Removal of the Bleed-Air Precooler Exchanger
TASK 36-11-42-000-804-A
Removal of the Bleed-Air Precooler Exchanger
The weight of this equipment is approximately 41 kg (88 lb). Two persons are necessary to do this task.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 36-11-42-860-055-A
Subtask 36-11-42-020-055-A
[Rev.10 from 2021]
2026.04.01 01:09:20 UTC
Removal of the Bleed-Air Precooler Exchanger
WARNING:
BE CAREFUL WHEN YOU REMOVE OR INSTALL THIS EQUIPMENT. THIS EQUIPMENT IS HEAVY (MORE THAN 12 KG (26.5 lb)) AND CAN CAUSE INJURY AND/OR DAMAGE.
WARNING:
MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START WORK. PRESSURIZED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
BE CAREFUL WHEN YOU DO WORK ON THE ENGINE PARTS AFTER THE ENGINE SHUTDOWN. USE APPLICABLE THERMAL GLOVES. THE ENGINE PARTS CAN STAY HOT FOR ONE HOUR AFTER SHUTDOWN AND CAN BURN YOU.
WARNING:
YOU MUST NOT TOUCH HOT PARTS WITHOUT APPLICABLE GLOVES. HOT PARTS CAN CAUSE AN INJURY.
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
CAUTION:
BE VERY CAREFUL WHEN YOU DO WORK ON OR NEAR THE AIR-CONDITIONING DUCTS. THE DUCTS ARE MADE OF THIN MATERIAL AND YOU CAN EASILY BREAK THEM.
1. Reason for the JobThe weight of this equipment is approximately 41 kg (88 lb). Two persons are necessary to do this task.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE |
| No specific | 1 | CRANE 100KG (220 LB) |
| No specific | AR | PLUG - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | AR | WARNING NOTICE(S) |
| 98D27803000000 | 1 | LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION |
| 98L12003001000 | AR | HARNESS,SAFETY |
| 98L36103000000 | 1 | RI PRECOOLER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 410 | ENG 1 PYLON BOX AND FORWARD FAIRING |
| 420 | ENG 2 PYLON BOX AND FORWARD FAIRING |
| 191DB | |
| FOR [7150HM1] (EXCHANGER-BLEED AIR PRECOOL) | |
| 413CT, 413DT, 413ET | |
| FOR [7150HM2] (EXCHANGER-BLEED AIR PRECOOL) | |
| 423CT, 423DT, 423ET | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-00-00-481-002-A | Installation of the Wingrip |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 27-00-00-480-002-A | Installation of the Flap/Slat Control-Lever Locking Tool (98D27803000000) |
| TASK 36-11-53-000-803-A | Removal of the Overpressure Valve |
| TASK 49-00-00-860-009-A | APU Shutdown by External Power (131-9(A)) |
| TASK 49-00-00-860-009-A-01 | APU Shutdown by Batteries (131-9(A)) |
| TASK 54-52-11-000-807-A | Removal of the Access Skin Panels |
Subtask 36-11-42-860-055-A
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002) or (Ref. AMM TASK 24-41-00-861-002).
Subtask 36-11-42-941-055-A (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002) or (Ref. AMM TASK 24-41-00-861-002).
B. Safety Precautions
(1) Make sure that the engine 1(2) shutdown occurred not less than five minutes before you do this procedure.
(2) On AIR COND panel 30VU:
(7) On FLAPS panel 114VU:
Subtask 36-11-42-865-060-A (1) Make sure that the engine 1(2) shutdown occurred not less than five minutes before you do this procedure.
(2) On AIR COND panel 30VU:
- Make sure that the APU BLEED pushbutton switch is released (ON legend off).
- Make sure that the ENG 1(2) BLEED pushbutton switch is released (OFF legend on).
- Put a WARNING NOTICE(S) in position to tell persons not to operate the pneumatic system.
- Make sure that the ON legend of the ENG/FADEC GND PWR 1(2) pushbutton switch is off.
- Put a WARNING NOTICE(S) in position to tell persons not to energize FADEC 1(2).
- Make sure that the ENG/MODE selector switch is in the NORM position.
- Make sure that the ENG/MASTER 1(2) control switch was in the OFF position not less than five minutes before you do this procedure.
- Put a WARNING NOTICE(S) in position to tell persons not to operate the ENG/MODE selector switch and the ENG/MASTER 1(2) control switch.
- Put a WARNING NOTICE(S) in position to tell persons not to pressurize the pneumatic system.
(7) On FLAPS panel 114VU:
- Put the 98D27803000000 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION in position on the flap/slat control lever (Ref. AMM TASK 27-00-00-480-002).
- Put a WARNING NOTICE(S) on the flap/slat control lever to tell persons not to operate the flap/slat controls.
C. Open, safety and tag this(these) circuit breaker(s):
Subtask 36-11-42-010-057-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | AIR BLEED/ENG 2/MONG | 3HA2 | D12 |
| 49VU | AIR BLEED/ENG 1/CTL | 2HA1 | D11 |
| 122VU | AIR BLEED/ENG 1/MONG | 3HA1 | Z23 |
| 122VU | AIR BLEED/ENG 2/CTL | 2HA2 | Z22 |
D. Get Access
(1) Put an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position.
(2) Remove these access panels (Ref. AMM TASK 54-52-11-000-807):
(a) FOR [7150HM1] (EXCHANGER-BLEED AIR PRECOOL)
413CT, 413DT, 413ET
(b) FOR [7150HM2] (EXCHANGER-BLEED AIR PRECOOL)
423CT, 423DT, 423ET
Subtask 36-11-42-010-058-A (1) Put an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position.
(2) Remove these access panels (Ref. AMM TASK 54-52-11-000-807):
(a) FOR [7150HM1] (EXCHANGER-BLEED AIR PRECOOL)
413CT, 413DT, 413ET
(b) FOR [7150HM2] (EXCHANGER-BLEED AIR PRECOOL)
423CT, 423DT, 423ET
E. Removal of the Components
(1) Remove the upper seals of access panel 413DT or 423DT:
(a) Remove the upper seals (44), (45), (46) and (47) of the access panel (43).
(2) Remove the assembled rib and half-guillotine (38) as follows:
(a) Remove the nuts (39) and screws (33).
(b) Remove the nuts (42) and screws (34).
(c) Remove the nuts (41), screws (31) and washers (30).
(d) Remove the nuts (40), screws (36) and washers (37).
(e) Make the assembled rib and half-guillotine (38) move vertically up to remove it from the fairing support (29).
4. Procedure(1) Remove the upper seals of access panel 413DT or 423DT:
(a) Remove the upper seals (44), (45), (46) and (47) of the access panel (43).
(2) Remove the assembled rib and half-guillotine (38) as follows:
(a) Remove the nuts (39) and screws (33).
(b) Remove the nuts (42) and screws (34).
(c) Remove the nuts (41), screws (31) and washers (30).
(d) Remove the nuts (40), screws (36) and washers (37).
(e) Make the assembled rib and half-guillotine (38) move vertically up to remove it from the fairing support (29).
Subtask 36-11-42-020-055-A
A. Preparation for the Removal of the Bleed-Air Precooler Exchanger
(1) If you use the APU to energize the electrical circuits, stop the APU:
(a) Make sure that the pressure and the temperature of the bleed-air duct system are in ambient conditions.
(4) Record the position of the clamps (2) and (5) before the removal.
(5) Loosen the nuts on the clamps (2) and (5).
(6) Remove the clamps (2) and (5).
(7) Remove the bellows (4) from the precooler exchanger (8) and the wing bleed duct (1). Discard the seal (6).
(8) Disconnect the pipes (7) and (20) from the precooler exchanger (8).
(9) Put a PLUG - BLANKING on the disconnected line end(s).
(10) Remove the Overpressure Valve (OPV) (15) (Ref. AMM TASK 36-11-53-000-803).
Subtask 36-11-42-480-051-A (1) If you use the APU to energize the electrical circuits, stop the APU:
- For GTCP 36-300 APU (Ref. AMM D/O 49-00-00-86)
- For APS 3200 APU (Ref. AMM D/O 49-00-00-86)
- For 131-9(A) APU (Ref. AMM TASK 49-00-00-860-009).
(a) Make sure that the pressure and the temperature of the bleed-air duct system are in ambient conditions.
WARNING:
MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START WORK. PRESSURIZED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
DO NOT TOUCH THE UNIT UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS WHEN YOU DO THE MAINTENANCE TASK(S).
(3) Remove the thermal protection (3) from the bellows (4). (4) Record the position of the clamps (2) and (5) before the removal.
(5) Loosen the nuts on the clamps (2) and (5).
(6) Remove the clamps (2) and (5).
(7) Remove the bellows (4) from the precooler exchanger (8) and the wing bleed duct (1). Discard the seal (6).
(8) Disconnect the pipes (7) and (20) from the precooler exchanger (8).
(9) Put a PLUG - BLANKING on the disconnected line end(s).
(10) Remove the Overpressure Valve (OPV) (15) (Ref. AMM TASK 36-11-53-000-803).
B. Installation of the 98L36103000000 RI PRECOOLER Tool
(1) Make sure that the tool is clean and in the correct condition.
(2) Attach the 98L36103000000 RI PRECOOLER tool to the CRANE 100KG (220 LB).
(3) Put the CRANE 100KG (220 LB) with the 98L36103000000 RI PRECOOLER tool in position above the precooler exchanger (8).
(4) Attach the 98L36103000000 RI PRECOOLER tool to the hoisting points of the precooler exchanger (8).
(5) Obey the tool manufacturer's instructions and install the four links (25) on the precooler exchanger (8).
Subtask 36-11-42-020-056-A (1) Make sure that the tool is clean and in the correct condition.
(2) Attach the 98L36103000000 RI PRECOOLER tool to the CRANE 100KG (220 LB).
(3) Put the CRANE 100KG (220 LB) with the 98L36103000000 RI PRECOOLER tool in position above the precooler exchanger (8).
(4) Attach the 98L36103000000 RI PRECOOLER tool to the hoisting points of the precooler exchanger (8).
(5) Obey the tool manufacturer's instructions and install the four links (25) on the precooler exchanger (8).
C. Removal of the Bleed-Air Precooler Exchanger
(1) Record the position of the bolts (17), (18), (21) and (23) before the removal.
(a) Remove the bolt (17) and washer (16).
(b) Remove the bolt (18) and washer (19).
(c) Remove the bolt (21) and washer (22).
(d) Remove the bolt (23) and washer (24).
(2) Carefully lift the 98L36103000000 RI PRECOOLER tool with the crane until the crane holds the weight of the precooler exchanger (8).
(4) Remove the 98L36103000000 RI PRECOOLER tool from the precooler exchanger (8).
(5) Make sure that the seals (10), (11), (13) and (14) stay on the inlet duct (12).
(6) Put PLUG - BLANKING on the disconnected line ends and on the precooler exchanger (8).
(1) Record the position of the bolts (17), (18), (21) and (23) before the removal.
(a) Remove the bolt (17) and washer (16).
(b) Remove the bolt (18) and washer (19).
(c) Remove the bolt (21) and washer (22).
(d) Remove the bolt (23) and washer (24).
(2) Carefully lift the 98L36103000000 RI PRECOOLER tool with the crane until the crane holds the weight of the precooler exchanger (8).
NOTE: The precooler exchanger weighs 41.2 kg.
(3) Remove the precooler exchanger (8) from the pylon. (4) Remove the 98L36103000000 RI PRECOOLER tool from the precooler exchanger (8).
(5) Make sure that the seals (10), (11), (13) and (14) stay on the inlet duct (12).
(6) Put PLUG - BLANKING on the disconnected line ends and on the precooler exchanger (8).