W DOC AIRBUS | AMM A320F

Removal of a Potable Water-Shutoff Valve


TASK 38-12-14-000-001-A
Removal of a Potable Water-Shutoff Valve


NOTE: The removal of the shutoff valve is the same in all the lavatories.
ZONE: 200
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
CONTAINER 1 L (1/4 USGAL)
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
200
UPPER HALF FUSELAGE
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 25-45-22-000-001-A
Removal of the Toilet Shroud and the Seat
TASK 38-10-00-614-002-A
Depressurization of the Potable Water System
3. Job Set-up
Subtask 38-12-14-861-050-A
A. Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
Subtask 38-12-14-614-051-A
B. Depressurize the potable water system (Ref. AMM TASK 38-10-00-614-002).
Subtask 38-12-14-865-053-A
C. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2000VUWATER SYSTEM-QANT-IND1MAB01
** ON A/C NOT FOR ALL
2001VUWATER SYS-QUANT-IND1MAB06
** ON A/C NOT FOR ALL
2001VUWATER SYS-DRAIN1MPB05
** ON A/C NOT FOR ALL
2001VUWATER-SYS-DRAIN1MPB05
Subtask 38-12-14-010-051-C
D. Get Access
   (1) Get access to the passenger cabin.
   (2) Open the door of the lavatory.
   (3) Open the sanitary cabinet door.
   (4) Remove the toilet shroud (Ref. AMM TASK 25-45-22-000-001)
   (5) Put a CONTAINER 1 L (1/4 USGAL) below the shutoff valve (12).
4. Procedure
Subtask 38-12-14-020-050-C
A. Removal of the Shutoff Valve (12)
   (1) Disconnect the pipe connections (8).
   (2) Remove the counter sink screws (4) and the counter sink washers (5).
   (3) Remove the shutoff valve (12) together with the bracket (9).
   (4) If necessary remove the bolts (11) the washers (10) and the bracket (9) from the shutoff valve (12).
   (5) If necessary remove the control rod (2)
     (a) Remove the nuts (13) the washers (14) and the counter sink screws (1).
     (b) remove the control rod (2) together with the brackets (3) and (6).
[Rev.10 from 2021] 2026.04.02 06:25:39 UTC