W DOC AIRBUS | AMM A320F

Adjustment of the Contact Point of the Waste Service-Panel-Door Limit-Switch


TASK 38-31-00-820-001-A
Adjustment of the Contact Point of the Waste Service-Panel-Door Limit-Switch


FIN: 44MG
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT)
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.05BAE1)
Threadlocking Adhesive-- Medium strength -
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 38-31-00-710-009-A
Operational Test of the Toilet Unit
3. Job Set-up
Subtask 38-31-00-861-064-A
A. Energize the ground service network
(Ref. AMM TASK 24-41-00-861-002).
Subtask 38-31-00-010-070-A
B. Get Access
   (1) Put the ACCESS PLATFORM 2M (6 FT) in position below the waste service panel.
   (2) Open the door of the waste service panel 172AR.
4. Procedure
Subtask 38-31-00-820-050-A
A. Adjustment of the Contact Point of the Waste Service-Panel-Door Limit-Switch 44MG
   (1) Loosen the nut (3) and remove the stud (2) together with the nut (3) and the washer (4).
   (2) Clean the nut (3) the stud (2) and the washer (4).
   (3) Apply Threadlocking Adhesive-- Medium strength - (Material No.05BAE1) to the threads of the stud (2).
NOTE: Refer to the manufacturer's instructions for the drying time of this material.
   (4) Install the stud (2) the nut (3) and the washer (4) do not tighten at this time.
   (5) Push the waste service panel-door (1) to the close position.
     (a) If you do not hear a click from the limit switch (5):
       1 Open the waste service panel-door (1).
       2 Turn the stud (2) counterclockwise half of a turn.
       3 Close the waste service panel-door (1).
       4 Do the procedure again until you hear a click from the limit switch (5).
     (b) If you hear a click from the limit switch (5):
       1 Open the waste service panel-door (1).
       2 Turn the stud (2) clockwise half of a turn.
       3 Push the waste service panel-door (1) to the closed position.
       4 Do the procedure again until you do not hear a click from the limit switch (5).
       5 Turn the stud (2) counterclockwise half of a turn.
   (6) Turn the stud (2) counterclockwise approximately 2 mm (0.079 in.) more.
   (7) Hold the stud (2), and tighten the nut (3).
   (8) Operate the toilets and make sure they flush correctly (Ref. AMM TASK 38-31-00-710-009).
5. Close-up
Subtask 38-31-00-410-068-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the waste service-panel door 172AR.
   (3) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
   (4) Remove the access platform(s).
Subtask 38-31-00-862-064-A
B. De-energize the ground service network
(Ref. AMM TASK 24-41-00-862-002).
[Rev.10 from 2021] 2026.04.01 01:19:35 UTC