Functional Test of the Bleed-Pressure-Regulator Valve Control-Solenoid
TASK 36-11-55-720-001-A
Functional Test of the Bleed-Pressure-Regulator Valve Control-Solenoid
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 36-11-55-861-051-A ** ON A/C NOT FOR ALL Subtask 36-11-55-941-053-A ** ON A/C NOT FOR ALL
Subtask 36-11-55-720-051-A ** ON A/C NOT FOR ALL
Subtask 36-11-55-410-051-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 01:14:01 UTC
Functional Test of the Bleed-Pressure-Regulator Valve Control-Solenoid
FIN: 10HA1 ** ON A/C NOT FOR ALL
FIN: 10HA2 ** ON A/C NOT FOR ALL
FIN: 1000EM1 ** ON A/C NOT FOR ALL
FIN: 1000EM2 ** ON A/C NOT FOR ALL
1. Reason for the JobFIN: 10HA2 ** ON A/C NOT FOR ALL
FIN: 1000EM1 ** ON A/C NOT FOR ALL
FIN: 1000EM2 ** ON A/C NOT FOR ALL
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [10HA1] (SOLENOID-BLEED PRESS REG V CTL, ENG 1) | |
| 413DT | |
| 413CL, 413DL, 414CR | |
| FOR [10HA2] (SOLENOID-BLEED PRESS REG V CTL, ENG 2) | |
| 423CL, 423DL, 424CR | |
| 423DT | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
Subtask 36-11-55-861-051-A ** ON A/C NOT FOR ALL Subtask 36-11-55-941-053-A ** ON A/C NOT FOR ALL
B. Safety Precautions
(1) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(2) On the AIR COND panel 30VU:
Subtask 36-11-55-865-055-A ** ON A/C NOT FOR ALL (1) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(2) On the AIR COND panel 30VU:
- make sure that the ENG 1(2) BLEED pushbutton switch is released (the OFF legend is on),
- make sure that the APU BLEED pushbutton switch is released (the ON legend is off),
- put a WARNING NOTICE(S) to tell persons not to operate the pneumatic system.
- put a WARNING NOTICE(S) to tell persons not to start the engine 1(2).
- Put a WARNING NOTICE(S) to tell persons not to pressurize the pneumatic system.
- make sure that the ON legend of the ENG/FADEC GND PWR 1(2) pushbutton switch is off,
- put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
C. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 36-11-55-010-052-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/X FEED/VALVE/BAT | 2HV | D13 |
| 49VU | AIR BLEED/ENG 1/CTL | 3HA1 | D12 |
| 49VU | AIR BLEED/ENG 1/MONG | 2HA1 | D11 |
| 122VU | AIR BLEED/ENG 2/CTL | 3HA2 | Z23 |
| 122VU | AIR BLEED/ENG 2/MONG | 2HA2 | Z22 |
| 122VU | AIR BLEED/X FEED VALVE/NORM | 1HV | Z20 |
D. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the related pylon access panel.
(2) Remove these access panels:
(a) FOR [10HA1] (SOLENOID-BLEED PRESS REG V CTL, ENG 1)
413CL 414CR 413DL
(b) FOR [10HA2] (SOLENOID-BLEED PRESS REG V CTL, ENG 2)
Subtask 36-11-55-010-052-B ** ON A/C NOT FOR ALL (1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the related pylon access panel.
(2) Remove these access panels:
(a) FOR [10HA1] (SOLENOID-BLEED PRESS REG V CTL, ENG 1)
413CL 414CR 413DL
(b) FOR [10HA2] (SOLENOID-BLEED PRESS REG V CTL, ENG 2)
D. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the related pylon access panel.
(2) Remove the access panel:
(a) FOR [10HA1] (SOLENOID-BLEED PRESS REG V CTL, ENG 1)
413DT
(b) FOR [10HA2] (SOLENOID-BLEED PRESS REG V CTL, ENG 2)
423DT.
4. Procedure(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the related pylon access panel.
(2) Remove the access panel:
(a) FOR [10HA1] (SOLENOID-BLEED PRESS REG V CTL, ENG 1)
413DT
(b) FOR [10HA2] (SOLENOID-BLEED PRESS REG V CTL, ENG 2)
423DT.
Subtask 36-11-55-720-051-A ** ON A/C NOT FOR ALL
A. Functional Test of the Bleed-Pressure-Regulator Valve Control-Solenoid
(1) On the panel 30VU:
5. Close-up(1) On the panel 30VU:
- push and release the ENG 1(2) BLEED pushbutton switch and, on the related engine pylon, make sure that you hear clicks on the solenoid of the bleed-pressure-regulator valve control-solenoid.
Subtask 36-11-55-410-051-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install these access panels:
(a) FOR [10HA1] (SOLENOID-BLEED PRESS REG V CTL, ENG 1)
413CL 414CR 413DL
(b) FOR [10HA2] (SOLENOID-BLEED PRESS REG V CTL, ENG 2)
423CL 424CR 423DL.
(3) Remove the WARNING NOTICE(S).
(4) Remove the access platform(s).
Subtask 36-11-55-410-051-B ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install these access panels:
(a) FOR [10HA1] (SOLENOID-BLEED PRESS REG V CTL, ENG 1)
413CL 414CR 413DL
(b) FOR [10HA2] (SOLENOID-BLEED PRESS REG V CTL, ENG 2)
423CL 424CR 423DL.
(3) Remove the WARNING NOTICE(S).
(4) Remove the access platform(s).
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panel:
(a) FOR [10HA1] (SOLENOID-BLEED PRESS REG V CTL, ENG 1)
413DT
(b) FOR [10HA2] (SOLENOID-BLEED PRESS REG V CTL, ENG 2)
423DT.
(3) Remove the WARNING NOTICE(S).
(4) Remove the access platform(s).
Subtask 36-11-55-862-051-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panel:
(a) FOR [10HA1] (SOLENOID-BLEED PRESS REG V CTL, ENG 1)
413DT
(b) FOR [10HA2] (SOLENOID-BLEED PRESS REG V CTL, ENG 2)
423DT.
(3) Remove the WARNING NOTICE(S).
(4) Remove the access platform(s).