Adjustment of the Water Flow Time of the Electronic Water Faucet
TASK 38-12-00-820-002-A
Adjustment of the Water Flow Time of the Electronic Water Faucet
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 38-12-00-861-058-A ** ON A/C NOT FOR ALL Subtask 38-12-00-010-059-A ** ON A/C NOT FOR ALL
Subtask 38-12-00-820-051-A ** ON A/C NOT FOR ALL
Subtask 38-12-00-614-060-A ** ON A/C NOT FOR ALL Subtask 38-12-00-410-061-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:25:38 UTC
Adjustment of the Water Flow Time of the Electronic Water Faucet
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | FLASHLIGHT |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | 1 | SCREWDRIVER - SMALL |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 38-10-00-614-001-A | Pressurization of the Potable Water System from a Ground Air Supply |
| TASK 38-10-00-614-002-A | Depressurization of the Potable Water System |
| TASK 38-12-41-710-001-A | Operational Test of the Electronic Water Faucet |
Subtask 38-12-00-861-058-A ** ON A/C NOT FOR ALL Subtask 38-12-00-010-059-A ** ON A/C NOT FOR ALL
B. Get Access
(1) Open the sanitary cabinet door under the washbasin.
(2) Make sure that the potable water shutoff-valve in the lavatory is open.
Subtask 38-12-00-865-066-A ** ON A/C NOT FOR ALL (1) Open the sanitary cabinet door under the washbasin.
(2) Make sure that the potable water shutoff-valve in the lavatory is open.
C. Open, safety and tag this(these) circuit breaker(s):
Subtask 38-12-00-614-058-A ** ON A/C NOT FOR ALL 4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2000VU | LAV FWD-HOT WATER-A | 1MB | F02 |
| 2001VU | LAV AFT-HOT WATER-M | 9MB | B03 |
| 2001VU | LAV AFT-HOT WATER-D/L | 2MB | B02 |
Subtask 38-12-00-820-051-A ** ON A/C NOT FOR ALL
A. Adjustment of the water flow time (at the electrical control box)
(2) Remove the cover plate (2) from the electrical control box (1).
(3) Set the power switch on the electrical control box (1) to the ON position.
(4) Use a FLASHLIGHT to make sure that you can see the potentiometer R13 (4).
(5) Carefully put a SCREWDRIVER - SMALL in position on the potentiometer R13 (4). Adjust the sensitivity (water flow time) as necessary.
(6) Do the operational test (Ref. AMM TASK 38-12-41-710-001).
(7) Put the cover plate (2) of the electrical control box (1) in position.
(8) Tighten the screws (3).
Subtask 38-12-00-865-067-A ** ON A/C NOT FOR ALL NOTE: Make sure that dirt or water do not come into the electrical control box.
(1) Loosen the screws (3). (2) Remove the cover plate (2) from the electrical control box (1).
(3) Set the power switch on the electrical control box (1) to the ON position.
(4) Use a FLASHLIGHT to make sure that you can see the potentiometer R13 (4).
(5) Carefully put a SCREWDRIVER - SMALL in position on the potentiometer R13 (4). Adjust the sensitivity (water flow time) as necessary.
(6) Do the operational test (Ref. AMM TASK 38-12-41-710-001).
(7) Put the cover plate (2) of the electrical control box (1) in position.
(8) Tighten the screws (3).
B. Make sure that this(these) circuit breaker(s) is(are) closed:
5. Close-up| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2000VU | LAV FWD-HOT WATER-A | 1MB | F02 |
| 2001VU | LAV AFT-HOT WATER-M | 9MB | B03 |
| 2001VU | LAV AFT-HOT WATER-D/L | 2MB | B02 |
Subtask 38-12-00-614-060-A ** ON A/C NOT FOR ALL Subtask 38-12-00-410-061-A ** ON A/C NOT FOR ALL
B. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the sanitary cabinet door.
Subtask 38-12-00-862-059-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the sanitary cabinet door.
Adjustment of the Water Flow Time