W DOC AIRBUS | AMM A320F

Removal of the Check Valve


TASK 38-31-65-000-001-A
Removal of the Check Valve


WARNING: DO NOT DO WORK ON THE TOILET WASTE SYSTEM AND THE POTABLE WATER SYSTEM AT THE SAME TIME. THIS WILL PREVENT CONTAMINATION OF THE POTABLE WATER SYSTEM. SUCH CONTAMINATION CAN BE DANGEROUS TO HEALTH.
WARNING: ALWAYS USE RUBBER GLOVES WHEN YOU DO WORK:
  • ON THE TOILET WASTE SYSTEM, OR
  • ON PARTS THAT HAVE CONTAMINATION FROM THE WASTE SYSTEM.
WHEN YOU COMPLETE THE WORK PROCEDURE, CLEAN YOUR HANDS WITH SOAP AND WATER. THIS WILL PREVENT INFECTION (TOILET WASTE IS DANGEROUS FOR HEALTH).
WARNING: WHEN YOU REMOVE A COMPONENT OF THE TOILET WASTE SYSTEM, ALWAYS DISINFECT THE PART BEFORE YOU PUT IT IN A PLASTIC BAG, THEN SEAL THE BAG. DO NOT PUT DOCUMENTS INTO THE PLASTIC BAG. SEAL THE BAG FIRST,THEN ATTACH THE DOCUMENTS TO IT. THIS WILL PREVENT INFECTION OR ILLNESS. CONTAMINATION FROM THE WASTE CAN BE DANGEROUS TO HEALTH.
FIN: 3320MM
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT)
No specific
AR
PLUG - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
161DW, 162DW, 826
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 38-30-00-510-001-A
Decontamination of Components of the Waste/Water and Toilet System for Shipping and/or Installation
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
F Check Valve ** ON A/C NOT FOR ALL
F Check Valve ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 38-31-65-861-050-A
A. Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
Subtask 38-31-65-865-059-A
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2001VUVACU TOIL SYS-VACUUM-SYS35MGA06
** ON A/C NOT FOR ALL
2001VUVACU TOIL SYS-VACUUM-GEN33MGA08
** ON A/C NOT FOR ALL
2001VUVACU TOIL SYS-LAV PWR-E34MGA04
** ON A/C NOT FOR ALL
2001VUVACU TOIL SYS-LAV PWR-D39MGA03
** ON A/C ALL
2001VUVACU TOIL SYS-LAV PWR-A32MGA01
** ON A/C NOT FOR ALL
2001VUVACU TOIL SYS-VACU-SYS35MGA06
** ON A/C NOT FOR ALL
2001VUVACU TOIL SYS-VACU-GEN33MGA08
** ON A/C NOT FOR ALL
2001VUVACU TOIL SYS-LAV PWR-G34MGA04
2001VUVACU TOIL SYS-LAV PWR-F39MGA03
2001VUVACU TOIL SYS-LAV PWR-D45MGA02
** ON A/C NOT FOR ALL
2001VUVACU TOIL SYS-LAV PWR-L45MGA02
** ON A/C NOT FOR ALL
2001VUVACU TOIL SYS-LAV PWR-L23MGA05
** ON A/C NOT FOR ALL
2001VUVACU TOIL SYS-LAV PWR-M34MGA04
Subtask 38-31-65-010-050-A
C. Get Access
   (1) Open the AFT cargo compartment door (Ref. AMM TASK 52-30-00-860-001).
   (2) Put the ACCESS PLATFORM 2M (6 FT) in position at the AFT cargo compartment door 826.
   (3) Remove the access panel 161DW and 162DW.
4. Procedure
Subtask 38-31-65-020-050-A
A. Removal of the Check Valve 3320MM
WARNING: ALWAYS WEAR RUBBER GLOVES, GOGGLES AND PROTECTIVE CLOTHES WHEN YOU DO THIS TASK.
   (1) Remove the clamps (1).
   (2) Remove the sleeves (2).
   (3) Remove the check valve 3320MM.
   (4) Put the PLUG-BLANKING in each disconnected line end.
   (5) If you use removed parts again, clean and disinfect them (Ref. AMM TASK 38-30-00-510-001).