W DOC AIRBUS | AMM A320F

Adjustment of the Drain Limit Switch


TASK 38-14-00-820-002-A
Adjustment of the Drain Limit Switch


ZONE: 160
ZONE: 170
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
160
BULK CARGO COMPARTMENT AFT BULKHEAD OF AFT CARGO COMPARTMENT TO AFT BULKHEAD OF BULK CARGO COMPARTMENT
170
AFT CAB U/FLOOR COMPT AFT BHD OF BULK
161DW, 171AL
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 12-16-38-613-001-A
Servicing of the Toilet System
TASK 12-24-38-680-001-A
Draining of the Potable Water System (with Electrical Power)
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 25-55-12-000-001-A
Removal of the Aft Cargo-Compartment Partition at FR65
TASK 25-55-12-400-001-A
Installation of the Aft Cargo-Compartment Partition at FR65
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-002-A
Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-003-A
Open the FWD or Aft Cargo-Compartment Door with the Hand Pump
TASK 52-30-00-860-004-A
Close the FWD or Aft Cargo-Compartment Door with the Hand Pump
3. Job Set-up
Subtask 38-14-00-861-058-A ** ON A/C NOT FOR ALL
A. Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 38-14-00-010-065-A ** ON A/C NOT FOR ALL
B. Get Access
   (1) Open the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-001) or (Ref. AMM TASK 52-30-00-860-003).
   (2) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position below the aft cargo-compartment door.
   (3) Set CARGO COMPT LIGHT switch 8LU to ON.
   (4) Remove partition 161DW (Ref. AMM TASK 25-55-12-000-001).
   (5) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position below the Potable Water Service Panel (PWSP).
   (6) Open access door 171AL of the PWSP.
Subtask 38-14-00-680-057-A ** ON A/C NOT FOR ALL
C. Drain the potable water system (Ref. AMM TASK 12-24-38-680-001).
Subtask 38-14-00-865-080-A ** ON A/C NOT FOR ALL
D. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2001VUWATER SYS-QUANT-IND1MAB06
2001VUWATER SYS-DRAIN1MPB05
4. Procedure
Subtask 38-14-00-820-051-A ** ON A/C NOT FOR ALL
A. Adjustment of the Limit Switch 3MP
   (1) Adjust the drain limit switch 3MP.
     (a) Turn the fill/drain and overflow handle (3254MM) to the right and pull it out 31.0 +2 mm or -2 mm (1.2205 +0.0787 in. or -0.0787 in.)
F Drain Limit-Switch 3MP Adjustment ** ON A/C NOT FOR ALL
DIMENSION A.
NOTE: You must hold the fill/drain and overflow handle in this position to do the adjustment.
     (b) Loosen the bolts (2) on the bracket of the switch.
     (c) Move the switch assembly in the direction of the control cam (1) until you hear a click.
     (d) Tighten the bolts (2).
     (e) Make sure that the switch 3MP is aligned with the control cam (1).
     (f) Release the fill/drain and overflow handle to the Normal position.
     (g) Make sure that Dimension B has a minimum clearance of 2.0 +1 mm or -0 mm (0.0787 +0.0394 in. or +0.0000 in.) between the outer end of the switch and the spring (3).
Subtask 38-14-00-865-081-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2001VUWATER SYS-QUANT-IND1MAB06
2001VUWATER SYS-DRAIN1MPB05
Subtask 38-14-00-720-051-B ** ON A/C NOT FOR ALL
C. Functional Test
   (1) Do this test.
ACTION
RESULT
1.At the service panel 2023VU:
  • operate the fill/drain and overflow handle from the normal to the drain position.
In the potable water system:
  • the lever of the fill/drain and overflow valve 8MA moves from the closed to the open position.
  • the limit switch 3MP is energized.
  • the motorised drain valve 4MP opens.
  • the control light 2MP comes on.
2.At the service panel 2023VU:
  • operate the fill/drain and overflow handle from the drain to the normal position.
In the potable water system:
  • the lever of the fill/drain and overflow valve 8MA moves from the open to the closed position.
  • the limit switch 3MP is de-energized.
  • the motorised drain valve 4MP closes.
  • the control light 2MP goes off.
5. Close-up
Subtask 38-14-00-613-053-A ** ON A/C NOT FOR ALL
A. Do the servicing of the potable water system (Ref. AMM TASK 12-16-38-613-001).
Subtask 38-14-00-410-063-A ** ON A/C NOT FOR ALL
B. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close access door 171AL of the PWSP.
   (3) Install partition 161DW (Ref. AMM TASK 25-55-12-400-001).
   (4) Set CARGO COMPT LIGHT switch 8LU to OFF.
   (5) Remove the access platform(s).
   (6) Close the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002) or (Ref. AMM TASK 52-30-00-860-004).
   (7) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Subtask 38-14-00-862-059-A ** ON A/C NOT FOR ALL
C. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).