Installation of the HP Ground Connector
TASK 36-13-41-400-001-A
Installation of the HP Ground Connector
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Expendable Parts
D. Referenced Information
3. Job Set-up
Subtask 36-13-41-860-051-A
Subtask 36-13-41-420-050-B ** ON A/C NOT FOR ALL
Subtask 36-13-41-410-050-A
[Rev.10 from 2021]
2026.04.01 01:16:07 UTC
Installation of the HP Ground Connector
WARNING:
MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START WORK. PRESSURIZED AIR CAN CAUSE INJURY TO PERSONNEL.
FIN: 7300HM
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 191BB |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 1 | NUT | AIPC 36-11-03-22-060 |
| 1 | NUT | AIPC 36-11-83-03-190 |
| REFERENCE | DESIGNATION |
|---|---|
Subtask 36-13-41-860-051-A
A. Aircraft Maintenance Configuration
(1) Make sure that the WARNING NOTICE(S) are in position:
(3) Make sure that the access panel 191BB is open.
Subtask 36-13-41-865-051-A (1) Make sure that the WARNING NOTICE(S) are in position:
- in the cockpit on the Engine Control Panel 115VU to tell persons not to start the engine(s),
- in the cockpit on the AIR COND Overhead Control Panel 30VU to tell persons not to push in the APU BLEED pushbutton switch.
(3) Make sure that the access panel 191BB is open.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/ENG 1/CTL | 3HA1 | D12 |
| 49VU | AIR BLEED/ENG 1/MONG | 2HA1 | D11 |
| ** ON A/C ALL | |||
| 49VU | AIR BLEED/X FEED/VALVE/BAT | 2HV | D13 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/ENG 2/MONG | 3HA2 | D12 |
| 49VU | AIR BLEED/ENG 1/CTL | 2HA1 | D11 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR BLEED/ENG 2/CTL | 3HA2 | Z23 |
| 122VU | AIR BLEED/ENG 2/MONG | 2HA2 | Z22 |
| ** ON A/C ALL | |||
| 122VU | AIR BLEED/X FEED VALVE/NORM | 1HV | Z20 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR BLEED/ENG 1/MONG | 3HA1 | Z23 |
| 122VU | AIR BLEED/ENG 2/CTL | 2HA2 | Z22 |
Subtask 36-13-41-420-050-B ** ON A/C NOT FOR ALL
A. Installation of the HP Ground Connector
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Remove the blanking cap from the duct.
(4) Install the O-ring (4) and the check valve (5) in the HP Ground Connector (3).
(5) Install the sealing ring (6) and the HP Ground Connector (3) with four washers (2) and the AIPC 36-11-03-22-060 NUT (1) at the long bolts and with one washer (2) and the AIPC 36-11-03-22-060 NUT (1) at the short bolts.
(6) TORQUE the nuts (1) to between 1.06 and 0.82 m.daN (93.81 and 72.57 lbf.in )
.
Subtask 36-13-41-420-050-C ** ON A/C NOT FOR ALL (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Remove the blanking cap from the duct.
(4) Install the O-ring (4) and the check valve (5) in the HP Ground Connector (3).
(5) Install the sealing ring (6) and the HP Ground Connector (3) with four washers (2) and the AIPC 36-11-03-22-060 NUT (1) at the long bolts and with one washer (2) and the AIPC 36-11-03-22-060 NUT (1) at the short bolts.
(6) TORQUE the nuts (1) to between 1.06 and 0.82 m.daN (93.81 and 72.57 lbf.in )
. A. Installation of the HP Ground Connector
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Remove the blanking cap from the duct.
(4) Install the O-ring (4) and the check valve (5) in the HP Ground Connector (3).
(5) Install the sealing ring (6) and the HP Ground Connector (3) with eight washers (2) and AIPC 36-11-03-22-060 NUT (1).
(6) TORQUE the nuts (1) to between 0.8 and 0.7 m.daN (70.80 and 61.95 lbf.in )
.
Subtask 36-13-41-420-050-D ** ON A/C NOT FOR ALL (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Remove the blanking cap from the duct.
(4) Install the O-ring (4) and the check valve (5) in the HP Ground Connector (3).
(5) Install the sealing ring (6) and the HP Ground Connector (3) with eight washers (2) and AIPC 36-11-03-22-060 NUT (1).
(6) TORQUE the nuts (1) to between 0.8 and 0.7 m.daN (70.80 and 61.95 lbf.in )
. A. Installation of the HP Ground Connector
(1) Remove the blanking cap from the duct.
(2) Clean the component interfaces and the adjacent area.
(3) Do an inspection of the component interfaces and the adjacent area.
(4) Put the O-ring (4) in position between the check valve (5) and the the HP Ground Connector (3).
(5) Put the HP Ground Connector (3), together with the O-ring (4) and the check valve (5) on the sealing ring (6), and connect these items on the open duct.
(6) Install the washers (2) and the AIPC 36-11-03-22-060 NUT (1) on the duct.
.
Subtask 36-13-41-420-050-E ** ON A/C NOT FOR ALL (1) Remove the blanking cap from the duct.
(2) Clean the component interfaces and the adjacent area.
(3) Do an inspection of the component interfaces and the adjacent area.
(4) Put the O-ring (4) in position between the check valve (5) and the the HP Ground Connector (3).
(5) Put the HP Ground Connector (3), together with the O-ring (4) and the check valve (5) on the sealing ring (6), and connect these items on the open duct.
(6) Install the washers (2) and the AIPC 36-11-03-22-060 NUT (1) on the duct.
NOTE: Four washers must be installed at long bolts, only one washer at the short bolts.
(7) TORQUE the nuts (1) to between 1.06 and 0.82 m.daN (93.81 and 72.57 lbf.in )
. A. Installation of the HP Ground Connector
(1) Remove the blanking cap from the duct.
(2) Clean the component interfaces and the adjacent area.
(3) Do an inspection of the component interfaces and the adjacent area.
(4) Put the O-ring (4) in position between the check valve (5) and the HP ground connector (3).
(5) Put the HP ground connector (3), the O-ring (4) and the check valve (5) on the sealing ring (6) together as an assembly.
(6) Install the HP ground connector assembly on the open duct.
(7) Install the washers (2) and the AIPC 36-11-83-03-190 NUT (1) on the duct:
(a) Four washers must be installed at long bolts, only one washer at the short bolts.
(8) TORQUE the nuts (1) to between 1.06 and 0.82 m.daN (93.81 and 72.57 lbf.in )
.
5. Close-up(1) Remove the blanking cap from the duct.
(2) Clean the component interfaces and the adjacent area.
(3) Do an inspection of the component interfaces and the adjacent area.
(4) Put the O-ring (4) in position between the check valve (5) and the HP ground connector (3).
(5) Put the HP ground connector (3), the O-ring (4) and the check valve (5) on the sealing ring (6) together as an assembly.
(6) Install the HP ground connector assembly on the open duct.
(7) Install the washers (2) and the AIPC 36-11-83-03-190 NUT (1) on the duct:
(a) Four washers must be installed at long bolts, only one washer at the short bolts.
(8) TORQUE the nuts (1) to between 1.06 and 0.82 m.daN (93.81 and 72.57 lbf.in )
. Subtask 36-13-41-410-050-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panel 191BB.
(3) Remove the access platform.
(4) Remove the WARNING NOTICE(S).
Subtask 36-13-41-865-052-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panel 191BB.
(3) Remove the access platform.
(4) Remove the WARNING NOTICE(S).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/ENG 1/CTL | 3HA1 | D12 |
| 49VU | AIR BLEED/ENG 1/MONG | 2HA1 | D11 |
| ** ON A/C ALL | |||
| 49VU | AIR BLEED/X FEED/VALVE/BAT | 2HV | D13 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/ENG 2/MONG | 3HA2 | D12 |
| 49VU | AIR BLEED/ENG 1/CTL | 2HA1 | D11 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR BLEED/ENG 2/CTL | 3HA2 | Z23 |
| 122VU | AIR BLEED/ENG 2/MONG | 2HA2 | Z22 |
| ** ON A/C ALL | |||
| 122VU | AIR BLEED/X FEED VALVE/NORM | 1HV | Z20 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR BLEED/ENG 1/MONG | 3HA1 | Z23 |
| 122VU | AIR BLEED/ENG 2/CTL | 2HA2 | Z22 |
HP Ground Connector 7300HM