Cleaning of the Toilet Waste Lines with Crushed Ice
TASK 38-31-00-100-005-A
Cleaning of the Toilet Waste Lines with Crushed Ice
Self explanatory
2. Job Set-up Information
A. Consumable Materials
B. Referenced Information
3. Job Set-up
Subtask 38-31-00-861-063-A Subtask 38-31-00-680-051-A
Subtask 38-31-00-100-051-A
(2) Put 1 l (0.2642 USgal) of vinegar (10% acetic acid solution) and/or Deodorant-Aircraft Toilets - - (Material No.11GCA1) into each toilet bowl.
(3) Let the toilet bowls soak for 10 minutes.
(6) After 30 minutes flush the toilet assemblies 3 times.
5. Close-up
Subtask 38-31-00-613-062-A Subtask 38-31-00-410-075-A
[Rev.10 from 2021]
2026.04.01 01:19:59 UTC
Cleaning of the Toilet Waste Lines with Crushed Ice
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.11GCA1) | Deodorant-Aircraft Toilets - - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| No specific | crushed ice |
| No specific | vinegar (10% acetic acid solution) |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-15-38-613-001-A | Fill the Potable Water Tank System (Aircraft Electrical Power Available) |
| TASK 12-16-38-613-001-A | Servicing of the Toilet System |
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 38-10-00-614-001-A | Pressurization of the Potable Water System from a Ground Air Supply |
Subtask 38-31-00-861-063-A Subtask 38-31-00-680-051-A
B. Aircraft Maintenance Configuration
(1) Do the servicing of the waste holding tank (Ref. AMM TASK 12-16-38-613-001).
(2) Make sure that the potable water system contains water and is pressurized (Ref. AMM TASK 12-15-38-613-001) and (Ref. AMM TASK 38-10-00-614-001).
Subtask 38-31-00-865-094-A (1) Do the servicing of the waste holding tank (Ref. AMM TASK 12-16-38-613-001).
(2) Make sure that the potable water system contains water and is pressurized (Ref. AMM TASK 12-15-38-613-001) and (Ref. AMM TASK 38-10-00-614-001).
C. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 38-31-00-010-077-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACUUM-SYS | 35MG | A06 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACUUM-GEN | 33MG | A08 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-E | 34MG | A04 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-D | 39MG | A03 |
| ** ON A/C ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-A | 32MG | A01 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACU-SYS | 35MG | A06 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACU-GEN | 33MG | A08 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-G | 34MG | A04 |
| 2001VU | VACU TOIL SYS-LAV PWR-F | 39MG | A03 |
| 2001VU | VACU TOIL SYS-LAV PWR-D | 45MG | A02 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-L | 45MG | A02 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-L | 23MG | A05 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-M | 34MG | A04 |
D. Get access to the lavatories.
4. ProcedureSubtask 38-31-00-100-051-A
WARNING:
ALWAYS WEAR RUBBER GLOVES, GOGGLES AND PROTECTIVE CLOTHES WHEN YOU DO THIS TASK.
A. Clean the Toilet Waste Lines NOTE: It is necessary to start the procedure at the most forward lavatory.
(1) Flush the toilet assembly. (2) Put 1 l (0.2642 USgal) of vinegar (10% acetic acid solution) and/or Deodorant-Aircraft Toilets - - (Material No.11GCA1) into each toilet bowl.
(3) Let the toilet bowls soak for 10 minutes.
NOTE: It is important not to ignore the cleaning agent soaking.
(4) Put 2 l (0.5 USgal) of crushed ice into the toilet assembly and flush the toilet immediately 2 times. NOTE: The ice must be crushed, ice cubes are not permitted.
(5) Do the procedure for all of the toilets. (6) After 30 minutes flush the toilet assemblies 3 times.
NOTE: It is necessary to start the procedure at the most forward lavatory.
Subtask 38-31-00-613-062-A Subtask 38-31-00-410-075-A
B. Close Access
(1) Dry the area around the toilet with Textile-Lint free Cotton - (Material No.14SBA1) .
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Close the lavatory door(s).
Subtask 38-31-00-862-063-A (1) Dry the area around the toilet with Textile-Lint free Cotton - (Material No.14SBA1) .
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Close the lavatory door(s).