Operational Test of the Vacuum Toilet System
TASK 38-31-00-710-002-A
Operational Test of the Vacuum Toilet System
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 38-31-00-861-052-A
Subtask 38-31-00-710-053-C ** ON A/C NOT FOR ALL
Subtask 38-31-00-080-051-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 01:19:42 UTC
Operational Test of the Vacuum Toilet System
NOTE: The operational test of the vacuum toilet system in one lavatory is given. The procedure is the same for all the other lavatories.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| No specific | 1 | ACCESS PLATFORM 3M (10 FT) |
| No specific | 1 | TEST UNIT-STATIC PITOT |
| 98D38308234001 | 1 | ADAPTER - ALTITUDE PRESSURE SWITCH |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 172AR | |
| 312AR |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-15-38-613-001-A | Fill the Potable Water Tank System (Aircraft Electrical Power Available) |
| TASK 12-16-38-613-001-A | Servicing of the Toilet System |
| TASK 23-73-00-861-001-A | Energize the Cabin Intercommunication Data System (CIDS) |
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 32-69-00-860-001-A | Simulation of Flight (With Aircraft on Ground) |
| TASK 38-31-00-680-001-A | Draining of the Toilet System |
Subtask 38-31-00-861-052-A
A. Aircraft Maintenance Configuration
(1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the Cabin Intercommunication Data System (CIDS) is energized and is clear from all faults (Ref. AMM TASK 23-73-00-861-001).
Subtask 38-31-00-010-052-A ** ON A/C NOT FOR ALL (1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the Cabin Intercommunication Data System (CIDS) is energized and is clear from all faults (Ref. AMM TASK 23-73-00-861-001).
B. Get Access
(1) Put the ACCESS PLATFORM 3M (10 FT) below the access panel 312AR.
(2) Put the ACCESS PLATFORM 2M (6 FT) below the access panel 172AR.
(3) Open the access panels 312AR 172AR.
Subtask 38-31-00-010-052-C ** ON A/C NOT FOR ALL (1) Put the ACCESS PLATFORM 3M (10 FT) below the access panel 312AR.
(2) Put the ACCESS PLATFORM 2M (6 FT) below the access panel 172AR.
(3) Open the access panels 312AR 172AR.
B. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) below the access panel 172AR.
(2) Open the access panels 172AR.
Subtask 38-31-00-865-101-A (1) Put the ACCESS PLATFORM 2M (6 FT) below the access panel 172AR.
(2) Open the access panels 172AR.
C. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 38-31-00-613-052-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACUUM-SYS | 35MG | A06 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACUUM-GEN | 33MG | A08 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-E | 34MG | A04 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-D | 39MG | A03 |
| ** ON A/C ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-A | 32MG | A01 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACU-SYS | 35MG | A06 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACU-GEN | 33MG | A08 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-G | 34MG | A04 |
| 2001VU | VACU TOIL SYS-LAV PWR-F | 39MG | A03 |
| 2001VU | VACU TOIL SYS-LAV PWR-D | 45MG | A02 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-L | 45MG | A02 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-L | 23MG | A05 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-M | 34MG | A04 |
D. Filling of the Potable Water Tank System
(1) Fill the potable water tank system (Ref. AMM TASK 12-15-38-613-001).
Subtask 38-31-00-680-053-A Subtask 38-31-00-480-051-A ** ON A/C NOT FOR ALL (1) Fill the potable water tank system (Ref. AMM TASK 12-15-38-613-001).
F. Installation of the Test Equipment
(1) Install the 98D38308234001 ADAPTER - ALTITUDE PRESSURE SWITCH on the altitude pressure switch 43MG.
(2) Connect the TEST UNIT-STATIC PITOT to the altitude pressure switch-adapter.
Subtask 38-31-00-860-050-A ** ON A/C NOT FOR ALL Subtask 38-31-00-860-050-C ** ON A/C NOT FOR ALL (1) Install the 98D38308234001 ADAPTER - ALTITUDE PRESSURE SWITCH on the altitude pressure switch 43MG.
(2) Connect the TEST UNIT-STATIC PITOT to the altitude pressure switch-adapter.
G. Preparation for the Test
(1) Make sure that the TOILET page is shown on the CFDS.
(2) Make sure that there is no failure in the fault memory of the CFDS.
4. Procedure(1) Make sure that the TOILET page is shown on the CFDS.
(2) Make sure that there is no failure in the fault memory of the CFDS.
Subtask 38-31-00-710-053-C ** ON A/C NOT FOR ALL
A. Do this test.
Subtask 38-31-00-710-053-E ** ON A/C NOT FOR ALL NOTE: Make sure that the access panel 172AR is closed or the limit switch 44MG is pushed and hold in during the test.
| ACTION | RESULT |
|---|---|
1.On the altitude pressure switch 43MG:
| |
2.In all lavatories:
| In the vacuum toilet system:
|
3.In two lavatories:
| In the vacuum toilet system:
|
4.In a lavatory:
| In the vacuum toilet system:
|
|
|
| The flush cycle starts immediately. |
5.On the altitude pressure switch 43MG:
| |
6.In one lavatory:
| In the vacuum toilet system:
|
7.On the altitude pressure switch 43MG:
| |
8.In a different lavatory:
| In the vacuum toilet system:
|
A. Operational Test
(1) On the MCDU make sure that there are no fault messages:
(a) Get access to the CIDS X - TOILET SYS STATUS page on the MCDU.
(b) Make sure that the configuration of the vacuum system is as shown on the CIDS X - TOILET SYS STATUS page.
5. Close-up(1) On the MCDU make sure that there are no fault messages:
(a) Get access to the CIDS X - TOILET SYS STATUS page on the MCDU.
(b) Make sure that the configuration of the vacuum system is as shown on the CIDS X - TOILET SYS STATUS page.
NOTE: Make sure that access panel 172AR is closed or push and hold limit switch 44MG during the test.
| ACTION | RESULT |
|---|---|
1.In all lavatories:
| In the vacuum toilet system:
|
2.In two lavatories:
| In the vacuum toilet system:
|
3.In a lavatory:
| In the vacuum toilet system and on the MCDU:
|
| 4.Make sure that access panel 172AR is closed or push and hold limit switch 44MG during the next tests. | In the vacuum toilet system and on the MCDU:
|
| | On the FAP:
|
5.At circuit breaker panel 2000VU or 2001VU:
| The FCU of that toilet is without electrical power. |
6.In the lavatory:
| In vacuum system:
|
| | On the FAP:
|
7.In a different lavatory:
| In the vacuum toilet system:
|
8.At circuit breaker panel 2000VU or 2001VU:
| On the FAP:
|
Subtask 38-31-00-080-051-A ** ON A/C NOT FOR ALL
A. Removal of the Test Equipment
(1) Bring the pressure on the altitude pressure switch 43MG back to ground level.
(2) Remove the pitot static tester and the adapter from the altitude pressure switch 43MG.
Subtask 38-31-00-860-051-A (1) Bring the pressure on the altitude pressure switch 43MG back to ground level.
(2) Remove the pitot static tester and the adapter from the altitude pressure switch 43MG.
B. Push the MCDU MENU mode key on the MCDU to return the system to the menu mode.
Subtask 38-31-00-613-060-A C. Servicing of the Toilet System
(1) Do the servicing of the toilet system (Ref. AMM TASK 12-16-38-613-001).
Subtask 38-31-00-410-051-A ** ON A/C NOT FOR ALL (1) Do the servicing of the toilet system (Ref. AMM TASK 12-16-38-613-001).
D. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access panels 312AR 172AR.
(3) Remove the access platform(s).
Subtask 38-31-00-410-051-C ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access panels 312AR 172AR.
(3) Remove the access platform(s).
D. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access panels 172AR.
(3) Remove the access platform(s).
Subtask 38-31-00-862-052-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access panels 172AR.
(3) Remove the access platform(s).
E. Put the aircraft back to its initial configuration.
(1) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
(1) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
Flush Cycle Schematic