Installation of the Electronic Control Box
TASK 38-12-41-400-005-A
Installation of the Electronic Control Box
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Referenced Information
3. Job Set-up
Subtask 38-12-41-860-058-A ** ON A/C NOT FOR ALL
Subtask 38-12-41-420-054-A ** ON A/C NOT FOR ALL
Subtask 38-12-41-865-072-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:25:40 UTC
Installation of the Electronic Control Box
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 38-10-00-614-002-A | Depressurization of the Potable Water System |
| TASK 38-12-41-710-001-A | Operational Test of the Electronic Water Faucet |
Subtask 38-12-41-860-058-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the ground service network is energized from the external power (Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the potable water system is depressurized (Ref. AMM TASK 38-10-00-614-002).
Subtask 38-12-41-865-055-A ** ON A/C NOT FOR ALL (1) Make sure that the ground service network is energized from the external power (Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the potable water system is depressurized (Ref. AMM TASK 38-10-00-614-002).
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-M | 34MG | A04 |
| 2001VU | VACU TOIL SYS-LAV PWR-D | 39MG | A03 |
| 2001VU | VACU TOIL SYS-LAV PWR-L | 45MG | A02 |
| 2001VU | VACU TOIL SYS-LAV PWR-A | 32MG | A01 |
Subtask 38-12-41-420-054-A ** ON A/C NOT FOR ALL
A. Installation of the Electronic Control Box
(1) Put the electronic box (1) in position.
(2) Install the washers (2) and the screws (3).
(3) Remove the PLUG-BLANKING from each disconnected line end.
(4) Connect the electrical connectors (4), (5), (6) and (7).
(5) Make sure that all the electrical connections are clean and in the correct condition.
5. Close-up(1) Put the electronic box (1) in position.
(2) Install the washers (2) and the screws (3).
(3) Remove the PLUG-BLANKING from each disconnected line end.
(4) Connect the electrical connectors (4), (5), (6) and (7).
(5) Make sure that all the electrical connections are clean and in the correct condition.
Subtask 38-12-41-865-072-A ** ON A/C NOT FOR ALL
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 38-12-41-710-050-A ** ON A/C NOT FOR ALL Subtask 38-12-41-410-058-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-M | 34MG | A04 |
| 2001VU | VACU TOIL SYS-LAV PWR-D | 39MG | A03 |
| 2001VU | VACU TOIL SYS-LAV PWR-L | 45MG | A02 |
| 2001VU | VACU TOIL SYS-LAV PWR-A | 32MG | A01 |
C. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Subtask 38-12-41-862-053-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Electronic Control Box