Installation of the Vacuum System Controller


TASK 38-31-34-400-001-A
Installation of the Vacuum System Controller


FIN: 31MG ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
162AW, 162BW
162GW
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 38-31-00-710-009-A
Operational Test of the Toilet Unit
TASK 38-31-00-740-001-A
BITE Test of the Vacuum Toilet System
TASK 52-30-00-860-002-A
Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
3. Job Set-up
Subtask 38-31-34-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the ground service network is energized from the external power (Ref. AMM TASK 24-42-00-861-001).
Subtask 38-31-34-865-059-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2001VUVACU TOIL SYS-VACUUM-SYS35MGA06
** ON A/C NOT FOR ALL
2001VUVACU TOIL SYS-VACUUM-GEN33MGA08
2001VUVACU TOIL SYS-LAV PWR-E34MGA04
2001VUVACU TOIL SYS-LAV PWR-D39MGA03
2001VUVACU TOIL SYS-LAV PWR-A32MGA01
** ON A/C NOT FOR ALL
2001VUVACU TOIL SYS-VACU-SYS35MGA06
2001VUVACU TOIL SYS-LAV PWR-L45MGA02
4. Procedure
Subtask 38-31-34-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the Vacuum System Controller 31MG
   (1) Inspect the connector pins at the controller for good condition.
   (2) Inspect the sockets at the vacuum controller tray for good condition.
   (3) Carefully install the vacuum controller (2) in the vacuum controller tray.
   (4) Safety the vacuum controller (2) with the fastener (1).
Subtask 38-31-34-865-060-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2001VUVACU TOIL SYS-VACUUM-SYS35MGA06
** ON A/C NOT FOR ALL
2001VUVACU TOIL SYS-VACUUM-GEN33MGA08
2001VUVACU TOIL SYS-LAV PWR-E34MGA04
2001VUVACU TOIL SYS-LAV PWR-D39MGA03
2001VUVACU TOIL SYS-LAV PWR-A32MGA01
** ON A/C NOT FOR ALL
2001VUVACU TOIL SYS-VACU-SYS35MGA06
2001VUVACU TOIL SYS-LAV PWR-L45MGA02
Subtask 38-31-34-710-050-A ** ON A/C NOT FOR ALL
C. Do the Test
   (1) Do the bite test of the vacuum toilet system (Ref. AMM TASK 38-31-00-740-001).
   (2) Operate the flush knob of a toilet and make sure that it flushes correctly (Ref. AMM TASK 38-31-00-710-009).
5. Close-up
Subtask 38-31-34-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the access panel 162BW and/or the access panel 162AW.
   (3) Close the AFT cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
   (4) Remove the access platform(s).
Subtask 38-31-34-410-050-B ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the access panel 162GW and the aft corner section.
   (3) Close the BULK cargo-compartment door.
   (4) Remove the access platform(s).
Subtask 38-31-34-862-050-A ** ON A/C NOT FOR ALL
B. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).