W DOC AIRBUS | AMM A320F

Removal of the Nozzle Assembly


TASK 38-12-41-000-006-A
Removal of the Nozzle Assembly


ZONE: 200
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
CONTAINER 10 L(2 1/2 USGAL)
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
AR
WARNING NOTICE(S)
9010020380AIR
1
KEY SPECIAL
T6036
1
AERATOR TOOL
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
200
UPPER HALF FUSELAGE
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
F Nozzle Assembly ** ON A/C NOT FOR ALL
F Nozzle Assembly ** ON A/C NOT FOR ALL
F Nozzle Assembly ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 38-12-41-861-055-A
A. Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 38-12-41-010-058-A
B. Get Access
   (1) Install the hoses on drain masts 4DU and 14DU.
   (2) Put the CONTAINER 10 L(2 1/2 USGAL) below drain masts 4DU and 14DU.
   (3) Put the end of the hoses into the CONTAINER 10 L(2 1/2 USGAL).
   (4) In the lavatory, turn the potable-water shutoff valve to the CLOSED position.
   (5) In the lavatory, operate the water faucet until no more water flows into the washbasin.
Subtask 38-12-41-865-063-A
C. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2001VUVACU TOIL SYS-LAV PWR-E34MGA04
** ON A/C NOT FOR ALL
2001VUVACU TOIL SYS-LAV PWR-D39MGA03
** ON A/C ALL
2001VUVACU TOIL SYS-LAV PWR-A32MGA01
** ON A/C NOT FOR ALL
2001VUVACU TOIL SYS-LAV PWR-G34MGA04
2001VUVACU TOIL SYS-LAV PWR-F39MGA03
2001VUVACU TOIL SYS-LAV PWR-D45MGA02
** ON A/C NOT FOR ALL
2001VUVACU TOIL SYS-LAV PWR-L45MGA02
** ON A/C NOT FOR ALL
2001VUVACU TOIL SYS-LAV PWR-M34MGA04
Subtask 38-12-41-941-050-A
D. Safety Precautions
   (1) Put the WARNING NOTICE(S) in position to tell persons not to use the toilet(s) or open the potable-water shutoff valve(s).
4. Procedure
Subtask 38-12-41-020-055-A ** ON A/C NOT FOR ALL
A. Removal of the Nozzle Assembly
NOTE: The procedure for the removal of the nozzle assembly is the same for all the lavatories.
   (1) Make marks on items, before you disassemble them, to prevent errors when you assemble them.
   (2) Use the 9010020380AIR KEY SPECIAL (4) to remove the nozzle assembly (5) from the water-faucet outlet (1).
   (3) Remove the washer (2) from the nozzle (3).
Subtask 38-12-41-020-055-B ** ON A/C NOT FOR ALL
A. Removal of the Nozzle Assembly
NOTE: This procedure for the removal of the nozzle assembly is the same for all of the lavatories which have the electronic water faucet.
   (1) Make match marks on the items.
NOTE: To prevent errors on assembly, it is necessary to mark the parts before the disassembly of them.
   (2) Use the T6036 AERATOR TOOL to remove the nozzle assembly (5) from the water-faucet outlet (4).
   (3) Remove the washer (3) and the flow control insert (2) from the nozzle (1).
[Rev.10 from 2021] 2026.04.02 06:25:40 UTC