Installation of the Overheat Sensing Elements
TASK 36-22-16-400-004-A
Installation of the Overheat Sensing Elements
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 36-22-16-941-061-A
Subtask 36-22-16-420-060-A
(2) Install a protective sleeve (26) on the overheat sensing element (14) or (17) at each clamp (25).
(3) Close the clamps (25) sufficiently to hold the overheat sensing element (14) or (17) in position. Let the overheat sensing element (14) or (17) be sufficiently free for you to make the connections.
(4) Install the overheat sensing element 26HF(42HF) and 53HF(69HF):
(a) At the pylon outboard closing-rib, remove the blanking caps from the connectors (19) and (22).
(b) Install the connector (22) in the flanged attachment (21).
(c) Install the nut (20) on the connector (22).
(d) TORQUE the nut (20) to between 0.68 and 0.56 m.daN (60.18 and 49.56 lbf.in )
.
(e) Install the connector (19) on the connector (22).
(f) TORQUE the connector (19) to between 0.68 and 0.56 m.daN (60.18 and 49.56 lbf.in )
.
(g) At the outboard telescope-rib, remove the blanking caps from the connectors (19), (22), (23) and (24).
(h) Install the connectors (22) and (23) in the flanged attachment (21).
(i) Install the nut (20) on the connectors (22) and (23).
(j) TORQUE the nut (20) to between 0.680 and 0.56 m.daN (60.18 and 49.56 lbf.in )
.
(k) Install the connectors (19) and (24) on the connectors (22) and (23).
(l) TORQUE the connectors (19) and (24) to between 0.68 and 0.56 m.daN (60.18 and 49.56 lbf.in )
.
(5) Safety the connectors (19), (22), (23), and (24) and the the nuts (20) with14QFB1 Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - .
(6) Close all the clamps (25) to hold the overheat sensing element (14) or (17). Lock the quick-release fasteners (27).
Subtask 36-22-16-865-066-A
Subtask 36-22-16-410-053-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 01:17:10 UTC
Installation of the Overheat Sensing Elements
WARNING:
MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING NOTICES ARE IN POSITION.
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE |
| No specific | AR | SAFETY BARRIER(S) |
| No specific | AR | WARNING NOTICE(S) |
| No specific | Torque wrench: range to between 0.680 and 0.56 m.daN (60.18 and 49.56 lbf.in ) ![]() | |
| 98D27803000000 | 1 | LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.14QFB1) | Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 500 | LEFT WING |
| 600 | RIGHT WING |
| FOR [26HF] (SNSG ELEM-OVHT, L WING LOOP A) | |
| FOR [53HF] (SNSG ELEM-OVHT, L WING LOOP B) | |
| 522AT, 522CB, 522EB, 522FB | |
| 522YB | |
| 522AB | |
| FOR [42HF] (SNSG ELEM-OVHT, R WING LOOP A) | |
| FOR [69HF] (SNSG ELEM-OVHT, R WING LOOP B) | |
| 622AT, 622CB, 622EB, 622FB | |
| 622AB | |
| 622YB | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 27-80-00-866-004-A | Extending the Slats on the Ground |
| TASK 27-80-00-866-005-A | Retracting the Slats on the Ground |
| TASK 36-22-00-710-001-A | Operational Test of the Overheat Detection System |
| TASK 36-22-00-710-802-A | Operational Test of the Overheat Detection System |
| TASK 57-41-37-000-003-A | Removal of the Access Panel |
| TASK 57-41-37-000-004-A | Removal of the Pressure Relief Panels |
| TASK 57-41-37-000-006-A | Removal of the Access Panels |
| TASK 57-41-37-400-002-A | Installation of the Pressure Relief Panels |
| TASK 57-41-37-400-003-A | Installation of the Access Panel |
| TASK 57-41-37-400-006-A | Installation of the Access Panels |
| FOR [26HF] (SNSG ELEM-OVHT, L WING LOOP A) | |
| FOR [53HF] (SNSG ELEM-OVHT, L WING LOOP B) | |
| TASK 57-41-37-000-003-A | Removal of the Access Panel |
| TASK 57-41-37-000-004-A | Removal of the Pressure Relief Panels |
| TASK 57-41-37-000-006-A | Removal of the Access Panels |
| TASK 57-41-37-000-012-A | Removal of the Access Panel |
| TASK 57-41-37-400-002-A | Installation of the Pressure Relief Panels |
| TASK 57-41-37-400-003-A | Installation of the Access Panel |
| TASK 57-41-37-400-006-A | Installation of the Access Panels |
| TASK 57-41-37-400-012-A | Installation of the Access Panel |
| FOR [42HF] (SNSG ELEM-OVHT, R WING LOOP A) | |
| FOR [69HF] (SNSG ELEM-OVHT, R WING LOOP B) | |
| TASK 57-41-37-000-003-A | Removal of the Access Panel |
| TASK 57-41-37-000-004-A | Removal of the Pressure Relief Panels |
| TASK 57-41-37-000-006-A | Removal of the Access Panels |
| TASK 57-41-37-000-012-A | Removal of the Access Panel |
| TASK 57-41-37-400-002-A | Installation of the Pressure Relief Panels |
| TASK 57-41-37-400-003-A | Installation of the Access Panel |
| TASK 57-41-37-400-006-A | Installation of the Access Panels |
| TASK 57-41-37-400-012-A | Installation of the Access Panel |
Subtask 36-22-16-941-061-A
A. Safety Precautions
(1) Make sure that the SAFETY BARRIER(S) are in position.
(2) Make sure that the WARNING NOTICE(S) is in position in the cockpit to tell persons not to operate the slat controls.
Subtask 36-22-16-860-071-A ** ON A/C NOT FOR ALL (1) Make sure that the SAFETY BARRIER(S) are in position.
(2) Make sure that the WARNING NOTICE(S) is in position in the cockpit to tell persons not to operate the slat controls.
B. Aircraft Maintenance Configuration
(1) Make sure that the slats are fully extended (Ref. AMM TASK 27-80-00-866-004).
(2) Make sure that the 98D27803000000 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is installed on the flap/slat control lever on panel 114VU.
(3) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in position below the applicable access panels.
(4) Make sure that the applicable access panels are removed (Ref. AMM TASK 57-41-37-000-003), (Ref. AMM TASK 57-41-37-000-004), (Ref. AMM TASK 57-41-37-000-006):
(a) FOR [26HF] (SNSG ELEM-OVHT, L WING LOOP A), [53HF] (SNSG ELEM-OVHT, L WING LOOP B)
panels 522AT 522AB 522CB 522EB 522FB
(b) FOR [42HF] (SNSG ELEM-OVHT, R WING LOOP A), [69HF] (SNSG ELEM-OVHT, R WING LOOP B)
panels 622AT 622AB 622CB 622EB 622FB.
Subtask 36-22-16-860-071-B ** ON A/C NOT FOR ALL (1) Make sure that the slats are fully extended (Ref. AMM TASK 27-80-00-866-004).
(2) Make sure that the 98D27803000000 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is installed on the flap/slat control lever on panel 114VU.
(3) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in position below the applicable access panels.
(4) Make sure that the applicable access panels are removed (Ref. AMM TASK 57-41-37-000-003), (Ref. AMM TASK 57-41-37-000-004), (Ref. AMM TASK 57-41-37-000-006):
(a) FOR [26HF] (SNSG ELEM-OVHT, L WING LOOP A), [53HF] (SNSG ELEM-OVHT, L WING LOOP B)
panels 522AT 522AB 522CB 522EB 522FB
(b) FOR [42HF] (SNSG ELEM-OVHT, R WING LOOP A), [69HF] (SNSG ELEM-OVHT, R WING LOOP B)
panels 622AT 622AB 622CB 622EB 622FB.
B. Aircraft Maintenance Configuration
(1) Make sure that the slats are fully extended (Ref. AMM TASK 27-80-00-866-004).
(2) Make sure that the 98D27803000000 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is installed on the flap/slat control lever on panel 114VU.
(3) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position below the applicable access panels.
(4) Make sure that the applicable access panels are removed:
(a) FOR [26HF] (SNSG ELEM-OVHT, L WING LOOP A), [53HF] (SNSG ELEM-OVHT, L WING LOOP B)
Subtask 36-22-16-865-065-A (1) Make sure that the slats are fully extended (Ref. AMM TASK 27-80-00-866-004).
(2) Make sure that the 98D27803000000 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is installed on the flap/slat control lever on panel 114VU.
(3) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position below the applicable access panels.
(4) Make sure that the applicable access panels are removed:
(a) FOR [26HF] (SNSG ELEM-OVHT, L WING LOOP A), [53HF] (SNSG ELEM-OVHT, L WING LOOP B)
- 522AT (Ref. AMM TASK 57-41-37-000-003)
- 522YB and 522CB (Ref. AMM TASK 57-41-37-000-004)
- 522EB (Ref. AMM TASK 57-41-37-000-012)
- 522FB (Ref. AMM TASK 57-41-37-000-006).
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/ENG 1/CTL | 3HA1 | D12 |
| 49VU | AIR BLEED/ENG 1/MONG | 2HA1 | D11 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1 | 5CV | B06 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/ENG 2/MONG | 3HA2 | D12 |
| 49VU | AIR BLEED/ENG 1/CTL | 2HA1 | D11 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1 | 5CV | B01 |
| ** ON A/C ALL | |||
| 121VU | FLIGHT CONTROLS/SLT/CTL/SYS2 | 7CV | R21 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR BLEED/ENG 2/CTL | 3HA2 | Z23 |
| 122VU | AIR BLEED/ENG 2/MONG | 2HA2 | Z22 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR BLEED/ENG 1/MONG | 3HA1 | Z23 |
| 122VU | AIR BLEED/ENG 2/CTL | 2HA2 | Z22 |
Subtask 36-22-16-420-060-A
A. Preparation for Installation
(1) Clean the component interface and/or the adjacent area with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Make sure that the parts retained from the removed component are clean and in the correct condition.
(4) Examine the applicable overheat sensing element (14) and (17) for the correct condition. The element tube must not be twisted and the surface must be free of damage other than the limits that follow:
(a) The maximum permitted depth of abrasions or dents is 0.05 mm (0.0020 in.).
(b) The minimum permitted tube diameter at a dent is 1.78 mm (0.0701 in.).
(5) Remove the blanking caps from the overheat sensing element (14) or (17) connectors and examine the connectors for the correct condition. Put the blanking caps on the connectors again.
Subtask 36-22-16-420-053-A (1) Clean the component interface and/or the adjacent area with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Make sure that the parts retained from the removed component are clean and in the correct condition.
(4) Examine the applicable overheat sensing element (14) and (17) for the correct condition. The element tube must not be twisted and the surface must be free of damage other than the limits that follow:
(a) The maximum permitted depth of abrasions or dents is 0.05 mm (0.0020 in.).
(b) The minimum permitted tube diameter at a dent is 1.78 mm (0.0701 in.).
(5) Remove the blanking caps from the overheat sensing element (14) or (17) connectors and examine the connectors for the correct condition. Put the blanking caps on the connectors again.
WARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
CAUTION:
REMOVE OR INSTALL THE SENSING ELEMENTS CAREFULLY. DO NOT TWIST, BEND OR CAUSE KINKS IN THE SENSING ELEMENTS. IF YOU DO, YOU CAN CAUSE DAMAGE TO THEM.
B. Installation of the Overheat Sensing Elements 26HF(42HF), 53HF(69HF) NOTE: Obey the permitted tolerances for the installation of the sensing elements:
(1) Carefully install the overheat sensing element (14) or (17) and install the applicable grommets (37). Do not remove the blanking caps until the overheat sensing element (14) or (17) is in the position for the connection. (2) Install a protective sleeve (26) on the overheat sensing element (14) or (17) at each clamp (25).
(3) Close the clamps (25) sufficiently to hold the overheat sensing element (14) or (17) in position. Let the overheat sensing element (14) or (17) be sufficiently free for you to make the connections.
(4) Install the overheat sensing element 26HF(42HF) and 53HF(69HF):
(a) At the pylon outboard closing-rib, remove the blanking caps from the connectors (19) and (22).
(b) Install the connector (22) in the flanged attachment (21).
(c) Install the nut (20) on the connector (22).
(d) TORQUE the nut (20) to between 0.68 and 0.56 m.daN (60.18 and 49.56 lbf.in )
. (e) Install the connector (19) on the connector (22).
(f) TORQUE the connector (19) to between 0.68 and 0.56 m.daN (60.18 and 49.56 lbf.in )
. (g) At the outboard telescope-rib, remove the blanking caps from the connectors (19), (22), (23) and (24).
(h) Install the connectors (22) and (23) in the flanged attachment (21).
(i) Install the nut (20) on the connectors (22) and (23).
(j) TORQUE the nut (20) to between 0.680 and 0.56 m.daN (60.18 and 49.56 lbf.in )
. (k) Install the connectors (19) and (24) on the connectors (22) and (23).
(l) TORQUE the connectors (19) and (24) to between 0.68 and 0.56 m.daN (60.18 and 49.56 lbf.in )
. (5) Safety the connectors (19), (22), (23), and (24) and the the nuts (20) with
(6) Close all the clamps (25) to hold the overheat sensing element (14) or (17). Lock the quick-release fasteners (27).
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 36-22-16-710-053-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/ENG 1/CTL | 3HA1 | D12 |
| 49VU | AIR BLEED/ENG 1/MONG | 2HA1 | D11 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/ENG 2/MONG | 3HA2 | D12 |
| 49VU | AIR BLEED/ENG 1/CTL | 2HA1 | D11 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR BLEED/ENG 2/CTL | 3HA2 | Z23 |
| 122VU | AIR BLEED/ENG 2/MONG | 2HA2 | Z22 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR BLEED/ENG 1/MONG | 3HA1 | Z23 |
| 122VU | AIR BLEED/ENG 2/CTL | 2HA2 | Z22 |
D. Test
(1) Do an operational test of the overheat detection system (Ref. AMM TASK 36-22-00-710-001).
Subtask 36-22-16-710-053-B ** ON A/C NOT FOR ALL (1) Do an operational test of the overheat detection system (Ref. AMM TASK 36-22-00-710-001).
D. Operational Test
(1) Do an operational test of the overheat detection system (Ref. AMM TASK 36-22-00-710-802).
5. Close-up(1) Do an operational test of the overheat detection system (Ref. AMM TASK 36-22-00-710-802).
Subtask 36-22-16-410-053-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the applicable access panels (Ref. AMM TASK 57-41-37-400-003), (Ref. AMM TASK 57-41-37-400-002), (Ref. AMM TASK 57-41-37-400-006):
(a) FOR [26HF] (SNSG ELEM-OVHT, L WING LOOP A), [53HF] (SNSG ELEM-OVHT, L WING LOOP B)
install 522AT 522AB 522CB 522EB 522FB
(b) FOR [42HF] (SNSG ELEM-OVHT, R WING LOOP A), [69HF] (SNSG ELEM-OVHT, R WING LOOP B)
install 622AT 622AB 622CB 622EB 622FB.
Subtask 36-22-16-410-053-B ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the applicable access panels (Ref. AMM TASK 57-41-37-400-003), (Ref. AMM TASK 57-41-37-400-002), (Ref. AMM TASK 57-41-37-400-006):
(a) FOR [26HF] (SNSG ELEM-OVHT, L WING LOOP A), [53HF] (SNSG ELEM-OVHT, L WING LOOP B)
install 522AT 522AB 522CB 522EB 522FB
(b) FOR [42HF] (SNSG ELEM-OVHT, R WING LOOP A), [69HF] (SNSG ELEM-OVHT, R WING LOOP B)
install 622AT 622AB 622CB 622EB 622FB.
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the applicable access panels:
(a) FOR [26HF] (SNSG ELEM-OVHT, L WING LOOP A), [53HF] (SNSG ELEM-OVHT, L WING LOOP B)
Subtask 36-22-16-865-067-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the applicable access panels:
(a) FOR [26HF] (SNSG ELEM-OVHT, L WING LOOP A), [53HF] (SNSG ELEM-OVHT, L WING LOOP B)
- 522AT (Ref. AMM TASK 57-41-37-400-003)
- 522YB and 522CB (Ref. AMM TASK 57-41-37-400-002)
- 522EB (Ref. AMM TASK 57-41-37-400-012)
- 522FB (Ref. AMM TASK 57-41-37-400-006).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 36-22-16-860-070-A Subtask 36-22-16-942-053-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1 | 5CV | B06 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1 | 5CV | B01 |
| ** ON A/C ALL | |||
| 121VU | FLIGHT CONTROLS/SLT/CTL/SYS2 | 7CV | R21 |
D. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the WARNING NOTICE(S).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Remove the safety barriers.
(2) Remove the WARNING NOTICE(S).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Overheat Sensing Elements and Cables - Access Panels