Removal of the Interconnecting Cables
TASK 36-22-18-000-802-A
Removal of the Interconnecting Cables
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 36-22-18-861-051-A ** ON A/C NOT FOR ALL Subtask 36-22-18-860-053-A ** ON A/C NOT FOR ALL
Subtask 36-22-18-020-052-A ** ON A/C NOT FOR ALL
(2) Discard the lockwires.
(3) Loosen the union nuts (1).
(4) Remove and keep the nuts (2) and the washers (3).
(5) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(6) Loosen the camlocs (6) and open the clamps (7).
(7) Remove the interconnecting cables with the attached grommets (8).
(8) Remove the grommets (8) from the interconnecting cables and keep them.
Subtask 36-22-18-020-052-B ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 01:17:29 UTC
Removal of the Interconnecting Cables
ZONE: 140
FIN: 90HF ** ON A/C NOT FOR ALL
FIN: 91HF ** ON A/C NOT FOR ALL
FIN: 92HF ** ON A/C NOT FOR ALL
FIN: 93HF ** ON A/C NOT FOR ALL
1. Reason for the JobFIN: 90HF ** ON A/C NOT FOR ALL
FIN: 91HF ** ON A/C NOT FOR ALL
FIN: 92HF ** ON A/C NOT FOR ALL
FIN: 93HF ** ON A/C NOT FOR ALL
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | AR | CAP - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 140 | CENTER WING |
| FOR [90HF] (INTERCONNECTING CABLE) | |
| FOR [91HF] (INTERCONNECTING CABLE) | |
| 191BB, 191EB | |
| FOR [92HF] (INTERCONNECTING CABLE) | |
| FOR [93HF] (INTERCONNECTING CABLE) | |
| 192EB, 192FB | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-33-21-618-001-A | Pre-conditioning through the LP Ground Connection (Aircraft Electrical Power Available) |
| TASK 12-33-21-618-001-A-01 | Pre-conditioning through the HP Ground Connection |
| TASK 12-33-21-618-001-A-02 | Pre-conditioning with the APU |
| TASK 12-33-21-618-001-A-03 | Pre-conditioning through the LP Ground Connection (Aircraft Electrical Power Not Available) |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
Subtask 36-22-18-861-051-A ** ON A/C NOT FOR ALL Subtask 36-22-18-860-053-A ** ON A/C NOT FOR ALL
B. Aircraft Maintenance Configuration
(1) Put the WARNING NOTICE(S) in position:
Subtask 36-22-18-865-055-A ** ON A/C NOT FOR ALL (1) Put the WARNING NOTICE(S) in position:
- in the cockpit on Engine Control Panel 115VU to tell persons not to start the engine(s)
- in the cockpit on ENG Man Panel 22VU to tell persons not to manual start the engine(s)
- in the cockpit on AIR COND Overhead Control Panel 30VU to tell persons not to push in the APU BLEED pushbutton switch
- on the High Pressure (HP) ground connector to tell persons not to pressurize the system.
NOTE: For the location and access of the HP ground connector, refer to (Ref. AMM TASK 12-33-21-618-001).
C. Open, safety and tag this(these) circuit breaker(s):
Subtask 36-22-18-010-052-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/ENG 1/CTL | 3HA1 | D12 |
| 49VU | AIR BLEED/ENG 1/MONG | 2HA1 | D11 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/X FEED/VALVE/BAT | 2HV | D13 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/ENG 2/MONG | 3HA2 | D12 |
| 49VU | AIR BLEED/ENG 1/CTL | 2HA1 | D11 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR BLEED/ENG 2/CTL | 3HA2 | Z23 |
| 122VU | AIR BLEED/ENG 2/MONG | 2HA2 | Z22 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR BLEED/X FEED VALVE/NORM | 1HV | Z20 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR BLEED/ENG 1/MONG | 3HA1 | Z23 |
| 122VU | AIR BLEED/ENG 2/CTL | 2HA2 | Z22 |
D. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position below the related access panels.
(2) Remove the applicable access panels:
(a) FOR [90HF] (INTERCONNECTING CABLE), [91HF] (INTERCONNECTING CABLE)
remove 191BB and 191EB.
(b) FOR [92HF] (INTERCONNECTING CABLE), [93HF] (INTERCONNECTING CABLE)
remove 192EB and 192FB.
4. Procedure(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position below the related access panels.
(2) Remove the applicable access panels:
(a) FOR [90HF] (INTERCONNECTING CABLE), [91HF] (INTERCONNECTING CABLE)
remove 191BB and 191EB.
(b) FOR [92HF] (INTERCONNECTING CABLE), [93HF] (INTERCONNECTING CABLE)
remove 192EB and 192FB.
Subtask 36-22-18-020-052-A ** ON A/C NOT FOR ALL
WARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
CAUTION:
MAKE MATCH MARKS ON ALL THE ELECTRICAL WIRES BEFORE YOU DISCONNECT THEM. INCORRECT CONNECTION OF WIRES WILL CAUSE DAMAGE TO EQUIPMENT.
A. Removal of the Interconnecting Cables NOTE: Do the procedure carefully. Do not cause any damage to the interconnecting cables and sensing elements.
(1) Cut and remove the lockwires from the nuts (2) and the sockets (4). (2) Discard the lockwires.
(3) Loosen the union nuts (1).
(4) Remove and keep the nuts (2) and the washers (3).
(5) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(6) Loosen the camlocs (6) and open the clamps (7).
(7) Remove the interconnecting cables with the attached grommets (8).
(8) Remove the grommets (8) from the interconnecting cables and keep them.
A. Removal of the Interconnecting Cables
(3) Discard the lockwires.
(4) Loosen the union nuts (1) and the nuts (2).
(5) Remove the union nuts (1), the nuts (2) and the washers (3) and keep them.
(6) Remove the sockets (4) from the brackets (5).
(7) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(8) Loosen the camlocs (6) and open the clamps (7).
(9) Remove the interconnecting cables together with the grommets (8).
(10) Remove the grommets (8) from the interconnecting cables and keep them.
CAUTION:
MAKE MATCH MARKS ON ALL THE ELECTRICAL WIRES BEFORE YOU DISCONNECT THEM. INCORRECT CONNECTION OF WIRES WILL CAUSE DAMAGE TO EQUIPMENT.
CAUTION:
MAKE SURE THAT THE ELECTRICAL CONNECTORS ARE CLEAN BEFORE YOU DISCONNECT OR CONNECT THEM. CONTAMINATION ON THE ELECTRICAL CONNECTORS CAN CAUSE DAMAGE TO EQUIPMENT.
(1) Make sure that you do not cause damage to the interconnecting cables and the sensing elements when you do this procedure. WARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
(2) Cut and remove the lockwires from the nuts (2) and the sockets (4). (3) Discard the lockwires.
(4) Loosen the union nuts (1) and the nuts (2).
(5) Remove the union nuts (1), the nuts (2) and the washers (3) and keep them.
(6) Remove the sockets (4) from the brackets (5).
(7) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(8) Loosen the camlocs (6) and open the clamps (7).
(9) Remove the interconnecting cables together with the grommets (8).
(10) Remove the grommets (8) from the interconnecting cables and keep them.
Interconnecting Cables