General Visual Inspection of the Potable Water Tank
TASK 38-11-41-200-001-A
General Visual Inspection of the Potable Water Tank
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 38-11-41-861-051-A Subtask 38-11-41-010-052-A ** ON A/C NOT FOR ALL
Subtask 38-11-41-210-050-A
Subtask 38-11-41-614-051-A Subtask 38-11-41-410-054-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:25:38 UTC
General Visual Inspection of the Potable Water Tank
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 2M (6 FT) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 138 | BAY BETW AFT PART. BULKHEAD OF FWD CARGO |
| 161DW, 162DW | |
| 131NW, 132PW |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 25-54-12-000-001-A | Removal of the Forward Cargo-Compartment Partition |
| TASK 25-54-12-400-001-A | Installation of the Forward Cargo-Compartment Partition |
| TASK 25-55-12-000-001-A | Removal of the Aft Cargo-Compartment Partition at FR65 |
| TASK 25-55-12-400-001-A | Installation of the Aft Cargo-Compartment Partition at FR65 |
| TASK 38-10-00-614-001-A | Pressurization of the Potable Water System from a Ground Air Supply |
| TASK 38-10-00-614-002-A | Depressurization of the Potable Water System |
| TASK 38-10-00-614-003-A | Pressurization of the Potable Water System with the Compressor |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 52-30-00-860-002-A | Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 52-30-00-860-003-A | Open the FWD or Aft Cargo-Compartment Door with the Hand Pump |
| TASK 52-30-00-860-004-A | Close the FWD or Aft Cargo-Compartment Door with the Hand Pump |
Subtask 38-11-41-861-051-A Subtask 38-11-41-010-052-A ** ON A/C NOT FOR ALL
B. Get Access
(1) Open the forward cargo-compartment door (Ref. AMM TASK 52-30-00-860-001) or (Ref. AMM TASK 52-30-00-860-003).
(2) Put an ACCESS PLATFORM 2M (6 FT) in position.
(3) Set cargo-compartment light switch 6LU to on.
(4) Remove partitions 131NW and 132PW (Ref. AMM TASK 25-54-12-000-001).
(5) Remove the insulation from the tank.
Subtask 38-11-41-010-052-C ** ON A/C NOT FOR ALL (1) Open the forward cargo-compartment door (Ref. AMM TASK 52-30-00-860-001) or (Ref. AMM TASK 52-30-00-860-003).
(2) Put an ACCESS PLATFORM 2M (6 FT) in position.
(3) Set cargo-compartment light switch 6LU to on.
(4) Remove partitions 131NW and 132PW (Ref. AMM TASK 25-54-12-000-001).
(5) Remove the insulation from the tank.
B. Get Access
(1) Open the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-001) or (Ref. AMM TASK 52-30-00-860-003).
(2) Put an ACCESS PLATFORM 2M (6 FT) below the aft cargo-compartment door.
(3) Remove partitions 161DW and 162DW (Ref. AMM TASK 25-55-12-000-001).
(4) Remove the insulation around the tank.
Subtask 38-11-41-614-050-A (1) Open the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-001) or (Ref. AMM TASK 52-30-00-860-003).
(2) Put an ACCESS PLATFORM 2M (6 FT) below the aft cargo-compartment door.
(3) Remove partitions 161DW and 162DW (Ref. AMM TASK 25-55-12-000-001).
(4) Remove the insulation around the tank.
C. Pressurize the potable water system (Ref. AMM TASK 38-10-00-614-001) or (Ref. AMM TASK 38-10-00-614-003).
4. ProcedureSubtask 38-11-41-210-050-A
A. Make a visual inspection of the potable water tank and make sure that:
5. Close-up- There are no cracks, leaks or damage
- The distribution pipes are in good condition
- The area around the tank is free of corrosion and is in a good condition.
Subtask 38-11-41-614-051-A Subtask 38-11-41-410-054-A ** ON A/C NOT FOR ALL
B. Close Access
(1) Install the insulation around the tank.
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Install partitions 131NW and 132PW (Ref. AMM TASK 25-54-12-400-001).
(4) Set cargo-compartment light switch 6LU to off.
(5) Remove the access platform(s).
(6) Close the forward cargo-compartment door (Ref. AMM TASK 52-30-00-860-002) or (Ref. AMM TASK 52-30-00-860-004).
Subtask 38-11-41-410-054-C ** ON A/C NOT FOR ALL (1) Install the insulation around the tank.
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Install partitions 131NW and 132PW (Ref. AMM TASK 25-54-12-400-001).
(4) Set cargo-compartment light switch 6LU to off.
(5) Remove the access platform(s).
(6) Close the forward cargo-compartment door (Ref. AMM TASK 52-30-00-860-002) or (Ref. AMM TASK 52-30-00-860-004).
B. Close Access
(1) Install insulation around the tank.
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Install partitions 161DW and 162DW (Ref. AMM TASK 25-55-12-400-001).
(4) Remove the access platform(s).
(5) Close the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002) or (Ref. AMM TASK 52-30-00-860-004).
Subtask 38-11-41-862-052-A (1) Install insulation around the tank.
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Install partitions 161DW and 162DW (Ref. AMM TASK 25-55-12-400-001).
(4) Remove the access platform(s).
(5) Close the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002) or (Ref. AMM TASK 52-30-00-860-004).