Installation of the Wastewater Drain Lines
TASK 38-30-00-410-003-A
Installation of the Wastewater Drain Lines
1. Reason for the Job
Self Explanatory
2. Job Set-up Information
A. Referenced Information
3. Job Set-up
Subtask 38-30-00-860-055-A
Subtask 38-30-00-420-059-A
Subtask 38-30-00-410-057-A
[Rev.10 from 2021]
2026.04.02 06:25:47 UTC
Installation of the Wastewater Drain Lines
1. Reason for the Job
Self Explanatory
2. Job Set-up Information
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| TASK 20-28-00-912-802-A | Electrical Bonding - General Maintenance Procedure |
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 30-71-53-400-001-A | Installation of the Waste-Water De-icing Heater Elements |
| TASK 38-32-00-710-002-A | Operational Test of the Waste/Water Drain System |
Subtask 38-30-00-860-055-A
A. Aircraft Maintenance Configuration
(1) Make sure that the ground service network is energized from the external power (Ref. AMM TASK 24-42-00-861-001).
Subtask 38-30-00-560-052-A (1) Make sure that the ground service network is energized from the external power (Ref. AMM TASK 24-42-00-861-001).
B. Preparation of the Wastewater Drain lines for Installation
(1) Make sure that the parts retained from the removed component are clean and in the correct condition.
(2) Make sure that the bonding straps and strips are in a good condition.
(3) Install new bonding strips (16) in the clamps (17) if necessary.
(4) Example B.
(a) Loosely install the rubber sleeves (4) and the clamps (3) on one side of the drain lines (2) before you install them.
4. Procedure(1) Make sure that the parts retained from the removed component are clean and in the correct condition.
(2) Make sure that the bonding straps and strips are in a good condition.
(3) Install new bonding strips (16) in the clamps (17) if necessary.
(4) Example B.
(a) Loosely install the rubber sleeves (4) and the clamps (3) on one side of the drain lines (2) before you install them.
Subtask 38-30-00-420-059-A
A. Installation of the Wastewater Drain Lines
(1) Examples A, B, C, E, H, J and K.
(a) Put the wastewater drain lines (2) in position.
(2) Example D.
(a) Put the wastewater drain line (7) in position.
(3) Example J.
(a) Put the spacers (22) and the clamps (23) in position.
(b) Install the screws (19), the washers (18) and the nuts (15) but do not tighten them at this time.
(4) Example H.
(a) Put the spacers (22) and the clamps (23) in position.
(b) Put the clamps (21) in position.
(c) Install the screws (19), the bonding straps (20), the washers (18) and the nuts (15) but do not tighten them at this time.
(5) Example F.
(a) Put the clamps (17) in position.
(b) Install the washers (18), the screws (19) and the nuts (15) but do not tighten them at this time.
(6) Example G.
(a) Put the clamps (17) in position.
(b) Install the washers (18), the screws (19), the spacers (20) and the nuts (15) but do not tighten them at this time.
(7) Example E.
(a) Put the T-connector (8) in position.
(b) Install the washer (9) and the lock nut (10).
(c) Connect the connections (5).
(8) Example D.
(a) Connect the connection (5).
(9) Example C.
(a) Put the T-connector (6) in position.
(b) Connect the connections (5).
(10) Example B.
(a) Install the rubber sleeves (4) on the wastewater drain lines (2).
(b) Make sure that the gap between each section of the drain line is approximately 12 mm (0.472 in.) and that the red markings are in view.
(c) Install the clamps (3).
(11) Example K.
(a) Put the clamps (24) in position and the bonding straps (25) in position.
(b) Install the washers (18), the screws (19) and the nuts (15).
(c) Do the bonding procedure for the drain lines (Ref. AMM TASK 20-28-00-912-802).
(12) For examples F, G, H and J.
(a) Tighten the nuts (15) and the screws (19).
(13) Do the bonding of the drain lines (Ref. AMM TASK 20-28-00-912-802).
Subtask 38-30-00-860-056-A (1) Examples A, B, C, E, H, J and K.
(a) Put the wastewater drain lines (2) in position.
(2) Example D.
(a) Put the wastewater drain line (7) in position.
(3) Example J.
(a) Put the spacers (22) and the clamps (23) in position.
(b) Install the screws (19), the washers (18) and the nuts (15) but do not tighten them at this time.
(4) Example H.
(a) Put the spacers (22) and the clamps (23) in position.
(b) Put the clamps (21) in position.
(c) Install the screws (19), the bonding straps (20), the washers (18) and the nuts (15) but do not tighten them at this time.
(5) Example F.
(a) Put the clamps (17) in position.
(b) Install the washers (18), the screws (19) and the nuts (15) but do not tighten them at this time.
(6) Example G.
(a) Put the clamps (17) in position.
(b) Install the washers (18), the screws (19), the spacers (20) and the nuts (15) but do not tighten them at this time.
(7) Example E.
(a) Put the T-connector (8) in position.
(b) Install the washer (9) and the lock nut (10).
(c) Connect the connections (5).
(8) Example D.
(a) Connect the connection (5).
(9) Example C.
(a) Put the T-connector (6) in position.
(b) Connect the connections (5).
(10) Example B.
(a) Install the rubber sleeves (4) on the wastewater drain lines (2).
(b) Make sure that the gap between each section of the drain line is approximately 12 mm (0.472 in.) and that the red markings are in view.
(c) Install the clamps (3).
(11) Example K.
(a) Put the clamps (24) in position and the bonding straps (25) in position.
(b) Install the washers (18), the screws (19) and the nuts (15).
(c) Do the bonding procedure for the drain lines (Ref. AMM TASK 20-28-00-912-802).
(12) For examples F, G, H and J.
(a) Tighten the nuts (15) and the screws (19).
(13) Do the bonding of the drain lines (Ref. AMM TASK 20-28-00-912-802).
B. Preparation for Test
(1) Open the shutoff valve in the potable water system.
(2) Remove the warning notice(s).
Subtask 38-30-00-710-056-A 5. Close-up(1) Open the shutoff valve in the potable water system.
(2) Remove the warning notice(s).
Subtask 38-30-00-410-057-A
A. Close Access
(1) Example A.
(a) Install the insulation (1).
(2) Install the heater elements (Ref. AMM TASK 30-71-53-400-001).
(3) Make sure that the work area is clean and clear of tools and other items.
(4) Install the access panel(s) that you removed to get access to the wastewater drain lines.
(5) Close the access door(s).
(6) Remove the access platform(s).
Subtask 38-30-00-862-053-A (1) Example A.
(a) Install the insulation (1).
(2) Install the heater elements (Ref. AMM TASK 30-71-53-400-001).
(3) Make sure that the work area is clean and clear of tools and other items.
(4) Install the access panel(s) that you removed to get access to the wastewater drain lines.
(5) Close the access door(s).
(6) Remove the access platform(s).
Connections or the Wastewater Drain Lines