Installation of the Control Cable
TASK 38-14-48-400-001-A
Installation of the Control Cable
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 38-14-48-860-050-A ** ON A/C NOT FOR ALL
Subtask 38-14-48-560-050-A ** ON A/C NOT FOR ALL
Subtask 38-14-48-613-050-A ** ON A/C NOT FOR ALL Subtask 38-14-48-410-054-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:25:45 UTC
Installation of the Control Cable
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 1M(3 FT) |
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| No specific | 1 | ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE |
| No specific | 1 | ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE |
| No specific | AR | WARNING NOTICE(S) |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.03HBD9) | Synthetic Ester base Grease-General Purpose Low Temp - |
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| No specific | 0.8 mm lockwire |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 132PW, 171AL, 192NB, 825, 832, 842 |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 1 | COTTER PIN | AIPC 38-14-48-01-040 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-15-38-613-001-A | Fill the Potable Water Tank System (Aircraft Electrical Power Available) |
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 38-10-00-614-001-A | Pressurization of the Potable Water System from a Ground Air Supply |
| TASK 38-10-00-614-002-A | Depressurization of the Potable Water System |
| TASK 52-10-00-010-001-A | Opening of the Passenger/Crew Door |
| TASK 52-10-00-410-001-A | Closing of the Passenger/Crew Door |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 52-30-00-860-002-A | Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
Subtask 38-14-48-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the system potable water is depressurized (Ref. AMM TASK 38-10-00-614-002).
Subtask 38-14-48-010-054-A ** ON A/C NOT FOR ALL (1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the system potable water is depressurized (Ref. AMM TASK 38-10-00-614-002).
B. Get Access
(1) Make sure that the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE is in position in front of the applicable passenger/crew door 832 or 842.
(2) Make sure that the passenger/crew door 832 or 842 is open (Ref. AMM TASK 52-10-00-010-001).
(3) Make sure that the ACCESS PLATFORM 1M(3 FT) is in position at the drain and overflow panel 192NB.
(4) Make sure that the drain and overflow panel 192NB is open.
(5) Make sure that the WARNING NOTICE(S) is in position in the drain and overflow panel.
(6) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in position at the service panel 2023VU.
(7) Make sure that the access door 171AL of the service panel 2023VU is open.
(8) Make sure that the WARNING NOTICE(S) is in position in the service panel 2023VU.
(9) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position at the door 825.
(10) Make sure that the FWD cargo-compartment door 825 is open (Ref. AMM TASK 52-30-00-860-001).
(11) Make sure that the CARGO COMPT LIGHT switch 6LU is at ON.
(12) Make sure that in the FWD cargo-compartment, the partition panel 132PW is removed.
Subtask 38-14-48-865-051-A ** ON A/C NOT FOR ALL (1) Make sure that the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE is in position in front of the applicable passenger/crew door 832 or 842.
(2) Make sure that the passenger/crew door 832 or 842 is open (Ref. AMM TASK 52-10-00-010-001).
(3) Make sure that the ACCESS PLATFORM 1M(3 FT) is in position at the drain and overflow panel 192NB.
(4) Make sure that the drain and overflow panel 192NB is open.
(5) Make sure that the WARNING NOTICE(S) is in position in the drain and overflow panel.
(6) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in position at the service panel 2023VU.
(7) Make sure that the access door 171AL of the service panel 2023VU is open.
(8) Make sure that the WARNING NOTICE(S) is in position in the service panel 2023VU.
(9) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position at the door 825.
(10) Make sure that the FWD cargo-compartment door 825 is open (Ref. AMM TASK 52-30-00-860-001).
(11) Make sure that the CARGO COMPT LIGHT switch 6LU is at ON.
(12) Make sure that in the FWD cargo-compartment, the partition panel 132PW is removed.
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 124VU | SVCE/601PP/602PP/SPLY | 1PX | BB01 |
Subtask 38-14-48-560-050-A ** ON A/C NOT FOR ALL
A. Preparation for Installation
(1) Clean the cable (9) with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
(2) Apply Synthetic Ester base Grease-General Purpose Low Temp - (Material No.03HBD9) to the cable (9).
Subtask 38-14-48-420-050-A ** ON A/C NOT FOR ALL (1) Clean the cable (9) with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
(2) Apply Synthetic Ester base Grease-General Purpose Low Temp - (Material No.03HBD9) to the cable (9).
B. Installation of the Control Cable
(1) Do an inspection of the component interfaces and the adjacent area.
(2) Put the swivel ends (6) in position.
(3) Install the washers (7) and the nuts (8).
(4) Put the rigid sleeve (10) in position.
(5) Install the hollow hex head screws (11) in the swivel ends (6) but do not tighten at this stage.
(6) Install the cable (9) in the rigid sleeve (10).
(7) At the control handle lever:
(b) Put the clevis (12) in position until you can install the pin (3).
(c) Install the pin (3), the washer (2) and the AIPC 38-14-48-01-040 COTTER PIN (1) on the clevis (12).
(d) Tighten the locknut (13).
(e) If the locknut (13) has a hole, safety it with 0.8 mm lockwire.
(8) Tighten the hollow hex head screws (11) in the swivel ends (6).
(9) Install the sliding end (5) counterclockwise on the cable (9).
Subtask 38-14-48-820-050-A ** ON A/C NOT FOR ALL (1) Do an inspection of the component interfaces and the adjacent area.
(2) Put the swivel ends (6) in position.
(3) Install the washers (7) and the nuts (8).
(4) Put the rigid sleeve (10) in position.
(5) Install the hollow hex head screws (11) in the swivel ends (6) but do not tighten at this stage.
(6) Install the cable (9) in the rigid sleeve (10).
(7) At the control handle lever:
WARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
(a) Install the locknut (13) and the clevis (12) on the cable (9), but do not tighten at this stage. (b) Put the clevis (12) in position until you can install the pin (3).
(c) Install the pin (3), the washer (2) and the AIPC 38-14-48-01-040 COTTER PIN (1) on the clevis (12).
(d) Tighten the locknut (13).
(e) If the locknut (13) has a hole, safety it with 0.8 mm lockwire.
(8) Tighten the hollow hex head screws (11) in the swivel ends (6).
(9) Install the sliding end (5) counterclockwise on the cable (9).
C. Adjust the Control Cable
(1) Make sure that the overflow handle (drain handle) is in the closed position.
(2) Hold the lever of the overflow valve 8MP (drain valve 14MP) in the closed position.
(3) Adjust the sliding end (5) in position until you can install the pin (3).
(4) Make sure that you can feel or see the cable (9) through the inspection hole in the sliding end (5).
Subtask 38-14-48-420-052-A ** ON A/C NOT FOR ALL (1) Make sure that the overflow handle (drain handle) is in the closed position.
(2) Hold the lever of the overflow valve 8MP (drain valve 14MP) in the closed position.
(3) Adjust the sliding end (5) in position until you can install the pin (3).
(4) Make sure that you can feel or see the cable (9) through the inspection hole in the sliding end (5).
D. Installation of the Clevis to the Valve
(1) Install the pin (3), the washer (2) and the AIPC 38-14-48-01-040 COTTER PIN (1) on the sliding end (5).
(2) Tighten the nut (4).
Subtask 38-14-48-680-051-A ** ON A/C NOT FOR ALL Subtask 38-14-48-865-052-A ** ON A/C NOT FOR ALL (1) Install the pin (3), the washer (2) and the AIPC 38-14-48-01-040 COTTER PIN (1) on the sliding end (5).
(2) Tighten the nut (4).
NOTE: If removed put the insulation sleeve in position.
(3) If necessary fill the potable water tank (Ref. AMM TASK 12-15-38-613-001). F. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 38-14-48-720-050-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 124VU | SVCE/601PP/602PP/SPLY | 1PX | BB01 |
G. Do this Test
5. Close-up| ACTION | RESULT |
|---|---|
1.At the drain and overflow panel:
| In the potable water system:
|
| In the potable water system:
|
Subtask 38-14-48-613-050-A ** ON A/C NOT FOR ALL Subtask 38-14-48-410-054-A ** ON A/C NOT FOR ALL
B. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the passenger/crew door 832 or 842 (Ref. AMM TASK 52-10-00-410-001).
(3) Close the drain and overflow panel 192NB.
(4) Close the access door 171AL of the service panel 2023VU.
(5) In the FWD cargo-compartment, install the partition panel 132PW.
(6) Set the CARGO COMPT LIGHT switch 6LU to OFF.
(7) Close the FWD cargo-compartment door 825 (Ref. AMM TASK 52-30-00-860-002).
(8) Remove the WARNING NOTICE(S).
(9) Remove the access platform(s).
Subtask 38-14-48-862-050-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the passenger/crew door 832 or 842 (Ref. AMM TASK 52-10-00-410-001).
(3) Close the drain and overflow panel 192NB.
(4) Close the access door 171AL of the service panel 2023VU.
(5) In the FWD cargo-compartment, install the partition panel 132PW.
(6) Set the CARGO COMPT LIGHT switch 6LU to OFF.
(7) Close the FWD cargo-compartment door 825 (Ref. AMM TASK 52-30-00-860-002).
(8) Remove the WARNING NOTICE(S).
(9) Remove the access platform(s).
Control Cable - Component Location (3260MM, 3261MM)