Operational Test of the Electronic Water Faucet
TASK 38-12-41-710-001-A
Operational Test of the Electronic Water Faucet
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 38-12-41-861-054-A ** ON A/C NOT FOR ALL Subtask 38-12-41-860-059-A ** ON A/C NOT FOR ALL
Subtask 38-12-41-710-051-A ** ON A/C NOT FOR ALL
Subtask 38-12-41-410-059-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:25:40 UTC
Operational Test of the Electronic Water Faucet
ZONE: 200
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 200 | UPPER HALF FUSELAGE |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-15-38-613-001-A | Fill the Potable Water Tank System (Aircraft Electrical Power Available) |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 38-10-00-614-001-A | Pressurization of the Potable Water System from a Ground Air Supply |
Subtask 38-12-41-861-054-A ** ON A/C NOT FOR ALL Subtask 38-12-41-860-059-A ** ON A/C NOT FOR ALL
B. Preparation for Test
(1) Make sure that the potable water system is serviceable, if necessary do the servicing (Ref. AMM TASK 12-15-38-613-001).
(2) Make sure that the potable water-shutoff valves in the lavatories are open.
(3) Make sure that the power switch on the electronic control box is in the ON position, and the green control light is ON.
Subtask 38-12-41-865-056-A ** ON A/C NOT FOR ALL (1) Make sure that the potable water system is serviceable, if necessary do the servicing (Ref. AMM TASK 12-15-38-613-001).
(2) Make sure that the potable water-shutoff valves in the lavatories are open.
(3) Make sure that the power switch on the electronic control box is in the ON position, and the green control light is ON.
C. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 38-12-41-614-053-A ** ON A/C NOT FOR ALL 4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-M | 34MG | A04 |
| 2001VU | VACU TOIL SYS-LAV PWR-D | 39MG | A03 |
| 2001VU | VACU TOIL SYS-LAV PWR-L | 45MG | A02 |
| 2001VU | VACU TOIL SYS-LAV PWR-A | 32MG | A01 |
Subtask 38-12-41-710-051-A ** ON A/C NOT FOR ALL
A. Test
5. Close-upNOTE: The water flows from the electronic water faucet in the washbasin after the activation of the infrared sensor, and stops after the deactivation of the infrared sensor. Then, the water flows again from the electronic water faucet in the washbasin without the activation of the infrared sensor. This rinse cycle procedure is automatic and is used to clean the washbasin after the operation of the electronic water faucet.
| ACTION | RESULT |
|---|---|
1.In the lavatory:
| In the lavatory:
NOTE: The water will flow from the electronic water faucet as long as the standard target is put in front of the infrared sensor. |
2.In the lavatory:
| In the lavatory:
|
3.In the Lavatory:
| In the lavatory:
|
4.In the lavatory:
| In the lavatory:
|
5.In the lavatory:
| In the lavatory:
|
Subtask 38-12-41-410-059-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
Subtask 38-12-41-862-054-A ** ON A/C NOT FOR ALL Subtask 38-12-41-942-050-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
C. Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Target Set Up for Test of Infrared Sensors