Installation of the Check Valve
TASK 38-31-65-400-001-A
Installation of the Check Valve
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 38-31-65-860-050-A
Subtask 38-31-65-420-050-A
Subtask 38-31-65-410-050-A
[Rev.10 from 2021]
2026.04.01 01:20:49 UTC
Installation of the Check Valve
WARNING:
DO NOT DO WORK ON THE TOILET WASTE SYSTEM AND THE POTABLE WATER SYSTEM AT THE SAME TIME. THIS WILL PREVENT CONTAMINATION OF THE POTABLE WATER SYSTEM. SUCH CONTAMINATION CAN BE DANGEROUS TO HEALTH.
WARNING:
ALWAYS USE RUBBER GLOVES WHEN YOU DO WORK:
- ON THE TOILET WASTE SYSTEM, OR
- ON PARTS THAT HAVE CONTAMINATION FROM THE WASTE SYSTEM.
FIN: 3320MM
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 161DW, 162DW |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 38-31-00-710-009-A | Operational Test of the Toilet Unit |
| TASK 52-30-00-860-002-A | Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
Subtask 38-31-65-860-050-A
A. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
Subtask 38-31-65-865-060-A (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACUUM-SYS | 35MG | A06 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACUUM-GEN | 33MG | A08 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-E | 34MG | A04 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-D | 39MG | A03 |
| ** ON A/C ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-A | 32MG | A01 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACU-SYS | 35MG | A06 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACU-GEN | 33MG | A08 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-G | 34MG | A04 |
| 2001VU | VACU TOIL SYS-LAV PWR-F | 39MG | A03 |
| 2001VU | VACU TOIL SYS-LAV PWR-D | 45MG | A02 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-L | 45MG | A02 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-L | 23MG | A05 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-M | 34MG | A04 |
Subtask 38-31-65-420-050-A
A. Installation of the Check Valve 33200MM
(1) Remove the blanking plugs from the line ends.
(2) Put the check valve 3320 MM in position.
(4) Install the clamps (1).
Subtask 38-31-65-865-062-A (1) Remove the blanking plugs from the line ends.
(2) Put the check valve 3320 MM in position.
NOTE: Make sure that the check valve is installed in the correct direction of flow.
(3) Install the sleeves (2). (4) Install the clamps (1).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 38-31-65-710-050-A 5. Close-up| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACUUM-SYS | 35MG | A06 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACUUM-GEN | 33MG | A08 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-E | 34MG | A04 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-D | 39MG | A03 |
| ** ON A/C ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-A | 32MG | A01 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACU-SYS | 35MG | A06 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACU-GEN | 33MG | A08 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-G | 34MG | A04 |
| 2001VU | VACU TOIL SYS-LAV PWR-F | 39MG | A03 |
| 2001VU | VACU TOIL SYS-LAV PWR-D | 45MG | A02 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-L | 45MG | A02 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-L | 23MG | A05 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-M | 34MG | A04 |
Subtask 38-31-65-410-050-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panel 161DW and 162DW.
(3) Close the AFT cargo compartment door (Ref. AMM TASK 52-30-00-860-002).
(4) Remove the access platform(s).
Subtask 38-31-65-862-050-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panel 161DW and 162DW.
(3) Close the AFT cargo compartment door (Ref. AMM TASK 52-30-00-860-002).
(4) Remove the access platform(s).
Check Valve