Leak Check of Bleed Air Ducting in the Fuselage Area between the APU Bleed Check Valve, Air Conditioning Pack and Wing/Fuselage Connection
TASK 36-12-00-790-003-A
Leak Check of Bleed Air Ducting in the Fuselage Area between the APU Bleed Check Valve, Air Conditioning Pack and Wing/Fuselage Connection
Refer to the MPD TASK: 361200-03
LEAK CHECK OF BLEED AIR DUCTING IN FUSELAGE AREA BETWEEN APU BLEED CHECK VALVE, AIR CONDITIONING PACK AND WING/FUSELAGE CONNECTION
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 36-12-00-010-054-A ** ON A/C NOT FOR ALL
Subtask 36-12-00-720-052-A
Subtask 36-12-00-860-063-A
[Rev.10 from 2021]
2026.04.01 01:15:25 UTC
Leak Check of Bleed Air Ducting in the Fuselage Area between the APU Bleed Check Valve, Air Conditioning Pack and Wing/Fuselage Connection
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
1. Reason for the JobRefer to the MPD TASK: 361200-03
LEAK CHECK OF BLEED AIR DUCTING IN FUSELAGE AREA BETWEEN APU BLEED CHECK VALVE, AIR CONDITIONING PACK AND WING/FUSELAGE CONNECTION
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 2M (6 FT) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 150 | AFT CARGO COMPARTMENT FWD PRESS BULKHEAD TO AFT BULKHEAD OF AFT CARGO COMPARTMENT |
| 160 | BULK CARGO COMPARTMENT AFT BULKHEAD OF AFT CARGO COMPARTMENT TO AFT BULKHEAD OF BULK CARGO COMPARTMENT |
| 190 | BELLY FAIR, AIR CONDITIONING & HYD COMPT |
| 310 | FUSLG TAIL SECTION AFT OF AFT PRESS BHD |
| 147AB, 147EB, 147FB, 191BB, 191EB, 191JB, 192EB, 192FB, 192KB, 196AB | |
| 197KB | |
| 197BB |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
| TASK 36-12-00-860-002-A | Pressurization of the Bleed System through the HP Ground Connector |
| TASK 36-12-41-000-001-A | Removal of a Bleed-Air Duct |
| TASK 36-12-41-400-001-A | Installation of a Bleed-Air Duct |
| TASK 49-00-00-860-005-A | APU Start by External Power |
| TASK 49-00-00-860-005-A-01 | APU Start by Batteries |
| TASK 49-00-00-860-006-A | APU Shutdown by External Power |
| TASK 49-00-00-860-006-A-01 | APU Shutdown by Batteries |
| TASK 49-00-00-860-008-A | APU Start by External Power |
| TASK 49-00-00-860-008-A-01 | APU Start by Batteries |
| TASK 49-00-00-860-009-A | APU Shutdown by External Power (131-9(A)) |
| TASK 49-00-00-860-009-A-01 | APU Shutdown by Batteries (131-9(A)) |
| TASK 53-35-13-000-001-A | Removal of the Belly Fairing Access Panels |
| TASK 53-35-13-000-002-A | Removal of the Quick-Release Access Panels from the Belly Fairing Structure |
| TASK 53-35-13-400-001-A | Installation of the Belly Fairing Access Panels |
| TASK 53-35-13-400-002-A | Installation of the Quick-Release Access Panels on the Belly Fairing Structure |
| TASK 20-26-00-910-002-A | Installation of Expansion Joints (for corrective action) |
Subtask 36-12-00-010-054-A ** ON A/C NOT FOR ALL
A. Get Access
APU Bleed Air Ducts - Access ** ON A/C NOT FOR ALL
APU Bleed Air Ducts - Access ** ON A/C NOT FOR ALL
(1) Get access to the APU bleed-air ducts between FR34 and FR36.
(a) Put the ACCESS PLATFORM 2M (6 FT) in position below the access panels 191BB, 191EB 192FB and 192EB.
(b) Remove the access panels 191BB, 191EB, 192FB and 192EB (Ref. AMM TASK 53-35-13-000-002).
(2) Get access to the APU bleed-air ducts between FR36 and FR42.
(a) Put the ACCESS PLATFORM 2M (6 FT) in position below the access panels 191JB, 192KB and 196AB.
(b) Remove the access panel 191JB, 192KB and 196AB (Ref. AMM TASK 53-35-13-000-001).
(3) Get access to the APU bleed-air ducts between FR42 and FR50.
(a) Put the ACCESS PLATFORM 2M (6 FT) in position below the access panels 147AB, 147EB, 147FB and 197BB.
(b) Remove the access panels 147AB, 147EB, 147FB and 197BB (Ref. AMM TASK 53-35-13-000-001).
Subtask 36-12-00-010-054-B ** ON A/C NOT FOR ALL
APU Bleed Air Ducts - Access ** ON A/C NOT FOR ALL
APU Bleed Air Ducts - Access ** ON A/C NOT FOR ALL (a) Put the ACCESS PLATFORM 2M (6 FT) in position below the access panels 191BB, 191EB 192FB and 192EB.
(b) Remove the access panels 191BB, 191EB, 192FB and 192EB (Ref. AMM TASK 53-35-13-000-002).
(2) Get access to the APU bleed-air ducts between FR36 and FR42.
(a) Put the ACCESS PLATFORM 2M (6 FT) in position below the access panels 191JB, 192KB and 196AB.
(b) Remove the access panel 191JB, 192KB and 196AB (Ref. AMM TASK 53-35-13-000-001).
(3) Get access to the APU bleed-air ducts between FR42 and FR50.
(a) Put the ACCESS PLATFORM 2M (6 FT) in position below the access panels 147AB, 147EB, 147FB and 197BB.
(b) Remove the access panels 147AB, 147EB, 147FB and 197BB (Ref. AMM TASK 53-35-13-000-001).
A. Get Access
APU Bleed Air Ducts - Access ** ON A/C NOT FOR ALL
APU Bleed Air Ducts - Access ** ON A/C NOT FOR ALL
(1) Get access to the APU bleed-air ducts between FR35.5 and FR36.
(a) Put the ACCESS PLATFORM 2M (6 FT) in position below the access panels 191BB, 191EB, 192FB and 192EB.
(b) Remove the access panels 191BB, 191EB, 192FB and 192EB (Ref. AMM TASK 53-35-13-000-002).
(2) Get access to the APU bleed-air ducts between FR36 and FR42.
(a) Put the ACCESS PLATFORM 2M (6 FT) in position below the access panels 191JB, 192KB and 196AB.
(b) Remove the access panels 191JB, 192KB and 196AB (Ref. AMM TASK 53-35-13-000-001).
(3) Get access to the APU bleed-air ducts between FR42 and FR47.3.
(a) Put the ACCESS PLATFORM 2M (6 FT) in position below the access panels 147AB, 147EB, 147FB and 197KB.
(b) Remove the access panels 147AB, 147EB, 147FB and 197KB (Ref. AMM TASK 53-35-13-000-001).
Subtask 36-12-00-010-054-C ** ON A/C NOT FOR ALL
APU Bleed Air Ducts - Access ** ON A/C NOT FOR ALL
APU Bleed Air Ducts - Access ** ON A/C NOT FOR ALL (a) Put the ACCESS PLATFORM 2M (6 FT) in position below the access panels 191BB, 191EB, 192FB and 192EB.
(b) Remove the access panels 191BB, 191EB, 192FB and 192EB (Ref. AMM TASK 53-35-13-000-002).
(2) Get access to the APU bleed-air ducts between FR36 and FR42.
(a) Put the ACCESS PLATFORM 2M (6 FT) in position below the access panels 191JB, 192KB and 196AB.
(b) Remove the access panels 191JB, 192KB and 196AB (Ref. AMM TASK 53-35-13-000-001).
(3) Get access to the APU bleed-air ducts between FR42 and FR47.3.
(a) Put the ACCESS PLATFORM 2M (6 FT) in position below the access panels 147AB, 147EB, 147FB and 197KB.
(b) Remove the access panels 147AB, 147EB, 147FB and 197KB (Ref. AMM TASK 53-35-13-000-001).
A. Get Access
(1) Get access to the APU bleed-air ducts between FR34 and FR36.
(a) Put the ACCESS PLATFORM 2M (6 FT) in position below the access panels 191BB, 191EB, 192FB and 192EB.
(b) Remove the access panels 191BB, 191EB, 192FB and 192EB (Ref. AMM TASK 53-35-13-000-002).
(2) Get access to the APU bleed-air ducts between FR36 and FR42.
(a) Put the ACCESS PLATFORM 2M (6 FT) in position below the access panels 191JB, 192KB and 196AB.
(b) Remove the access panel 191JB, 192KB and 196AB (Ref. AMM TASK 53-35-13-000-001).
(3) Get access to the APU bleed-air ducts between FR42 and FR54.
(a) Put the ACCESS PLATFORM 2M (6 FT) in position below the access panels 147AB, 147EB, 147FB and 197BB.
(b) Remove the access panels 147AB, 147EB, 147FB and 197BB (Ref. AMM TASK 53-35-13-000-001).
Subtask 36-12-00-865-057-A (1) Get access to the APU bleed-air ducts between FR34 and FR36.
(a) Put the ACCESS PLATFORM 2M (6 FT) in position below the access panels 191BB, 191EB, 192FB and 192EB.
(b) Remove the access panels 191BB, 191EB, 192FB and 192EB (Ref. AMM TASK 53-35-13-000-002).
(2) Get access to the APU bleed-air ducts between FR36 and FR42.
(a) Put the ACCESS PLATFORM 2M (6 FT) in position below the access panels 191JB, 192KB and 196AB.
(b) Remove the access panel 191JB, 192KB and 196AB (Ref. AMM TASK 53-35-13-000-001).
(3) Get access to the APU bleed-air ducts between FR42 and FR54.
(a) Put the ACCESS PLATFORM 2M (6 FT) in position below the access panels 147AB, 147EB, 147FB and 197BB.
(b) Remove the access panels 147AB, 147EB, 147FB and 197BB (Ref. AMM TASK 53-35-13-000-001).
B. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 36-12-00-860-062-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/ENG 1/CTL | 3HA1 | D12 |
| 49VU | AIR BLEED/ENG 1/MONG | 2HA1 | D11 |
| ** ON A/C ALL | |||
| 49VU | AIR BLEED/X FEED/VALVE/BAT | 2HV | D13 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/ENG 2/MONG | 3HA2 | D12 |
| 49VU | AIR BLEED/ENG 1/CTL | 2HA1 | D11 |
| ** ON A/C ALL | |||
| 121VU | APU/APU/CTL | 2KD | L42 |
| 121VU | APU/ECB/SPLY | 1KD | L41 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR BLEED/ENG 2/CTL | 3HA2 | Z23 |
| 122VU | AIR BLEED/ENG 2/MONG | 2HA2 | Z22 |
| ** ON A/C ALL | |||
| 122VU | AIR BLEED/X FEED VALVE/NORM | 1HV | Z20 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR BLEED/ENG 1/MONG | 3HA1 | Z23 |
| 122VU | AIR BLEED/ENG 2/CTL | 2HA2 | Z22 |
C. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(3) On the AIR COND panel 30VU, make sure that:
Subtask 36-12-00-860-062-B ** ON A/C NOT FOR ALL (1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(3) On the AIR COND panel 30VU, make sure that:
- The OFF legends on the PACK 1 and PACK 2 pushbutton switches are on,
- the OFF legends of the ENG BLEED pushbutton switches are on,
- the X-BLEED selector switch is in the SHUT position.
- The ANTI ICE pushbutton switches are off (the ON legends are off).
C. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(3) On AIR COND panel 30VU, make sure that:
4. Procedure(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(3) On AIR COND panel 30VU, make sure that:
- The PACK 1 and PACK 2 pushbutton switches are off (OFF legends are on).
- The ENG BLEED pushbutton switches are off (OFF legends are on).
- The X-BLEED selector switch is in the SHUT position.
- The ANTI ICE pushbutton switches are off (ON legends are off).
- The HOT AIR pushbutton switch is off (OFF legend is on).
Subtask 36-12-00-720-052-A
A. Leak Check of the Bleed Air Ducting
(a) Start the APU:
(c) On the BLEED page of the lower ECAM DU, make sure that the APU bleed-air supply is correct.
(2) Pressurization of the bleed air system with the HP ground connector (7300HM):
(a) Do the pressurization of the bleed system through the HP ground connector (Ref. AMM TASK 36-12-00-860-002).
(3) At the APU bleed-air ducts, make sure that there are no leaks, specially from the clamps and the connections.
(4) If you find a leak:
(a) Remove the related bleed air duct (Ref. AMM TASK 36-12-41-000-001).
(b) Replace the related duct seals (Ref. AMM TASK 36-12-41-400-001) and (Ref. AMM TASK 20-26-00-910-002).
(c) Install the bleed air duct (Ref. AMM TASK 36-12-41-400-001).
5. Close-upNOTE: You can do the leak test of the bleed air ducting with the APU or with the Ground Connector - HP (7300HM).
(1) Pressurization of the bleed air system with the APU: (a) Start the APU:
- For GTCP 36-300 APU, (Ref. AMM D/O 49-00-00-86)
- For APS 3200 APU, (Ref. AMM TASK 49-00-00-860-005)
- For 131-9(A) APU, (Ref. AMM TASK 49-00-00-860-008).
NOTE: After the APU starts, Airbus recommends you to wait for a minimum of 3 minutes for the warm up period, before you select the APU BLEED.
(b) On AIR COND panel 30VU, push the APU BLEED pushbutton-switch (the ON legend comes on). (c) On the BLEED page of the lower ECAM DU, make sure that the APU bleed-air supply is correct.
(2) Pressurization of the bleed air system with the HP ground connector (7300HM):
(a) Do the pressurization of the bleed system through the HP ground connector (Ref. AMM TASK 36-12-00-860-002).
(3) At the APU bleed-air ducts, make sure that there are no leaks, specially from the clamps and the connections.
(4) If you find a leak:
(a) Remove the related bleed air duct (Ref. AMM TASK 36-12-41-000-001).
(b) Replace the related duct seals (Ref. AMM TASK 36-12-41-400-001) and (Ref. AMM TASK 20-26-00-910-002).
(c) Install the bleed air duct (Ref. AMM TASK 36-12-41-400-001).
Subtask 36-12-00-860-063-A
A. Put the aircraft back to the serviceable condition.
(a) On the AIR COND panel 30VU, push the APU BLEED P/BSW (the OFF legend comes on).
(b) Stop the APU:
(2) Stop the pressurization of the bleed air ducting with the HP ground connector (7300HM) (Ref. AMM TASK 36-12-00-860-002).
(3) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(4) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
Subtask 36-12-00-410-054-A ** ON A/C NOT FOR ALL NOTE: It is necessary to do the applicable depressurization procedure for the APU or the Ground Connector - HP (7300HM).
(1) Stop the pressurization of the bleed air ducting with the APU: (a) On the AIR COND panel 30VU, push the APU BLEED P/BSW (the OFF legend comes on).
(b) Stop the APU:
- For a GTCP 36-300 APU, (Ref. AMM D/O 49-00-00-86)
- For an APS 3200 APU, (Ref. AMM TASK 49-00-00-860-006)
- For a 131-9(A) APU, (Ref. AMM TASK 49-00-00-860-009).
(2) Stop the pressurization of the bleed air ducting with the HP ground connector (7300HM) (Ref. AMM TASK 36-12-00-860-002).
(3) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(4) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
B. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) For the APU bleed-air ducts between FR34 and FR36:
(a) Install the access panels 191BB, 191EB, 192FB and 192EB (Ref. AMM TASK 53-35-13-400-002).
(b) Remove the ACCESS PLATFORM 2M (6 FT) from below the access panels 191BB, 191EB, 192FB and 192EB.
(3) For the APU bleed-air ducts between FR36 and FR42:
(a) Install the access panels 191JB, 192KB and 196AB (Ref. AMM TASK 53-35-13-400-001).
(b) Remove the ACCESS PLATFORM 2M (6 FT) from below the access panels 191JB, 192KB and 196AB.
(4) For the APU bleed-air ducts between FR42 and FR50:
(a) Install the access panels 147AB, 147EB, 147FB and 197BB (Ref. AMM TASK 53-35-13-400-001).
(b) Remove the ACCESS PLATFORM 2M (6 FT) from below the access panels 147AB, 147EB, 147FB and 197BB.
(5) Remove the WARNING NOTICE(S).
Subtask 36-12-00-410-054-B ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) For the APU bleed-air ducts between FR34 and FR36:
(a) Install the access panels 191BB, 191EB, 192FB and 192EB (Ref. AMM TASK 53-35-13-400-002).
(b) Remove the ACCESS PLATFORM 2M (6 FT) from below the access panels 191BB, 191EB, 192FB and 192EB.
(3) For the APU bleed-air ducts between FR36 and FR42:
(a) Install the access panels 191JB, 192KB and 196AB (Ref. AMM TASK 53-35-13-400-001).
(b) Remove the ACCESS PLATFORM 2M (6 FT) from below the access panels 191JB, 192KB and 196AB.
(4) For the APU bleed-air ducts between FR42 and FR50:
(a) Install the access panels 147AB, 147EB, 147FB and 197BB (Ref. AMM TASK 53-35-13-400-001).
(b) Remove the ACCESS PLATFORM 2M (6 FT) from below the access panels 147AB, 147EB, 147FB and 197BB.
(5) Remove the WARNING NOTICE(S).
B. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) For the APU bleed-air ducts between FR35.5 and FR36:
(a) Install the access panels 191BB, 191EB, 192FB and 192EB (Ref. AMM TASK 53-35-13-400-002).
(b) Remove the ACCESS PLATFORM 2M (6 FT) from below the access panels 191BB, 191EB, 192FB and 192EB.
(3) For the APU bleed-air ducts between FR36 and FR42:
(a) Install the access panels 191JB, 192KB and 196AB (Ref. AMM TASK 53-35-13-400-001).
(b) Remove the ACCESS PLATFORM 2M (6 FT) from below the access panels 191JB, 192KB and 196AB.
(4) For the APU bleed-air ducts between FR42 and FR47.3:
(a) Install the access panels 147AB, 147EB, 147FB and 197KB (Ref. AMM TASK 53-35-13-400-001).
(b) Remove the ACCESS PLATFORM 2M (6 FT) from below the access panels 147AB, 147EB, 147FB and 197KB.
(5) Remove the WARNING NOTICE(S).
Subtask 36-12-00-410-054-C ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) For the APU bleed-air ducts between FR35.5 and FR36:
(a) Install the access panels 191BB, 191EB, 192FB and 192EB (Ref. AMM TASK 53-35-13-400-002).
(b) Remove the ACCESS PLATFORM 2M (6 FT) from below the access panels 191BB, 191EB, 192FB and 192EB.
(3) For the APU bleed-air ducts between FR36 and FR42:
(a) Install the access panels 191JB, 192KB and 196AB (Ref. AMM TASK 53-35-13-400-001).
(b) Remove the ACCESS PLATFORM 2M (6 FT) from below the access panels 191JB, 192KB and 196AB.
(4) For the APU bleed-air ducts between FR42 and FR47.3:
(a) Install the access panels 147AB, 147EB, 147FB and 197KB (Ref. AMM TASK 53-35-13-400-001).
(b) Remove the ACCESS PLATFORM 2M (6 FT) from below the access panels 147AB, 147EB, 147FB and 197KB.
(5) Remove the WARNING NOTICE(S).
B. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) For the APU bleed-air ducts between FR34 and FR36:
(a) Install the access panels 191BB, 191EB, 192FB and 192EB (Ref. AMM TASK 53-35-13-400-002).
(b) Remove the ACCESS PLATFORM 2M (6 FT) from below the access panels 191BB, 191EB, 192FB and 192EB.
(3) For the APU bleed-air ducts between FR36 and FR42:
(a) Install the access panels 191JB, 192KB and 196AB (Ref. AMM TASK 53-35-13-400-001).
(b) Remove the ACCESS PLATFORM 2M (6 FT) from below the access panels 191JB, 192KB and 196AB.
(4) For the APU bleed-air ducts between FR42 and FR54:
(a) Install the access panels 147AB, 147EB, 147FB and 197BB (Ref. AMM TASK 53-35-13-400-001).
(b) Remove the ACCESS PLATFORM 2M (6 FT) from below the access panels 147AB, 147EB, 147FB and 197BB.
(5) Remove the WARNING NOTICE(S).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) For the APU bleed-air ducts between FR34 and FR36:
(a) Install the access panels 191BB, 191EB, 192FB and 192EB (Ref. AMM TASK 53-35-13-400-002).
(b) Remove the ACCESS PLATFORM 2M (6 FT) from below the access panels 191BB, 191EB, 192FB and 192EB.
(3) For the APU bleed-air ducts between FR36 and FR42:
(a) Install the access panels 191JB, 192KB and 196AB (Ref. AMM TASK 53-35-13-400-001).
(b) Remove the ACCESS PLATFORM 2M (6 FT) from below the access panels 191JB, 192KB and 196AB.
(4) For the APU bleed-air ducts between FR42 and FR54:
(a) Install the access panels 147AB, 147EB, 147FB and 197BB (Ref. AMM TASK 53-35-13-400-001).
(b) Remove the ACCESS PLATFORM 2M (6 FT) from below the access panels 147AB, 147EB, 147FB and 197BB.
(5) Remove the WARNING NOTICE(S).