W DOC AIRBUS | AMM A320F

Leak Check of Bleed Air Ducting in the Fuselage Area between the APU Bleed Check Valve, Air Conditioning Pack and Wing/Fuselage Connection


TASK 36-12-00-790-003-A
Leak Check of Bleed Air Ducting in the Fuselage Area between the APU Bleed Check Valve, Air Conditioning Pack and Wing/Fuselage Connection


WARNING: MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
ZONE: 150
ZONE: 160
ZONE: 190
ZONE: 310
1. Reason for the Job
Refer to the MPD TASK: 361200-03
LEAK CHECK OF BLEED AIR DUCTING IN FUSELAGE AREA BETWEEN APU BLEED CHECK VALVE, AIR CONDITIONING PACK AND WING/FUSELAGE CONNECTION
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 2M (6 FT)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
150
AFT CARGO COMPARTMENT FWD PRESS BULKHEAD TO AFT BULKHEAD OF AFT CARGO COMPARTMENT
160
BULK CARGO COMPARTMENT AFT BULKHEAD OF AFT CARGO COMPARTMENT TO AFT BULKHEAD OF BULK CARGO COMPARTMENT
190
BELLY FAIR, AIR CONDITIONING & HYD COMPT
310
FUSLG TAIL SECTION AFT OF AFT PRESS BHD
147AB, 147EB, 147FB, 191BB, 191EB, 191JB, 192EB, 192FB, 192KB, 196AB
197KB
197BB
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 31-60-00-860-001-A
EIS Start Procedure
TASK 31-60-00-860-002-A
EIS Stop Procedure
TASK 36-12-00-860-002-A
Pressurization of the Bleed System through the HP Ground Connector
TASK 36-12-41-000-001-A
Removal of a Bleed-Air Duct
TASK 36-12-41-400-001-A
Installation of a Bleed-Air Duct
TASK 49-00-00-860-005-A
APU Start by External Power
TASK 49-00-00-860-005-A-01
APU Start by Batteries
TASK 49-00-00-860-006-A
APU Shutdown by External Power
TASK 49-00-00-860-006-A-01
APU Shutdown by Batteries
TASK 49-00-00-860-008-A
APU Start by External Power
TASK 49-00-00-860-008-A-01
APU Start by Batteries
TASK 49-00-00-860-009-A
APU Shutdown by External Power (131-9(A))
TASK 49-00-00-860-009-A-01
APU Shutdown by Batteries (131-9(A))
TASK 53-35-13-000-001-A
Removal of the Belly Fairing Access Panels
TASK 53-35-13-000-002-A
Removal of the Quick-Release Access Panels from the Belly Fairing Structure
TASK 53-35-13-400-001-A
Installation of the Belly Fairing Access Panels
TASK 53-35-13-400-002-A
Installation of the Quick-Release Access Panels on the Belly Fairing Structure
TASK 20-26-00-910-002-A
Installation of Expansion Joints (for corrective action)
F APU Bleed Air Ducts - Access ** ON A/C NOT FOR ALL
F APU Bleed Air Ducts - Access ** ON A/C NOT FOR ALL
F APU Bleed Air Ducts - Access ** ON A/C NOT FOR ALL
F APU Bleed Air Ducts - Access ** ON A/C NOT FOR ALL
F APU Bleed Air Ducts - Access ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 36-12-00-010-054-A ** ON A/C NOT FOR ALL
A. Get Access
F APU Bleed Air Ducts - Access ** ON A/C NOT FOR ALL
F APU Bleed Air Ducts - Access ** ON A/C NOT FOR ALL
   (1) Get access to the APU bleed-air ducts between FR34 and FR36.
     (a) Put the ACCESS PLATFORM 2M (6 FT) in position below the access panels 191BB, 191EB 192FB and 192EB.
     (b) Remove the access panels 191BB, 191EB, 192FB and 192EB (Ref. AMM TASK 53-35-13-000-002).
   (2) Get access to the APU bleed-air ducts between FR36 and FR42.
     (a) Put the ACCESS PLATFORM 2M (6 FT) in position below the access panels 191JB, 192KB and 196AB.
     (b) Remove the access panel 191JB, 192KB and 196AB (Ref. AMM TASK 53-35-13-000-001).
   (3) Get access to the APU bleed-air ducts between FR42 and FR50.
     (a) Put the ACCESS PLATFORM 2M (6 FT) in position below the access panels 147AB, 147EB, 147FB and 197BB.
     (b) Remove the access panels 147AB, 147EB, 147FB and 197BB (Ref. AMM TASK 53-35-13-000-001).
Subtask 36-12-00-010-054-B ** ON A/C NOT FOR ALL
A. Get Access
F APU Bleed Air Ducts - Access ** ON A/C NOT FOR ALL
F APU Bleed Air Ducts - Access ** ON A/C NOT FOR ALL
   (1) Get access to the APU bleed-air ducts between FR35.5 and FR36.
     (a) Put the ACCESS PLATFORM 2M (6 FT) in position below the access panels 191BB, 191EB, 192FB and 192EB.
     (b) Remove the access panels 191BB, 191EB, 192FB and 192EB (Ref. AMM TASK 53-35-13-000-002).
   (2) Get access to the APU bleed-air ducts between FR36 and FR42.
     (a) Put the ACCESS PLATFORM 2M (6 FT) in position below the access panels 191JB, 192KB and 196AB.
     (b) Remove the access panels 191JB, 192KB and 196AB (Ref. AMM TASK 53-35-13-000-001).
   (3) Get access to the APU bleed-air ducts between FR42 and FR47.3.
     (a) Put the ACCESS PLATFORM 2M (6 FT) in position below the access panels 147AB, 147EB, 147FB and 197KB.
     (b) Remove the access panels 147AB, 147EB, 147FB and 197KB (Ref. AMM TASK 53-35-13-000-001).
Subtask 36-12-00-010-054-C ** ON A/C NOT FOR ALL
A. Get Access
F APU Bleed Air Ducts - Access ** ON A/C NOT FOR ALL
   (1) Get access to the APU bleed-air ducts between FR34 and FR36.
     (a) Put the ACCESS PLATFORM 2M (6 FT) in position below the access panels 191BB, 191EB, 192FB and 192EB.
     (b) Remove the access panels 191BB, 191EB, 192FB and 192EB (Ref. AMM TASK 53-35-13-000-002).
   (2) Get access to the APU bleed-air ducts between FR36 and FR42.
     (a) Put the ACCESS PLATFORM 2M (6 FT) in position below the access panels 191JB, 192KB and 196AB.
     (b) Remove the access panel 191JB, 192KB and 196AB (Ref. AMM TASK 53-35-13-000-001).
   (3) Get access to the APU bleed-air ducts between FR42 and FR54.
     (a) Put the ACCESS PLATFORM 2M (6 FT) in position below the access panels 147AB, 147EB, 147FB and 197BB.
     (b) Remove the access panels 147AB, 147EB, 147FB and 197BB (Ref. AMM TASK 53-35-13-000-001).
Subtask 36-12-00-865-057-A
B. Make sure that this(these) circuit breaker(s) is(are) closed:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUAIR BLEED/ENG 1/CTL3HA1D12
49VUAIR BLEED/ENG 1/MONG2HA1D11
** ON A/C ALL
49VUAIR BLEED/X FEED/VALVE/BAT2HVD13
** ON A/C NOT FOR ALL
49VUAIR BLEED/ENG 2/MONG3HA2D12
49VUAIR BLEED/ENG 1/CTL2HA1D11
** ON A/C ALL
121VUAPU/APU/CTL2KDL42
121VUAPU/ECB/SPLY1KDL41
** ON A/C NOT FOR ALL
122VUAIR BLEED/ENG 2/CTL3HA2Z23
122VUAIR BLEED/ENG 2/MONG2HA2Z22
** ON A/C ALL
122VUAIR BLEED/X FEED VALVE/NORM1HVZ20
** ON A/C NOT FOR ALL
122VUAIR BLEED/ENG 1/MONG3HA1Z23
122VUAIR BLEED/ENG 2/CTL2HA2Z22
Subtask 36-12-00-860-062-A ** ON A/C NOT FOR ALL
C. Aircraft Maintenance Configuration
   (1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
   (2) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
   (3) On the AIR COND panel 30VU, make sure that:
  • The OFF legends on the PACK 1 and PACK 2 pushbutton switches are on,
  • the OFF legends of the ENG BLEED pushbutton switches are on,
  • the X-BLEED selector switch is in the SHUT position.
   (4) On the ANTI ICE panel 25VU, make sure that:
  • The ANTI ICE pushbutton switches are off (the ON legends are off).
Subtask 36-12-00-860-062-B ** ON A/C NOT FOR ALL
C. Aircraft Maintenance Configuration
   (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
   (2) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
   (3) On AIR COND panel 30VU, make sure that:
  • The PACK 1 and PACK 2 pushbutton switches are off (OFF legends are on).
  • The ENG BLEED pushbutton switches are off (OFF legends are on).
  • The X-BLEED selector switch is in the SHUT position.
   (4) On ANTI ICE panel 25VU, make sure that:
  • The ANTI ICE pushbutton switches are off (ON legends are off).
   (5) On CARGO HEAT panel 22VU, make sure that:
  • The HOT AIR pushbutton switch is off (OFF legend is on).
4. Procedure
Subtask 36-12-00-720-052-A
A. Leak Check of the Bleed Air Ducting
NOTE: You can do the leak test of the bleed air ducting with the APU or with the Ground Connector - HP (7300HM).
   (1) Pressurization of the bleed air system with the APU:
     (a) Start the APU:
NOTE: After the APU starts, Airbus recommends you to wait for a minimum of 3 minutes for the warm up period, before you select the APU BLEED.
     (b) On AIR COND panel 30VU, push the APU BLEED pushbutton-switch (the ON legend comes on).
     (c) On the BLEED page of the lower ECAM DU, make sure that the APU bleed-air supply is correct.
   (2) Pressurization of the bleed air system with the HP ground connector (7300HM):
     (a) Do the pressurization of the bleed system through the HP ground connector (Ref. AMM TASK 36-12-00-860-002).
   (3) At the APU bleed-air ducts, make sure that there are no leaks, specially from the clamps and the connections.
   (4) If you find a leak:
     (a) Remove the related bleed air duct (Ref. AMM TASK 36-12-41-000-001).
     (b) Replace the related duct seals (Ref. AMM TASK 36-12-41-400-001) and (Ref. AMM TASK 20-26-00-910-002).
     (c) Install the bleed air duct (Ref. AMM TASK 36-12-41-400-001).
5. Close-up
Subtask 36-12-00-860-063-A
A. Put the aircraft back to the serviceable condition.
NOTE: It is necessary to do the applicable depressurization procedure for the APU or the Ground Connector - HP (7300HM).
   (1) Stop the pressurization of the bleed air ducting with the APU:
     (a) On the AIR COND panel 30VU, push the APU BLEED P/BSW (the OFF legend comes on).
     (b) Stop the APU:
     (c) On the AIR COND panel 30VU, set the X-BLEED selector switch to the AUTO position.
   (2) Stop the pressurization of the bleed air ducting with the HP ground connector (7300HM) (Ref. AMM TASK 36-12-00-860-002).
   (3) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
   (4) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
Subtask 36-12-00-410-054-A ** ON A/C NOT FOR ALL
B. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) For the APU bleed-air ducts between FR34 and FR36:
     (a) Install the access panels 191BB, 191EB, 192FB and 192EB (Ref. AMM TASK 53-35-13-400-002).
     (b) Remove the ACCESS PLATFORM 2M (6 FT) from below the access panels 191BB, 191EB, 192FB and 192EB.
   (3) For the APU bleed-air ducts between FR36 and FR42:
     (a) Install the access panels 191JB, 192KB and 196AB (Ref. AMM TASK 53-35-13-400-001).
     (b) Remove the ACCESS PLATFORM 2M (6 FT) from below the access panels 191JB, 192KB and 196AB.
   (4) For the APU bleed-air ducts between FR42 and FR50:
     (a) Install the access panels 147AB, 147EB, 147FB and 197BB (Ref. AMM TASK 53-35-13-400-001).
     (b) Remove the ACCESS PLATFORM 2M (6 FT) from below the access panels 147AB, 147EB, 147FB and 197BB.
   (5) Remove the WARNING NOTICE(S).
Subtask 36-12-00-410-054-B ** ON A/C NOT FOR ALL
B. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) For the APU bleed-air ducts between FR35.5 and FR36:
     (a) Install the access panels 191BB, 191EB, 192FB and 192EB (Ref. AMM TASK 53-35-13-400-002).
     (b) Remove the ACCESS PLATFORM 2M (6 FT) from below the access panels 191BB, 191EB, 192FB and 192EB.
   (3) For the APU bleed-air ducts between FR36 and FR42:
     (a) Install the access panels 191JB, 192KB and 196AB (Ref. AMM TASK 53-35-13-400-001).
     (b) Remove the ACCESS PLATFORM 2M (6 FT) from below the access panels 191JB, 192KB and 196AB.
   (4) For the APU bleed-air ducts between FR42 and FR47.3:
     (a) Install the access panels 147AB, 147EB, 147FB and 197KB (Ref. AMM TASK 53-35-13-400-001).
     (b) Remove the ACCESS PLATFORM 2M (6 FT) from below the access panels 147AB, 147EB, 147FB and 197KB.
   (5) Remove the WARNING NOTICE(S).
Subtask 36-12-00-410-054-C ** ON A/C NOT FOR ALL
B. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) For the APU bleed-air ducts between FR34 and FR36:
     (a) Install the access panels 191BB, 191EB, 192FB and 192EB (Ref. AMM TASK 53-35-13-400-002).
     (b) Remove the ACCESS PLATFORM 2M (6 FT) from below the access panels 191BB, 191EB, 192FB and 192EB.
   (3) For the APU bleed-air ducts between FR36 and FR42:
     (a) Install the access panels 191JB, 192KB and 196AB (Ref. AMM TASK 53-35-13-400-001).
     (b) Remove the ACCESS PLATFORM 2M (6 FT) from below the access panels 191JB, 192KB and 196AB.
   (4) For the APU bleed-air ducts between FR42 and FR54:
     (a) Install the access panels 147AB, 147EB, 147FB and 197BB (Ref. AMM TASK 53-35-13-400-001).
     (b) Remove the ACCESS PLATFORM 2M (6 FT) from below the access panels 147AB, 147EB, 147FB and 197BB.
   (5) Remove the WARNING NOTICE(S).
[Rev.10 from 2021] 2026.04.01 01:15:25 UTC