Installation of the Fill - Condition Limit - Switch
TASK 38-14-19-400-001-A
Installation of the Fill - Condition Limit - Switch
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 38-14-19-860-050-A ** ON A/C NOT FOR ALL
Subtask 38-14-19-420-050-A ** ON A/C NOT FOR ALL
Subtask 38-14-19-410-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:25:43 UTC
Installation of the Fill - Condition Limit - Switch
NOTE: The Fill-Condition Limit-Switch 5MP is refered to in the subsequent procedure as the Limit Switch 5MP.
FIN: 5MP ** ON A/C NOT FOR ALL
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | WARNING NOTICE(S) |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.14QDB1) | Wire-Locking Dia: 0.5 mm (0.020 inch) CRES Nickel Alloy - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 161DW, 171AL |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 25-55-12-000-001-A | Removal of the Aft Cargo-Compartment Partition at FR65 |
| TASK 25-55-12-400-001-A | Installation of the Aft Cargo-Compartment Partition at FR65 |
| TASK 38-14-00-710-001-A | Operational Test of the Potable Water Drain-System |
| TASK 38-14-00-820-001-A | Adjustment of the Limit Switches |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 52-30-00-860-002-A | Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
Subtask 38-14-19-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the AFT cargo-compartment door is open (Ref. AMM TASK 52-30-00-860-001).
(3) Make sure that the lights in the AFT cargo compartment, are set to the ON position.
(4) Make sure that the floor panel 161DW is removed (Ref. AMM TASK 25-55-12-000-001).
(5) Make sure that the access platforms are in position:
(7) Make sure that the WARNING NOTICE(S) is in position to tell persons:
Subtask 38-14-19-865-051-A ** ON A/C NOT FOR ALL (1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the AFT cargo-compartment door is open (Ref. AMM TASK 52-30-00-860-001).
(3) Make sure that the lights in the AFT cargo compartment, are set to the ON position.
(4) Make sure that the floor panel 161DW is removed (Ref. AMM TASK 25-55-12-000-001).
(5) Make sure that the access platforms are in position:
- Under the access door 171AL of the potable-water service-panel.
- At the AFT cargo-compartment door.
(7) Make sure that the WARNING NOTICE(S) is in position to tell persons:
- Not to do the servicing of the potable water system.
- Not to operate the control handle 3254MM at the potable-water service panel.
- That the draining system will not operate electrically.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2000VU | WATER SYSTEM-QANT-IND | 1MA | B01 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | WATER SYS-DRAIN | 1MP | B05 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | WATER-SYS-DRAIN | 1MP | B05 |
Subtask 38-14-19-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the Limit Switch 5MP
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Remove the nut (1) and the washer (2) from the new limit switch 5MP (5)
(4) Make sure that the O-ring (4) is installed on the limit switch.
(5) Put the limit switch 5MP (5) in position in the bracket (3).
(6) Install the stainless steel lockwire14QDB1 Wire-Locking Dia: 0.5 mm (0.020 inch) CRES Nickel Alloy - in the hole of the washer (2).
(7) Install the washer (2) and the nut (1).
14QDB1 Wire-Locking Dia: 0.5 mm (0.020 inch) CRES Nickel Alloy - from the washer (2).
(9) Pull the control handle (3254MM) out 30.0 +2 mm or -2 mm (1.1811 +0.0787 in. or -0.0787 in.) and listen for the limit switch 5MP to klick, if necessary adjust the switch (Ref. AMM TASK 38-14-00-820-001).
(10) Remove the CAP-BLANKING from each electrical connector and receptacle.
(11) Make sure that all the electrical connections are clean and in the correct condition.
(12) Connect the electrical connector 5MP-A (6).
Subtask 38-14-19-865-052-A ** ON A/C NOT FOR ALL (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Remove the nut (1) and the washer (2) from the new limit switch 5MP (5)
(4) Make sure that the O-ring (4) is installed on the limit switch.
(5) Put the limit switch 5MP (5) in position in the bracket (3).
(6) Install the stainless steel lockwire
(7) Install the washer (2) and the nut (1).
NOTE: The axis of the limit switch 5MP (5) must align with the pulley of the control handle (3254MM).
(8) Safety the nut (1) with the stainless steel lockwire (9) Pull the control handle (3254MM) out 30.0 +2 mm or -2 mm (1.1811 +0.0787 in. or -0.0787 in.) and listen for the limit switch 5MP to klick, if necessary adjust the switch (Ref. AMM TASK 38-14-00-820-001).
(10) Remove the CAP-BLANKING from each electrical connector and receptacle.
(11) Make sure that all the electrical connections are clean and in the correct condition.
(12) Connect the electrical connector 5MP-A (6).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 38-14-19-710-050-A ** ON A/C NOT FOR ALL 5. Close-up| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2000VU | WATER SYSTEM-QANT-IND | 1MA | B01 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | WATER SYS-DRAIN | 1MP | B05 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | WATER-SYS-DRAIN | 1MP | B05 |
Subtask 38-14-19-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the floor-panel 161DW (Ref. AMM TASK 25-55-12-400-001).
(3) In the AFT cargo compartment, on the control panel 5024VE set the light switch 30LU to the OFF position.
(4) Remove the access platform(s).
(5) Close the AFT cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
(6) Close the access door 171AL.
(8) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Subtask 38-14-19-862-050-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the floor-panel 161DW (Ref. AMM TASK 25-55-12-400-001).
(3) In the AFT cargo compartment, on the control panel 5024VE set the light switch 30LU to the OFF position.
(4) Remove the access platform(s).
(5) Close the AFT cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
(6) Close the access door 171AL.
NOTE: Make sure that the latches are correctly locked and that the door makes a continuous surface with the skin of the aircraft.
(7) Remove the access platform(s).(8) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Fill Condition Limit Switch