Functional Test of the Opening of the Bleed-Pressure Regulator Valve (PRV) with the Bleed Test Set P/N 98L36103002000 and the Universal Test Port Tool
TASK 36-11-52-720-010-A-03
Functional Test of the Opening of the Bleed-Pressure Regulator Valve (PRV) with the Bleed Test Set P/N 98L36103002000 and the Universal Test Port Tool
This functional test checks the opening of the bleed-pressure regulator valve. With the universal test port tool, it can apply to all types of valves.
The universal test port tool has two sides, red and blue.
Only one of the sides of this tool can be used to check each valve type.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 36-11-52-861-089-B ** ON A/C NOT FOR ALL Subtask 36-11-52-941-095-B ** ON A/C NOT FOR ALL
Subtask 36-11-52-480-081-B ** ON A/C NOT FOR ALL
Subtask 36-11-52-410-138-B ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 01:13:03 UTC
Functional Test of the Opening of the Bleed-Pressure Regulator Valve (PRV) with the Bleed Test Set P/N 98L36103002000 and the Universal Test Port Tool
WARNING:
MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START WORK. PRESSURIZED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
BE CAREFUL WHEN YOU DO WORK ON THE ENGINE PARTS AFTER THE ENGINE SHUTDOWN. USE APPLICABLE THERMAL GLOVES. THE ENGINE PARTS CAN STAY HOT FOR ONE HOUR AFTER SHUTDOWN AND CAN BURN YOU.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
FIN: 1000EM1 ** ON A/C NOT FOR ALL
FIN: 1000EM2 ** ON A/C NOT FOR ALL
FIN: 4001HA ** ON A/C NOT FOR ALL
1. Reason for the JobFIN: 1000EM2 ** ON A/C NOT FOR ALL
FIN: 4001HA ** ON A/C NOT FOR ALL
This functional test checks the opening of the bleed-pressure regulator valve. With the universal test port tool, it can apply to all types of valves.
The universal test port tool has two sides, red and blue.
Only one of the sides of this tool can be used to check each valve type.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 1M(3 FT) |
| No specific | AR | WARNING NOTICE(S) |
| No specific | Torque wrench: range to between 0.80 and 0.65 m.daN (70.80 and 57.52 lbf.in ) ![]() | |
| No specific | Torque wrench: range to between 1.2 and 1 m.daN (106.19 and 88.50 lbf.in ) ![]() | |
| 98L36103002000 | 1 | TEST SET - ENGINE BLEED |
| M82000879 | 1 | TEST PORT UNIVERSAL |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.14QFB1) | Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [1000EM1] (ENGINE-1) | |
| 437AL, 438AR, 451AL, 452AR | |
| FOR [1000EM2] (ENGINE-2) | |
| 447AL, 448AR, 461AL, 462AR | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 71-13-00-010-010-A | Opening of the Fan Cowls 437AL(447AL),438AR(448AR) |
| TASK 71-13-00-410-010-A | Closing of the Fan Cowls 437AL(447AL),438AR(448AR) |
| TASK 78-30-00-040-012-A | Deactivation of the Thrust Reverser Hydraulic Control Unit (HCU) for Ground Maintenance |
| TASK 78-30-00-440-012-A | Re-activation of the Thrust Reverser Hydraulic Control Unit (HCU) after Ground Maintenance |
| TASK 78-32-00-010-010-A | Opening of the Thrust Reverser Halves |
| TASK 78-32-00-410-010-A | Closing of the Thrust Reverser Halves |
Subtask 36-11-52-861-089-B ** ON A/C NOT FOR ALL Subtask 36-11-52-941-095-B ** ON A/C NOT FOR ALL
B. Safety Precautions
(1) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(2) On the AIR COND panel 30VU:
Subtask 36-11-52-010-145-B ** ON A/C NOT FOR ALL (1) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(2) On the AIR COND panel 30VU:
- Make sure that the ENG 1(2) BLEED pushbutton switch is released (the OFF legend is on).
- Make sure that the APU BLEED pushbutton switch is released (the ON legend is off).
- Put a WARNING NOTICE(S) in position to tell persons not to operate the pneumatic system.
- Put a WARNING NOTICE(S) in position to tell persons not to start the engine 1(2).
- Put a WARNING NOTICE(S) in position to tell persons not to pressurize the pneumatic system.
- Make sure that the ON legend of the ENG/FADEC GND PWR 1(2) pushbutton switch is off.
- Put a WARNING NOTICE(S) in position to tell persons not to energize the FADEC 1(2).
C. Get Access
(1) Open the fan cowls (Ref. AMM TASK 71-13-00-010-010):
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR.
(2) Put the ACCESS PLATFORM 1M(3 FT) in position below the engine.
Subtask 36-11-52-040-104-B ** ON A/C NOT FOR ALL (1) Open the fan cowls (Ref. AMM TASK 71-13-00-010-010):
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR.
(2) Put the ACCESS PLATFORM 1M(3 FT) in position below the engine.
D. Deactivation of the Thrust Reverser
Subtask 36-11-52-010-146-B ** ON A/C NOT FOR ALL WARNING:
MAKE SURE THAT THE THRUST REVERSER HYDRAULIC CONTROL UNIT (HCU) IS DEACTIVATED BEFORE YOU DO WORK ON OR AROUND THE THRUST REVERSER. IF THE HCU IS NOT DEACTIVATED, THERE IS A RISK OF UNWANTED THRUST REVERSER OPERATION WHICH CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
(1) Do the deactivation of the Thrust-Reverser Hydraulic Control-Unit (HCU) (Ref. AMM TASK 78-30-00-040-012). E. Get Access
(1) Open the thrust reverser halves (Ref. AMM TASK 78-32-00-010-010):
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR.
4. Procedure(1) Open the thrust reverser halves (Ref. AMM TASK 78-32-00-010-010):
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR.
Subtask 36-11-52-480-081-B ** ON A/C NOT FOR ALL
A. Installation of the Tool
(2) Remove the blanking cap from the test port.
(3) Connect a M82000879 TEST PORT UNIVERSAL:
Connection of the Universal Test Port Tool (Red Side) with the Bleed Test Set P/N 98L36103002000 ** ON A/C NOT FOR ALL
1 If you can install the red side of the tool:
a Remove the blue blanking cap from the blue side of the M82000879 TEST PORT UNIVERSAL.
b Install the blue blanking cap on the red side of the M82000879 TEST PORT UNIVERSAL.
c Tighten the blue blanking cap with your hand.
d Install the blue side of the M82000879 TEST PORT UNIVERSAL on the test port of the bleed-pressure regulator valve.
Connection of the Universal Test Port Tool (Blue Side) with the Bleed Test Set P/N 98L36103002000 ** ON A/C NOT FOR ALL
e Tighten the M82000879 TEST PORT UNIVERSAL on the bleed-pressure regulator valve with your hand.
(4) Close the shutoff valve, the purge valve and the pressure regulator valve on the test set.
(6) Connection of the test set
(7) Do a reset of the digital pressure gage.
(8) Do the test:
(a) If you installed the red side of the tool, do the test given in paragraph 4.B.
(b) If you installed the blue side of the tool, do the test given in paragraph 4.C.
(9) Make sure that the regulator valve of the test set is closed before pressurize the system.
Subtask 36-11-52-720-073-B ** ON A/C NOT FOR ALL WARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
(1) Cut, remove and discard the lockwire between the blanking cap and the test port of the bleed-pressure regulator valve. (2) Remove the blanking cap from the test port.
(3) Connect a M82000879 TEST PORT UNIVERSAL:
CAUTION:
ALWAYS TRY TO INSTALL THE RED SIDE OF THE UNIVERSAL TEST PORT TOOL FIRST. IF YOU CANNOT INSTALL THE RED SIDE, INSTALL THE BLUE SIDE.
(a) Install the red side of the M82000879 TEST PORT UNIVERSAL on the test port of the bleed-pressure regulator valve.
Connection of the Universal Test Port Tool (Red Side) with the Bleed Test Set P/N 98L36103002000 ** ON A/C NOT FOR ALL - Make sure that the blue blanking cap of the M82000879 TEST PORT UNIVERSAL is correctly tightened on the blue port,
- Go to step 4.A.(4).
a Remove the blue blanking cap from the blue side of the M82000879 TEST PORT UNIVERSAL.
b Install the blue blanking cap on the red side of the M82000879 TEST PORT UNIVERSAL.
c Tighten the blue blanking cap with your hand.
d Install the blue side of the M82000879 TEST PORT UNIVERSAL on the test port of the bleed-pressure regulator valve.
Connection of the Universal Test Port Tool (Blue Side) with the Bleed Test Set P/N 98L36103002000 ** ON A/C NOT FOR ALL (4) Close the shutoff valve, the purge valve and the pressure regulator valve on the test set.
WARNING:
MAKE SURE THAT THE PRESSURE SUPPLIED TO BLEED TEST SET 98L36103002000 NEVER EXCEEDS 217 PSI (15 BAR). IF THE PRESSURE SUPPLIED TO THE BLEED TEST SET EXCEEDS THIS VALUE, THERE IS A RISK OF INJURY TO PERSONNEL AND DAMAGE TO EQUIPMENT.
IF THE AIR CYLINDER DOES NOT HAVE A MANOMETER INSTALLED, YOU MUST INSTALL THE PRIMARY REGULATOR VALVE BETWEEN THE AIR BOTTLE AND BLEED TEST SET 98L36103002000. THE PRIMARY REGULATOR VALVE WILL LIMIT THE PRESSURE IN THE BLEED TEST SET TO 217 PSI (15 BAR).
(5) Connect an air cylinder to the 98L36103002000 TEST SET - ENGINE BLEED. (6) Connection of the test set
CAUTION:
BE CAREFUL WHEN YOU CONNECT/DISCONNECT THE TEST SET TO/FROM THE EQUIPMENT.
THE PRESSURE REGULATING VALVE AND THE PRESSURE GAGE ASSEMBLY OF THE TEST SET ARE HEAVY AND CAN CAUSE DAMAGE TO THE ENGINE.
(a) Connect the 98L36103002000 TEST SET - ENGINE BLEED with the short bend flexible assembly to the M82000879 TEST PORT UNIVERSAL. (7) Do a reset of the digital pressure gage.
(8) Do the test:
(a) If you installed the red side of the tool, do the test given in paragraph 4.B.
(b) If you installed the blue side of the tool, do the test given in paragraph 4.C.
(9) Make sure that the regulator valve of the test set is closed before pressurize the system.
B. Functional Test of the Bleed-Pressure Regulator Valve with the M82000879 TEST PORT UNIVERSAL (Red Side)
Connection of the Universal Test Port Tool (Red Side) with the Bleed Test Set P/N 98L36103002000 ** ON A/C NOT FOR ALL
Subtask 36-11-52-720-081-B ** ON A/C NOT FOR ALL
Connection of the Universal Test Port Tool (Red Side) with the Bleed Test Set P/N 98L36103002000 ** ON A/C NOT FOR ALL | ACTION | RESULT |
|---|---|
1.Pressurize the test set:
| |
2.On the test set:
| On the bleed-pressure regulator valve (4001HA):
|
NOTE: Read the pressure on the digital pressure gage. | |
3.In the cockpit, on the AIR COND panel 30VU:
| On the bleed-pressure regulator valve (4001HA):
|
4.In the cockpit, on the AIR COND panel 30VU:
| On the bleed-pressure regulator valve (4001HA):
|
5.On the test set:
| On the bleed-pressure regulator valve (4001HA):
|
6.In the cockpit, on the AIR COND panel 30VU:
| |
C. Functional Test of the Bleed-Pressure Regulator Valve with the M82000879 TEST PORT UNIVERSAL (Blue Side)
Connection of the Universal Test Port Tool (Blue Side) with the Bleed Test Set P/N 98L36103002000 ** ON A/C NOT FOR ALL
Subtask 36-11-52-080-081-B ** ON A/C NOT FOR ALL
Connection of the Universal Test Port Tool (Blue Side) with the Bleed Test Set P/N 98L36103002000 ** ON A/C NOT FOR ALL | ACTION | RESULT |
|---|---|
1.Pressurize the test set:
| |
| 2.For the bleed-pressure regulator valve (4001HA) with the deactivation screw in position on the regulator (Valve A): A.On the test set:
| On the bleed-pressure regulator valve (4001HA):
|
NOTE: Read the pressure on the digital pressure gage. For the bleed-pressure regulator valve with the deactivation screw in position on the butterfly valve (Valve B): | |
B.On the test set:
| On the bleed-pressure regulator valve (4001HA):
|
NOTE: Read the pressure on the digital pressure gage. | |
3.In the cockpit, on the AIR COND panel 30VU:
| On the bleed-pressure regulator valve (4001HA):
|
4.In the cockpit, on the AIR COND panel 30VU:
| On the bleed-pressure regulator valve (4001HA):
|
5.On the test set:
| On the bleed-pressure regulator valve (4001HA):
|
6.In the cockpit, on the AIR COND panel 30VU:
| |
D. Removal of the Tool
(1) Close the shutoff valve of the air cylinder.
(2) Slowly open the purge valve to depressurize the test set.
(3) Disconnection of the test set
(4) Disconnect the M82000879 TEST PORT UNIVERSAL from the test port of the bleed-pressure regulator valve.
(5) Disconnect the air cylinder from the 98L36103002000 TEST SET - ENGINE BLEED.
(6) Install the blanking cap on the test port of the PRV.
(a) For PRV standard 6774B and 6714D:
(b) For PRV standard 6774E, 6774F and 6774G:
(7) Safetying with lockwire
14QFB1 Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - .
(8) Install and tighten with your hand the blue blanking cap on the M82000879 TEST PORT UNIVERSAL, if it was removed.
5. Close-up(1) Close the shutoff valve of the air cylinder.
(2) Slowly open the purge valve to depressurize the test set.
(3) Disconnection of the test set
WARNING:
BEFORE YOU START TO REMOVE THE TOOLING, MAKE SURE THAT THERE IS NO PRESSURIZED GAS LEFT INSIDE THE DUCTS. IT CAN CAUSE AN INJURY TO PERSONNEL AND/OR DAMAGE TO EQUIPMENT.
CAUTION:
BE CAREFUL WHEN YOU CONNECT/DISCONNECT THE TEST SET TO/FROM THE EQUIPMENT.
THE PRESSURE REGULATING VALVE AND THE PRESSURE GAGE ASSEMBLY OF THE TEST SET ARE HEAVY AND CAN CAUSE DAMAGE TO THE ENGINE.
(a) Disconnect the short bend flexible assembly from the M82000879 TEST PORT UNIVERSAL and from the 98L36103002000 TEST SET - ENGINE BLEED. (4) Disconnect the M82000879 TEST PORT UNIVERSAL from the test port of the bleed-pressure regulator valve.
(5) Disconnect the air cylinder from the 98L36103002000 TEST SET - ENGINE BLEED.
(6) Install the blanking cap on the test port of the PRV.
(a) For PRV standard 6774B and 6714D:
(b) For PRV standard 6774E, 6774F and 6774G:
(7) Safetying with lockwire
WARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
(a) Safety the blanking cap with lockwire (8) Install and tighten with your hand the blue blanking cap on the M82000879 TEST PORT UNIVERSAL, if it was removed.
Subtask 36-11-52-410-138-B ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the thrust reverser halves (Ref. AMM TASK 78-32-00-410-010):
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR.
Subtask 36-11-52-440-095-B ** ON A/C NOT FOR ALL Subtask 36-11-52-410-139-B ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the thrust reverser halves (Ref. AMM TASK 78-32-00-410-010):
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR.
C. Close Access
(1) Close the fan cowls (Ref. AMM TASK 71-13-00-410-010):
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR.
(2) Remove the WARNING NOTICE(S).
(3) Remove the access platform(s).
Subtask 36-11-52-862-087-B ** ON A/C NOT FOR ALL (1) Close the fan cowls (Ref. AMM TASK 71-13-00-410-010):
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR.
(2) Remove the WARNING NOTICE(S).
(3) Remove the access platform(s).