Operational Test of the Door Limit Switch
TASK 38-13-00-710-002-A
Operational Test of the Door Limit Switch
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 38-13-00-861-051-A Subtask 38-13-00-865-051-A
Subtask 38-13-00-710-051-B ** ON A/C NOT FOR ALL
Subtask 38-13-00-410-051-A
[Rev.10 from 2021]
2026.04.02 07:19:15 UTC
Operational Test of the Door Limit Switch
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 171AL |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-24-38-680-001-A | Draining of the Potable Water System (with Electrical Power) |
| TASK 12-24-38-680-002-A | Draining of the Potable Water System (without Electrical Power) |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
Subtask 38-13-00-861-051-A Subtask 38-13-00-865-051-A
B. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 38-13-00-010-051-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2000VU | WATER SYSTEM-QANT-IND | 1MA | B01 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | WATER SYS-QUANT-IND | 1MA | B06 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | WATER SYS-DRAIN | 1MP | B05 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | WATER-SYS-DRAIN | 1MP | B05 |
C. Get Access
(1) Put an ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position below the potable-water service panel.
(2) Open potable-water service door 171AL.
Subtask 38-13-00-680-050-A (1) Put an ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position below the potable-water service panel.
(2) Open potable-water service door 171AL.
D. If necessary, drain the potable water system (Ref. AMM TASK 12-24-38-680-001) or (Ref. AMM TASK 12-24-38-680-002).
4. ProcedureNOTE: The potable water system must be empty for the subsequent test.
Subtask 38-13-00-710-051-B ** ON A/C NOT FOR ALL
A. Operational Test of the Water Service-Panel Door-Switch 5MA
Subtask 38-13-00-710-051-C ** ON A/C NOT FOR ALL | ACTION | RESULT |
|---|---|
1.At the potable-water service panel:
| At the potable-water service panel:
|
|
|
|
|
|
|
2.At the potable-water service panel:
| On Forward Attendant Panel (FAP) 120RH/miscellaneous panel WATER AND WASTE 124RH:
|
At FAP 120RH/miscellaneous panel WATER AND WASTE 124RH:
|
|
At the potable-water service panel:
|
|
A. Operational Test of Water Service-Panel Door Switch 5MA
5. Close-up| ACTION | RESULT |
|---|---|
1.At the potable-water service panel:
| At the potable-water service panel:
|
|
|
|
|
|
|
| 2.At the potable-water service panel: | At Flight Attendant Panel (FAP) 120RH: |
|
|
|
|
Subtask 38-13-00-410-051-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close potable-water service door 171AL.
Subtask 38-13-00-862-051-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close potable-water service door 171AL.
NOTE: Make sure that the latches are correctly locked and that the door makes a continuous surface with the skin of the aircraft.
(3) Remove the access platform(s).