W DOC AIRBUS | AMM A320F

Removal of the Bellows


TASK 36-12-42-000-001-A
Removal of the Bellows


WARNING: PUT WARNING NOTICES IN THE COCKPIT BEFORE YOU DO WORK ON THE BLEED AIR SYSTEM TO TELL PERSONS:
  • NOT TO OPERATE THE ENGINES
  • NOT TO OPERATE THE SLATS
  • NOT TO OPERATE THE APU SWITCH.
FIN: 7265HM ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 3M (10 FT)
No specific
AR
CAP - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
AR
WARNING NOTICE(S)
 B. Referenced Information
REFERENCE
DESIGNATION
3. Job Set-up
Subtask 36-12-42-865-050-A ** ON A/C NOT FOR ALL
A. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUAIR BLEED/X FEED/VALVE/BAT2HVD13
49VUAIR BLEED/ENG 1/CTL3HA1D12
49VUAIR BLEED/ENG 1/MONG2HA1D11
122VUAIR BLEED/ENG 2/CTL3HA2Z23
122VUAIR BLEED/ENG 2/MONG2HA2Z22
122VUAIR BLEED/X FEED VALVE/NORM1HVZ20
Subtask 36-12-42-860-050-A ** ON A/C NOT FOR ALL
B. Aircraft Maintenance Configuration
   (1) Put the WARNING NOTICE(S) in position:
  • in the cockpit on the Engine Control Panel 115VU to tell persons not to start the engine(s),
  • in the cockpit on the AIR COND Overhead Control Panel 30VU to tell persons not to push in the APU BLEED pushbutton switch,
  • on the HP ground connector to tell persons not to pressurize the pneumatic system.
   (2) Put the ACCESS PLATFORM 3M (10 FT) in position below the access door 312AR.
   (3) Open the access door 312AR.
4. Procedure
Subtask 36-12-42-020-050-A ** ON A/C NOT FOR ALL
A. Removal of the Bellows (7265HM)
WARNING: MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START WORK. PRESSURIZED AIR CAN CAUSE INJURY TO PERSONNEL.
   (1) Remove the sleeve (2), if installed.
   (2) Remove the clamp (3).
   (3) Loosen the clamps (4) and (6).
   (4) Carefully remove the bellows (5) from between the duct sections (1) and (7).
   (5) Put a CAP - BLANKING on the open ends of the duct sections (1) and (7).
[Rev.10 from 2021] 2026.04.01 01:15:32 UTC