Operational Test of the Door Limit Switch
TASK 38-31-00-710-008-A
Operational Test of the Door Limit Switch
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 38-31-00-861-059-A Subtask 38-31-00-865-123-A
Subtask 38-31-00-710-061-A
Subtask 38-31-00-410-069-A
[Rev.10 from 2021]
2026.04.01 01:19:51 UTC
Operational Test of the Door Limit Switch
FIN: 44MG
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 3M (10 FT) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 172AR |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
Subtask 38-31-00-861-059-A Subtask 38-31-00-865-123-A
B. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 38-31-00-010-071-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACUUM-SYS | 35MG | A06 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACUUM-GEN | 33MG | A08 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-E | 34MG | A04 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-D | 39MG | A03 |
| ** ON A/C ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-A | 32MG | A01 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACU-SYS | 35MG | A06 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACU-GEN | 33MG | A08 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-G | 34MG | A04 |
| 2001VU | VACU TOIL SYS-LAV PWR-F | 39MG | A03 |
| 2001VU | VACU TOIL SYS-LAV PWR-D | 45MG | A02 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-L | 45MG | A02 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-L | 23MG | A05 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-M | 34MG | A04 |
C. Get Access
(1) Put an ACCESS PLATFORM 3M (10 FT) in position under the waste service panel.
(2) Open the waste service-panel door 172AR.
4. Procedure(1) Put an ACCESS PLATFORM 3M (10 FT) in position under the waste service panel.
(2) Open the waste service-panel door 172AR.
Subtask 38-31-00-710-061-A
A. Operational Test of the Waste-Service Panel Door-Switch 44MG
5. Close-up| ACTION | RESULT |
|---|---|
1.At the waste service panel:
| On the Forward Attendants Panel (FAP) 120RH/miscellaneous panel WATER AND WASTE 124RH:
|
2.In a lavatory:
| In the Zone 170:
|
| | In the lavatory:
|
3.At the waste service panel:
| On the FAP 120RH/miscellaneous panel WATER AND WASTE 124RH:
|
4.In a lavatory:
| In the Zone 170:
|
| | In the lavatory:
NOTE: If the potable water tank is empty the toilet flush will operate but there will be no water spray in the toilet bowl. |
Subtask 38-31-00-410-069-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the waste service-panel door 172AR.
Subtask 38-31-00-862-059-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the waste service-panel door 172AR.
NOTE: Make sure that the latches are correctly locked and that the door makes a continuous surface with the skin of the aircraft.
(3) Remove the access platform(s).