W DOC AIRBUS | AMM A320F

Installation of the Fill/Drain Valve


TASK 38-14-46-400-001-A
Installation of the Fill/Drain Valve


FIN: 16MA ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
161DW, 162DW
 B. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
10
COTTER PIN
AIPC 38-14-49-01-170
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 12-15-38-613-001-A
Fill the Potable Water Tank System (Aircraft Electrical Power Available)
TASK 12-24-38-680-001-A
Draining of the Potable Water System (with Electrical Power)
TASK 20-23-38-400-003-A
Installation of the Tube Assembly of the Potable Water and the associated Air Supply System
TASK 20-28-00-912-802-A
Electrical Bonding - General Maintenance Procedure
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 38-10-00-614-001-A
Pressurization of the Potable Water System from a Ground Air Supply
TASK 38-10-00-670-805-A
Local Disinfection of the Potable-Water System Components
TASK 38-14-00-710-001-A
Operational Test of the Potable Water Drain-System
TASK 52-30-00-860-002-A
Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-004-A
Close the FWD or Aft Cargo-Compartment Door with the Hand Pump
3. Job Set-up
Subtask 38-14-46-860-051-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
   (2) Make sure that the potable water system is drained (Ref. AMM TASK 12-24-38-680-001).
Subtask 38-14-46-865-051-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2000VUWATER SYSTEM-QANT-IND1MAB01
** ON A/C NOT FOR ALL
2001VUWATER SYS-DRAIN1MPB05
** ON A/C NOT FOR ALL
2001VUWATER-SYS-DRAIN1MPB05
Subtask 38-14-46-560-050-A ** ON A/C NOT FOR ALL
C. Preparation for Installation
   (1) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (2) Clean and disinfect the component interface and/or the adjacent area (Ref. AMM TASK 38-10-00-670-805).
4. Procedure
Subtask 38-14-46-420-050-A ** ON A/C NOT FOR ALL
A. Installation of Fill/Drain Valve 16MA
   (1) Remove the blanking plugs and blanking caps.
   (2) Put fill/drain valve 16MA (2) in position and install the bolts (3), the washers (4) and the spacers (5) (Ref. AMM TASK 20-28-00-912-802).
   (3) Connect the pipes (1), (6) and (14) to fill/drain valve 16MA (2) (Ref. AMM TASK 20-23-38-400-003).
NOTE: Make sure that the pipes (1), (6) and (14) are installed without tension.
   (4) Put the control cable (12) in position.
   (5) Install the pin (13) with the washers (11).
   (6) Safety the pin (13) with the new AIPC 38-14-49-01-170 COTTER PIN (10).
CAUTION: MAKE SURE THAT THE ELECTRICAL CONNECTORS ARE CLEAN BEFORE YOU DISCONNECT OR CONNECT THEM. CONTAMINATION ON THE ELECTRICAL CONNECTORS CAN CAUSE DAMAGE TO EQUIPMENT.
   (7) Connect electrical connector 16MA-A (7).
Subtask 38-14-46-860-050-A ** ON A/C NOT FOR ALL
B. Preparation for Test
   (1) Fill the potable water system with 50 l (13.2085 USgal) water (
Ref. AMM TASK 12-15-38-613-001).
   (2) Pressurize the potable water system (Ref. AMM TASK 38-10-00-614-001) or (Ref. AMM D/O 38-10-00-61).
   (3) Examine fill/drain valve 16MA for leaks.
NOTE: Leaks are not permitted.
Subtask 38-14-46-865-052-A ** ON A/C NOT FOR ALL
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2000VUWATER SYSTEM-QANT-IND1MAB01
** ON A/C NOT FOR ALL
2001VUWATER SYS-DRAIN1MPB05
** ON A/C NOT FOR ALL
2001VUWATER-SYS-DRAIN1MPB05
Subtask 38-14-46-710-050-A ** ON A/C NOT FOR ALL
D. Do the operational test of the potable water drain-system (Ref. AMM TASK 38-14-00-710-001).
5. Close-up
Subtask 38-14-46-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install access panels 161DW and 162DW.
   (3) Install the insulation (8) and (9) around fill/drain valve 16MA.
F Fill/Drain Valve ** ON A/C NOT FOR ALL
CAUTION: MAKE SURE THAT THE INSULATION DOES NOT STOP THE OPERATION OF THE VALVE.
     (a) Close the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002) or (Ref. AMM TASK 52-30-00-860-004).
     (b) Remove the access platform(s).
Subtask 38-14-46-862-050-A ** ON A/C NOT FOR ALL
B. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
[Rev.10 from 2021] 2026.04.02 06:25:45 UTC