Installation of the Preselection Control Unit
TASK 38-13-34-400-001-A
Installation of the Preselection Control Unit
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 38-13-34-860-050-A ** ON A/C NOT FOR ALL
Subtask 38-13-34-420-050-A ** ON A/C NOT FOR ALL
Subtask 38-13-34-410-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:25:42 UTC
Installation of the Preselection Control Unit
FIN: 7MA ** ON A/C NOT FOR ALL
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 162CW |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 20-28-00-912-802-A | Electrical Bonding - General Maintenance Procedure |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 38-13-00-710-001-A | Operational Test of the Quantity Indicating System |
| TASK 52-30-00-860-002-A | Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
Subtask 38-13-34-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the electrical circuits are energized
Subtask 38-13-34-865-051-A ** ON A/C NOT FOR ALL (1) Make sure that the electrical circuits are energized
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2001VU | WATER SYS-QUANT-IND | 1MA | B06 |
Subtask 38-13-34-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the Preselection Control Unit
(1) Do an inspection of the component interfaces and the adjacent area.
(2) Put the preselection control unit (1) 7MA in position and install the washers (3) and the screws (2) (Ref. AMM TASK 20-28-00-912-802).
(3) Remove the blanking caps.
(4) Connect the electrical connector (4) 7MA-A.
Subtask 38-13-34-865-052-A ** ON A/C NOT FOR ALL (1) Do an inspection of the component interfaces and the adjacent area.
(2) Put the preselection control unit (1) 7MA in position and install the washers (3) and the screws (2) (Ref. AMM TASK 20-28-00-912-802).
(3) Remove the blanking caps.
(4) Connect the electrical connector (4) 7MA-A.
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 38-13-34-710-050-A ** ON A/C NOT FOR ALL 5. Close-up| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2001VU | WATER SYS-QUANT-IND | 1MA | B06 |
Subtask 38-13-34-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panel 162CW.
(3) Close the AFT cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
Subtask 38-13-34-862-050-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panel 162CW.
(3) Close the AFT cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
Preselection Control Unit 7MA