W DOC AIRBUS | AMM A320F

Removal of the Vent Outlet of the Vacuum Vent Line


TASK 38-31-65-000-802-A
Removal of the Vent Outlet of the Vacuum Vent Line


WARNING: DO NOT DO WORK ON THE TOILET WASTE SYSTEM AND THE POTABLE WATER SYSTEM AT THE SAME TIME. THIS WILL PREVENT CONTAMINATION OF THE POTABLE WATER SYSTEM. SUCH CONTAMINATION CAN BE DANGEROUS TO HEALTH.
WARNING: ALWAYS USE RUBBER GLOVES WHEN YOU DO WORK:
  • ON THE TOILET WASTE SYSTEM, OR
  • ON PARTS THAT HAVE CONTAMINATION FROM THE WASTE SYSTEM.
WHEN YOU COMPLETE THE WORK PROCEDURE, CLEAN YOUR HANDS WITH SOAP AND WATER. THIS WILL PREVENT INFECTION (TOILET WASTE IS DANGEROUS FOR HEALTH).
WARNING: WHEN YOU REMOVE A COMPONENT OF THE TOILET WASTE SYSTEM, ALWAYS DISINFECT THE PART BEFORE YOU PUT IT IN A PLASTIC BAG, THEN SEAL THE BAG. DO NOT PUT DOCUMENTS INTO THE PLASTIC BAG. SEAL THE BAG FIRST,THEN ATTACH THE DOCUMENTS TO IT. THIS WILL PREVENT INFECTION OR ILLNESS. CONTAMINATION FROM THE WASTE CAN BE DANGEROUS TO HEALTH.
ZONE: 170
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 1M(3 FT)
No specific
1
ACCESS PLATFORM 2M (6 FT)
No specific
1
BAG - PLASTIC
No specific
AR
PLUG - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
170
AFT CAB U/FLOOR COMPT AFT BHD OF BULK
161DW, 162DW, 826
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 25-55-12-000-001-A
Removal of the Aft Cargo-Compartment Partition at FR65
TASK 38-30-00-510-001-A
Decontamination of Components of the Waste/Water and Toilet System for Shipping and/or Installation
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
3. Job Set-up
Subtask 38-31-65-861-052-A
A. Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
Subtask 38-31-65-010-052-A
B. Get Access
   (1) Put the ACCESS PLATFORM 1M(3 FT) in position below the vacuum-vent line outlet.
   (2) Put the ACCESS PLATFORM 2M (6 FT) in position at aft cargo-compartment door 826.
   (3) Open aft cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-001).
   (4) Remove access panels 161DW and 162DW (Ref. AMM TASK 25-55-12-000-001).
Subtask 38-31-65-865-063-A
C. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2001VUVACU TOIL SYS-VACUUM-SYS35MGA06
** ON A/C NOT FOR ALL
2001VUVACU TOIL SYS-VACUUM-GEN33MGA08
** ON A/C NOT FOR ALL
2001VUVACU TOIL SYS-LAV PWR-E34MGA04
** ON A/C NOT FOR ALL
2001VUVACU TOIL SYS-LAV PWR-D39MGA03
** ON A/C ALL
2001VUVACU TOIL SYS-LAV PWR-A32MGA01
** ON A/C NOT FOR ALL
2001VUVACU TOIL SYS-VACU-SYS35MGA06
** ON A/C NOT FOR ALL
2001VUVACU TOIL SYS-VACU-GEN33MGA08
** ON A/C NOT FOR ALL
2001VUVACU TOIL SYS-LAV PWR-G34MGA04
2001VUVACU TOIL SYS-LAV PWR-F39MGA03
2001VUVACU TOIL SYS-LAV PWR-D45MGA02
** ON A/C NOT FOR ALL
2001VUVACU TOIL SYS-LAV PWR-L45MGA02
** ON A/C NOT FOR ALL
2001VUVACU TOIL SYS-LAV PWR-L23MGA05
** ON A/C NOT FOR ALL
2001VUVACU TOIL SYS-LAV PWR-M34MGA04
4. Procedure
Subtask 38-31-65-020-052-A
A. Removal of the Vent Outlet
   (1) Remove the screws (4).
   (2) Remove the nut (1), the screw (2) and the washer (3).
   (3) Disconnect the bonding lead (7) from the vent outlet (5).
   (4) Loosen the two clamps (6).
   (5) Remove the vent outlet (5).
   (6) Put the PLUG-BLANKING in each disconnected line end.
   (7) Clean the vent outlet (5), disinfect it and put it in a BAG - PLASTIC (Ref. AMM TASK 38-30-00-510-001).