790-002).
(2) Record the result of the test.
(3) Compare the result of the test before the removal and after the installation.
NOTE: The difference between the tests must not be more than 10% of the result made before the removal.
Subtask 38-31-67-410-050-C
A. Close Access
(1) Install the tank insulation that surround the clamp of the water separator if removed during the removal procedure.
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Install access panel 162DW (Ref. AMM TASK 25-55-12-400-001).
(4) Remove the access platform(s).
(5) Close the AFT cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
Subtask 38-31-67-862-050-A (1) Install the tank insulation that surround the clamp of the water separator if removed during the removal procedure.
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Install access panel 162DW (Ref. AMM TASK 25-55-12-400-001).
(4) Remove the access platform(s).
(5) Close the AFT cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
Water Separator