Removal of the Cables
TASK 36-22-16-000-007-A
Removal of the Cables
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 36-22-16-941-056-A
Subtask 36-22-16-020-056-A
[Rev.10 from 2021]
2026.04.01 01:17:08 UTC
Removal of the Cables
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE |
| No specific | AR | CAP - BLANKING |
| No specific | AR | SAFETY BARRIER(S) |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | AR | WARNING NOTICE(S) |
| 98D27803000000 | 1 | LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 500 | LEFT WING |
| 600 | RIGHT WING |
| FOR [25HF] (CABLE-CONNECTING, L WING LOOP A) | |
| FOR [52HF] (CABLE-CONNECTING, L WING LOOP B) | |
| 522EB, 522FB | |
| FOR [41HF] (CABLE-CONNECTING, R WING LOOP A) | |
| FOR [68HF] (CABLE-CONNECTING, R WING LOOP B) | |
| 622EB, 622FB | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 27-80-00-866-004-A | Extending the Slats on the Ground |
Subtask 36-22-16-941-056-A
A. Safety Precautions
(1) Put the SAFETY BARRIER(S) in position.
(2) Put a WARNING NOTICE(S) in position in the cockpit to tell persons not to operate the slat controls.
Subtask 36-22-16-860-063-A (1) Put the SAFETY BARRIER(S) in position.
(2) Put a WARNING NOTICE(S) in position in the cockpit to tell persons not to operate the slat controls.
B. Aircraft Maintenance Configuration
(1) Extend the slats fully (Ref. AMM TASK 27-80-00-866-004).
(2) Install the 98D27803000000 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION on the flap/slat control lever on panel 114VU.
Subtask 36-22-16-865-074-A (1) Extend the slats fully (Ref. AMM TASK 27-80-00-866-004).
(2) Install the 98D27803000000 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION on the flap/slat control lever on panel 114VU.
C. Open, safety and tag this(these) circuit breaker(s):
Subtask 36-22-16-010-056-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/ENG 1/CTL | 3HA1 | D12 |
| 49VU | AIR BLEED/ENG 1/MONG | 2HA1 | D11 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1 | 5CV | B06 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/ENG 2/MONG | 3HA2 | D12 |
| 49VU | AIR BLEED/ENG 1/CTL | 2HA1 | D11 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1 | 5CV | B01 |
| ** ON A/C ALL | |||
| 121VU | FLIGHT CONTROLS/SLT/CTL/SYS2 | 7CV | R21 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR BLEED/ENG 2/CTL | 3HA2 | Z23 |
| 122VU | AIR BLEED/ENG 2/MONG | 2HA2 | Z22 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR BLEED/ENG 1/MONG | 3HA1 | Z23 |
| 122VU | AIR BLEED/ENG 2/CTL | 2HA2 | Z22 |
D. Get Access
(1) Put the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE in position below the applicable access panel.
(2) Remove the applicable access panels:
(a) FOR [25HF] (CABLE-CONNECTING, L WING LOOP A), [52HF] (CABLE-CONNECTING, L WING LOOP B)
remove 522EB 522FB
(b) FOR [41HF] (CABLE-CONNECTING, R WING LOOP A), [68HF] (CABLE-CONNECTING, R WING LOOP B)
remove 622EB 622FB.
4. Procedure(1) Put the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE in position below the applicable access panel.
(2) Remove the applicable access panels:
(a) FOR [25HF] (CABLE-CONNECTING, L WING LOOP A), [52HF] (CABLE-CONNECTING, L WING LOOP B)
remove 522EB 522FB
(b) FOR [41HF] (CABLE-CONNECTING, R WING LOOP A), [68HF] (CABLE-CONNECTING, R WING LOOP B)
remove 622EB 622FB.
Subtask 36-22-16-020-056-A
A. Removal of the Cables
(2) Remove the applicable cable (15) or (16) from the electrical raceway.
(3) Cut the electrical cable (15) or (16) at the in-line splice connector.
(a) For the cable 25HF:
(5) For the cables 25HF(41HF):
(8) Put CAP - BLANKING on the disconnected connectors.
CAUTION:
MAKE MATCH MARKS ON ALL THE ELECTRICAL WIRES BEFORE YOU DISCONNECT THEM. INCORRECT CONNECTION OF WIRES WILL CAUSE DAMAGE TO EQUIPMENT.
(1) Remove the bolts (35) and the clamps (33) from the applicable cable (15) or (16). (2) Remove the applicable cable (15) or (16) from the electrical raceway.
(3) Cut the electrical cable (15) or (16) at the in-line splice connector.
(a) For the cable 25HF:
- at the connector 4013VS in route 1S.
- at the connector 4012VS in route 1S.
- at the connector 4021VS in route 2S.
- at the connector 4020VS in route 2S.
(5) For the cables 25HF(41HF):
- disconnect the connector (24) from the connector (22).
- disconnect the connector (19) from the connector (23)
- remove the nut (20) from the connector (23)
- remove the connector (23) from the flanged attachment (21).
(8) Put CAP - BLANKING on the disconnected connectors.
Overheat Sensing Elements and Cables - Access Panels